AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 652     Entry time: Wed Jun 19 11:54:26 2024
Author: CB 
Subject: Run 91/92 - moving detectors 

~ 2:00 17 June

 

Run 91

Attempted to move the detectors closer to the beam, and move them in sync with the injection.

Found best position was

Right arm: s by 5 mm, r p in (not moving). No benefits from moving. 10 mm + r p in on sync results in beam clipping during injection. 69.55 mm not moving.

Left arm: s by 5 mm, l p in (in sync with motion). Due to the short beam preparation time, only the trigger out was used as per screenshots below. 23.58 -- 67.90 moving.

Saw spike on leakage current for both detectors on the right arm. Unsure if this because they are being moved, or because they were hit with beam. Leakage current recovered.

 

Run 92 - acquired data as above.

Rutherford locus more clear on left arm detectors. No clear sign of nuclear reactions signals.

Attachment 1: Screenshot_from_2024-06-18_03-07-50.png  198 kB  Uploaded Wed Jun 19 12:58:24 2024  | Hide | Hide all
Screenshot_from_2024-06-18_03-07-50.png
Attachment 2: Screenshot_from_2024-06-18_03-53-51.png  205 kB  Uploaded Wed Jun 19 12:58:24 2024  | Hide | Hide all
Screenshot_from_2024-06-18_03-53-51.png
Attachment 3: Screenshot_from_2024-06-18_04-20-15.png  1.125 MB  Uploaded Wed Jun 19 12:59:07 2024  | Hide | Hide all
Screenshot_from_2024-06-18_04-20-15.png
Attachment 4: Screenshot_from_2024-06-18_04-20-18.png  954 kB  Uploaded Wed Jun 19 12:59:07 2024  | Hide | Hide all
Screenshot_from_2024-06-18_04-20-18.png
Attachment 5: Screenshot_from_2024-06-18_04-20-21.png  1.262 MB  Uploaded Wed Jun 19 12:59:07 2024  | Hide | Hide all
Screenshot_from_2024-06-18_04-20-21.png
ELOG V3.1.4-unknown