AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 633     Entry time: Fri Jun 14 19:59:14 2024
Author: US, LC, CB 
Subject: New run with name of 72 is started due to target issue 

21:00

Target is lost. Background run is being collected.

New run 72 - beam on target with definite target overlap [coasting]

Cooler voltage setpoint 247.3 V.

FC20 read value 246.75 V.

Right arm at 64.60 mm

Left arm IN at 36.54 mm18:00

FakeMotion script running

horizontal beam position 1.0 mm (new beam target overlap)

vertical beam position  -5mm

Beam intensity 6e+7 particles.

Target density ~3e9 at/cm2

Target temperature is 90 K. Values of E1 is 820 Hz, 2.6A, 4.2e-2 mbar

 

Aida03 detector T is stable.SCreenshot is attached.

 

22:27

Cooling fixed. Temps OK.

Attachment 1: Screenshot_from_2024-06-14_21-08-22.png  159 kB  Uploaded Fri Jun 14 21:08:41 2024  | Hide | Hide all
Screenshot_from_2024-06-14_21-08-22.png
Attachment 2: Screenshot_from_2024-06-14_21-08-22.png  159 kB  Uploaded Fri Jun 14 22:28:17 2024  | Hide | Hide all
Screenshot_from_2024-06-14_21-08-22.png
ELOG V3.1.4-unknown