15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV.
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 5 minutes.
Pressure in YR09 E target ~ 4.5e-11 mbar.
Motors code crashed. Beam removed from ring to re-home detectors.
15:20
Beam in the ring again, detectors homed, no target
Detectors have been set up to send signals on injection / dump
15:35
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
|