Message ID: 582     Entry time: Mon Jun 3 15:17:41 2024
Author: CN, EM, CB 
Subject: Run29  

16:15

In the previous run while working on the target it was discovered that the valve was closed! Probaly this happened around 10 am, we are not sure.

The gas target inlet valve is open again, working on the target.

 

Beam energy = 3 MeV

Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.

Beam intensity at inj ~ 2.5e7

Detectors are positioned IN pneumatic only. Left arm = 62.71, right arm =  64.60 mm

Histograms and stats zero'd, monitoring code restarted.

Beam in the ring ~ 7 minutes.

Pressure in YR09 E target ~ 4.5e-11 mbar.

 

18:03 ( Attchments 1 -4)

Still no target!

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

 

20:23

We have the target back. S1( grafana) 4.8e-8. The target thickness read by the system 5E11 atoms/cm2 but apparently the formula is wrong and the value should be almost e12 atoms/cm2.

. We have now proper beam and target and we

 

Attachment 1: Screenshot_from_2024-06-03_18-04-47.png  164 kB  Uploaded Mon Jun 3 18:07:24 2024  | Hide | Hide all
Screenshot_from_2024-06-03_18-04-47.png
Attachment 2: Screenshot_from_2024-06-03_18-05-11.png  119 kB  Uploaded Mon Jun 3 18:07:24 2024  | Hide | Hide all
Screenshot_from_2024-06-03_18-05-11.png
Attachment 3: Screenshot_from_2024-06-03_18-06-09.png  206 kB  Uploaded Mon Jun 3 18:07:24 2024  | Hide | Hide all
Screenshot_from_2024-06-03_18-06-09.png
Attachment 4: Screenshot_from_2024-06-03_18-06-40.png  579 kB  Uploaded Mon Jun 3 18:07:24 2024  | Hide | Hide all
Screenshot_from_2024-06-03_18-06-40.png
Attachment 5: Screenshot_from_2024-06-03_20-35-00.png  269 kB  Uploaded Mon Jun 3 20:35:22 2024  | Hide | Hide all
Screenshot_from_2024-06-03_20-35-00.png
ELOG V3.1.4-unknown