AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 720     Entry time: Thu Jun 5 08:50:00 2025
Author: JM, CF, CB, EW 
Subject: Run 51 - background 

09:49

DSSD4 has been biased to 100V in steps of 5V from 60V. It was previously stable overnight at 60V - attachment 1

Will keep an eye on it but looks OK at the moment. Current bias and leakage current - attachment 2

I have reset DSSD4 FEES (13,14,15,16) to the LEC and lowered the thresholds to be in line with other FEES.

Current slow comparator threshold for all FEES is 0x14 (200 keV).

Attachment 3 shows current ADC data items statistics.

Started a new run 51 with no beam and no target. Access to the cave is allowed.

Current data rate is 800 kB/sec.

All statistics and histograms in aida zero'd

12:57

Temps OK

Rates OK - attached

Merger OK

System wide checks

 

14:58

Temps - OK

Rates - OK

Merger - OK

 

15:00

Beam tuning to start soon. No storage.

Attachment 1: Screenshot_from_2025-06-05_09-38-05.png  20 kB  Uploaded Thu Jun 5 09:50:41 2025  | Hide | Hide all
Screenshot_from_2025-06-05_09-38-05.png
Attachment 2: Screenshot_from_2025-06-05_09-46-08.png  40 kB  Uploaded Thu Jun 5 09:51:22 2025  | Hide | Hide all
Screenshot_from_2025-06-05_09-46-08.png
Attachment 3: Screenshot_from_2025-06-05_09-51-43.png  114 kB  Uploaded Thu Jun 5 09:53:06 2025  | Hide | Hide all
Screenshot_from_2025-06-05_09-51-43.png
ELOG V3.1.3-7933898