AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 694     Entry time: Tue May 27 05:24:05 2025
Author: LB,SN, L. Cs. P. J. W. 
Subject: Run 22, 23 - 1.95 MeV/A 

27/05/2025 ca. 6:00

We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.

Cooler voltage setpoint  1105.7 V

Attachment 8 - beamcalc with actual values

Next entry - beamcalc with set values

 

Right arm at 19.80 mm

Left arm IN at 77.56 mm (OUT 32.53 mm)

vertical beam position 0.0 mm

horizontal beam position  -3.5mm

Beam intensity 1.7e+7 particles.

Target density ~6e11 at/cm2

Target temperatures: T1=31.5 K T2=35.2 K

Beam cycle set to 10 seconds.

All check are Ok!

6:30

Noticed a small spike in all leakage currents, see attachment 1

6:50

all checks ok!

 

07:40

All checks are Ok!

Aida 10 shows sometimes higher statistics.

 

09:02

All checks are Ok!

Aida 10 shows sometimes higher statistics.

 

10:00

Checks OK.

Compression works OK.

Moved to run 23. Now moving RIGHT hand side detectors instead of LEFT hand side.

Motion 37.96 mm -> 83.69 mm

Left arm stationary at 18.86 mm

Planning to change energy around lunch.

 

11:35

Parameters are OK! Tragte density dropped down a bit: ~6e11 at/cm2

 

12:35

Parameters are OK! Tragte density dropped down a bit: ~1e12 at/cm2

 

13:10

Starting beam energy change. Detectors OUT.

Attachment 1: Screenshot_from_2025-05-27_06-31-48.png  21 kB  Uploaded Tue May 27 06:32:50 2025  | Hide | Hide all
Screenshot_from_2025-05-27_06-31-48.png
Attachment 2: Screenshot_from_2025-05-27_07-40-10.png  151 kB  Uploaded Tue May 27 07:41:22 2025  | Hide | Hide all
Screenshot_from_2025-05-27_07-40-10.png
Attachment 3: Screenshot_from_2025-05-27_07-40-21.png  377 kB  Uploaded Tue May 27 07:41:22 2025  | Hide | Hide all
Screenshot_from_2025-05-27_07-40-21.png
Attachment 4: Screenshot_from_2025-05-27_09-22-51.png  175 kB  Uploaded Tue May 27 09:23:30 2025  | Hide | Hide all
Screenshot_from_2025-05-27_09-22-51.png
Attachment 5: Screenshot_from_2025-05-27_09-23-06.png  507 kB  Uploaded Tue May 27 09:23:30 2025  | Hide | Hide all
Screenshot_from_2025-05-27_09-23-06.png
Attachment 6: Screenshot_from_2025-05-27_11-34-21.png  130 kB  Uploaded Tue May 27 11:37:10 2025  | Hide | Hide all
Screenshot_from_2025-05-27_11-34-21.png
Attachment 7: Screenshot_from_2025-05-27_11-34-36.png  373 kB  Uploaded Tue May 27 11:37:10 2025  | Hide | Hide all
Screenshot_from_2025-05-27_11-34-36.png
Attachment 8: screenshot-2025-05-29_11-30-30730985236495866200.png  122 kB  Uploaded Thu May 29 11:33:25 2025  | Hide | Hide all
screenshot-2025-05-29_11-30-30730985236495866200.png
ELOG V3.1.4-unknown