21:00
Claude has achieved optimal cooling parameters for the beam
No target and internal work inside the cave tomorrow is required
Run 63 going - beam only background
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS fakemotion script running
High rates on top left dssd again. Cycle left servo motor two times resolved issue
Rates OK. Temps OK. |