AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 58     Entry time: Sat Sep 4 15:54:50 2021
Author: CB RSS 
Subject: Motor mounting preparation 
Prepared the motors to be mounted and 
found all components required. No issues. 
May have to partly dismount again to fix 
bellows depending on ease of mounting.

Note extremely long screws mentioned in 
previous Elog inventory are to be used for 
the motors.

Attempted to swap Pirani gauge with ours 
but realised it's CF and needs appropriate 
port without risk of baking. That port 
would be on the interaction chamber which 
is not going to be mounted. Will probably 
keep using ABD gauge for now.

Peter spotted mistake in mounting front 
foot of CARME which is back to front. 
Correct mount will gain us 2-3 cm but will 
conflict with current CARME position fixed 
by tube on the back. Will discuss options 
with ML.

Motor mounting to take place on Mon with 
local technical support. No activities 
tomorrow unless a solution for the clamps 
mentioned in previous entry is found (i.e. 
what size bolts go on top). Peter will 
check step file and we will consult with 
local engineers on Mon pm.
Attachment 1: 20210904_162517.jpg  2.643 MB  Uploaded Sat Sep 4 17:00:56 2021  | Hide | Hide all
20210904_162517.jpg
Attachment 2: 20210904_162520.jpg  2.608 MB  Uploaded Sat Sep 4 17:01:14 2021  | Hide | Hide all
20210904_162520.jpg
ELOG V3.1.4-unknown