12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN pneumatic only. Left arm = 62.71, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 7 minutes.
Beam on BPM looks to be better than at previous energy.
Pressure in YR09 E target ~ 4.5e-11 mbar.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
13:45 (attachments 5-8)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
15:15(attachments 9-12)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Target density 1e10 atoms/cm2. Still working on the target.
|