AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 716     Entry time: Tue Jun 3 11:16:07 2025
Author: EW, EM, JM 
Subject: Run 47, beam only background 

Run 47 started. Target cooling down after water cooler failure, beam only background

D+ beam deuterium target. D+ beam energy is 0.5 MeV/u. (beam calc calculation is 0.5143 MeV/u). See previous entry for beamcalc.

All four detectors positioned fully out and stationary.

Left potentiometer = 18.86 mm

Right potentiometer = 19.8 mm

Ring cycle time is 10 seconds.

Cooler set value = 297.2 V, 8 mA. Read value = 296.477 V, 6.97 mA

All leakage currents look good (except dssd4, currently stable at V=40)

Beam position. Vertical =0.0mm , Horizontal=0.0 mm

Data rate ~ 25kB/s

13:00

Run stopped to allow tuning of parameters for 0.35 MeV/u

Attachment 1: Screenshot_from_2025-06-03_12-20-25.png  132 kB  Uploaded Tue Jun 3 12:20:34 2025  | Hide | Hide all
Screenshot_from_2025-06-03_12-20-25.png
Attachment 2: Screenshot_from_2025-06-03_12-19-36.png  45 kB  Uploaded Tue Jun 3 12:20:44 2025  | Hide | Hide all
Screenshot_from_2025-06-03_12-19-36.png
ELOG V3.1.3-7933898