Message ID: 588     Entry time: Tue Jun 4 18:08:04 2024
Author: Boudefla Dounia - CB - LB - SD 
Subject: Run 34 

19:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.

Target density ~ fluctuating

Beam intensity at inj ~ 1.7e7

Detectors are positioned IN. Left arm = 36.54, right arm =  64.60 mm

MBS signals saved from motors code

Histograms and stats zero'd, monitoring code restarted.

Beam in the ring ~ 6 minutes.

Pressure in YR09 E target ~ 4.36e-11 mbar.

 

 

Merger error recovered

White rabbit time stamps

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

 

21:27

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

 

23:00

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Statistics attachment 5

Merger attachment 6

 

00:42

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Density is oscillating between E10 and low E11.

attachment 7 is statistics, attachment 8 is temperature, attachment 9 is merger, attachment 10 is spectrum browser.

 

02:20

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Density is oscillating between E10 and low E11. ( last 15 minutes below 2E10)

attachment 11 -13

 

From 2:00 target density falls below 2E10 and started decreasing to the E9 range. At 2:40 we started playing with x-y to get to higher density. At 3:30 we are at 5/6E10 and waiting to see if it stabilizesto that or if it needs more playing.

04:06

Target density being 1-2E11 since 5 minutes

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Attachment 14 statistics, attachment 15 merger

 

05;53

Target density 1E10, sometimes e11, before going down to low E10 and we need to play a bit with x-y to recover it

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Attachment 16-18

 

07:35

Target density 2.5E11, after changiny y position to 1000

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

09:00

Target density has not improved despite efforts last night. Mid 10 - low 11 density range. We have asked HKR to remove beam from the ring and allow access so Nikos can change the nozzle.

Beam off now, access granted. Will begin warming nozzle. Internal cave work on changing nozzle expected to start at 11

Run stopped.

Final monitoring code histogram attached

 

Attachment 1: Screenshot_from_2024-06-04_19-07-40.png  701 kB  Uploaded Tue Jun 4 19:09:49 2024  | Hide | Hide all
Screenshot_from_2024-06-04_19-07-40.png
Attachment 2: Screenshot_from_2024-06-04_19-11-14.png  1.152 MB  Uploaded Tue Jun 4 19:11:58 2024  | Hide | Hide all
Screenshot_from_2024-06-04_19-11-14.png
Attachment 3: Screenshot_from_2024-06-04_21-26-45.png  945 kB  Uploaded Tue Jun 4 21:29:44 2024  | Hide | Hide all
Screenshot_from_2024-06-04_21-26-45.png
Attachment 4: Screenshot_from_2024-06-04_21-26-50.png  991 kB  Uploaded Tue Jun 4 21:29:44 2024  | Hide | Hide all
Screenshot_from_2024-06-04_21-26-50.png
Attachment 5: Screenshot_from_2024-06-04_22-40-39.png  877 kB  Uploaded Tue Jun 4 22:51:31 2024  | Hide | Hide all
Screenshot_from_2024-06-04_22-40-39.png
Attachment 6: Screenshot_from_2024-06-04_22-43-21.png  627 kB  Uploaded Tue Jun 4 22:51:31 2024  | Hide | Hide all
Screenshot_from_2024-06-04_22-43-21.png
Attachment 7: Screenshot_from_2024-06-05_00-44-49.png  739 kB  Uploaded Wed Jun 5 00:52:01 2024  | Hide | Hide all
Screenshot_from_2024-06-05_00-44-49.png
Attachment 8: Screenshot_from_2024-06-05_00-45-21.png  786 kB  Uploaded Wed Jun 5 00:52:01 2024  | Hide | Hide all
Screenshot_from_2024-06-05_00-45-21.png
Attachment 9: Screenshot_from_2024-06-05_00-45-41.png  569 kB  Uploaded Wed Jun 5 00:52:01 2024  | Hide | Hide all
Screenshot_from_2024-06-05_00-45-41.png
Attachment 10: Screenshot_from_2024-06-05_00-47-33.png  856 kB  Uploaded Wed Jun 5 00:52:01 2024  | Hide | Hide all
Screenshot_from_2024-06-05_00-47-33.png
Attachment 11: Screenshot_from_2024-06-05_02-21-37.png  117 kB  Uploaded Wed Jun 5 02:25:52 2024  | Hide | Hide all
Screenshot_from_2024-06-05_02-21-37.png
Attachment 12: Screenshot_from_2024-06-05_02-22-15.png  221 kB  Uploaded Wed Jun 5 02:25:52 2024  | Hide | Hide all
Screenshot_from_2024-06-05_02-22-15.png
Attachment 13: Screenshot_from_2024-06-05_02-22-44.png  158 kB  Uploaded Wed Jun 5 02:25:52 2024  | Hide | Hide all
Screenshot_from_2024-06-05_02-22-44.png
Attachment 14: Screenshot_from_2024-06-05_04-06-59.png  740 kB  Uploaded Wed Jun 5 04:09:05 2024  | Hide | Hide all
Screenshot_from_2024-06-05_04-06-59.png
Attachment 15: Screenshot_from_2024-06-05_04-07-43.png  569 kB  Uploaded Wed Jun 5 04:09:05 2024  | Hide | Hide all
Screenshot_from_2024-06-05_04-07-43.png
Attachment 16: Screenshot_from_2024-06-05_05-55-15.png  949 kB  Uploaded Wed Jun 5 05:57:29 2024  | Hide | Hide all
Screenshot_from_2024-06-05_05-55-15.png
Attachment 17: Screenshot_from_2024-06-05_05-55-49.png  1.047 MB  Uploaded Wed Jun 5 05:57:29 2024  | Hide | Hide all
Screenshot_from_2024-06-05_05-55-49.png
Attachment 18: Screenshot_from_2024-06-05_05-56-34.png  672 kB  Uploaded Wed Jun 5 05:57:29 2024  | Hide | Hide all
Screenshot_from_2024-06-05_05-56-34.png
Attachment 19: Screenshot_from_2024-06-05_09-04-45.png  308 kB  Uploaded Wed Jun 5 09:05:04 2024  | Hide | Hide all
Screenshot_from_2024-06-05_09-04-45.png