AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 515     Entry time: Thu Feb 15 10:39:50 2024
Author: JM, JG, ML, AG, CB 
Subject: Run29 - beam optimisation 

11:27

Run 29 started. Beam energy is 1.3435 MeV/u with a cooler voltage of 751.3 V.

We observe significantly greater count rate for top right detector (DSSD#1) now that the beam energy has been lowered. ADC over range? Beam target overlap change?

Plan to check optimisation of beam-target overlap and beam settings again.

12:40

Beam lost. Detectors out. R29_11

13:37

Electron cooler is not working again. We will have un-cooled beam again.

Will start a new run 30 for un-cooled beam on target.

ELOG V3.1.4-unknown