AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 693     Entry time: Tue May 27 05:03:41 2025
Author: JM 
Subject: DAQ restart 

06:00

FEE modules power cycled.

No issues on power cycle restart.

All system check OK - clock status, ADC calibration etc.

ASIC settings loaded are the same as previous startup. Slow comparator thresholds 0x32 (500 keV) and all FEEs set to LEC.

Statistics (ADC data) - attachment 1. Note aida10 fluctuations between 10,000 and 300 which appears to be a physics effect (beam on target)

Spectrum browser - layout 1 - attachment 2

Merger - attachment 3

Tape server - attachment 4 Data rate is about 300 kB/sec.

FEE temperatures OK

Waveforms - attachments 4,5

All Lekagae currents appear normal

Online monitoring scropt started. Beam on target. Run 22 started. See nect elog for details.

Attachment 1: Screenshot_from_2025-05-27_06-09-45.png  111 kB  Uploaded Tue May 27 06:11:48 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-09-45.png
Attachment 2: Screenshot_from_2025-05-27_06-10-13.png  189 kB  Uploaded Tue May 27 06:11:48 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-10-13.png
Attachment 3: Screenshot_from_2025-05-27_06-10-29.png  126 kB  Uploaded Tue May 27 06:11:48 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-10-29.png
Attachment 4: Screenshot_from_2025-05-27_06-11-22.png  107 kB  Uploaded Tue May 27 06:11:48 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-11-22.png
Attachment 5: Screenshot_from_2025-05-27_06-13-59.png  165 kB  Uploaded Tue May 27 06:15:20 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-13-59.png
Attachment 6: Screenshot_from_2025-05-27_06-14-43.png  168 kB  Uploaded Tue May 27 06:15:20 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-14-43.png
Attachment 7: Screenshot_from_2025-05-27_06-16-04.png  40 kB  Uploaded Tue May 27 06:16:54 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-16-04.png
ELOG V3.1.4-unknown