11:27
Run 29 started. Beam energy is 1.3435 MeV/u with a cooler voltage of 751.3 V.
We observe significantly greater count rate for top right detector (DSSD#1) now that the beam energy has been lowered. ADC over range? Beam target overlap change?
Plan to check optimisation of beam-target overlap and beam settings again.
12:40
Beam lost. Detectors out. R29_11
13:37
Electron cooler is not working again. We will have un-cooled beam again.
Will start a new run 30 for un-cooled beam on target. |