AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 513     Entry time: Wed Feb 14 14:59:13 2024
Author: JM, CB, NP, ML, AG, AB 
Subject: Run 27 -Beam on target optimisation 

Run 27 Started to check optimsation of the beam - target overlap.

Beam intensity at injection is roughly 1e7 particles

Target density apporx 4.2e11 atoms/cm2 and stable.

Ring pressure is below 1e-10 mbar for all ring sections and stable

First optimisation procedure was to vary the horizontal beam position and see the effect on the count rate in detector #0 (top left) (see elog 509). Beam position was scanned from -9 and -4. Attachment 1 shows the maximum in count rate around the -7.5 position. 

Second optimisation procedure was to change the time ions are allowed to circulate in the ring before being dumped. The count rate over 5 minutes in detector #0 (top left) at ~20 MeV was used as a gauge. This is the only part of the cycle we can control.

Time (s)    Counts

2               148

3               200

4               178

Attachment 1: Target-overlap-scan-optimized.pdf  18 kB  Uploaded Wed Feb 14 17:05:08 2024  | Hide | Hide all
Target-overlap-scan-optimized.pdf Target-overlap-scan-optimized.pdf Target-overlap-scan-optimized.pdf
ELOG V3.1.4-unknown