AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 721     Entry time: Thu Jun 5 16:54:18 2025
Author: EW, ST, CB 
Subject: Run 52 - 0.3 MeV/A 

Run 52 started at 17:53. Everything is running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam energy is now 0.3 MeV/u. (beam calc calculation is 0.3067 MeV/u).

All four detectors positioned fully out and stationary and also detector #4 is running again.

Left potentiometer = -3.03mm (corresponds to x = 0, which is the more trustworthy value)

Right potentiometer = 1.82 mm (corresponds to y = -1000, which is the more trustworthy value)

Ring cycle time is 5 seconds.

Cooler set value = 177.9 V, 4 mA. Read value = 177.65 V, 3.53 mA

All leakage currents look good.

Beam position. Vertical =0.0mm , Horizontal=1.0 mm

Data rate ~ 947kB/s

18:09: System check - everything perfect!

Leakage current attachment 1

Rates attachment 2

19:50: System check - everything marvelous!

22:05: System check - everything excellent!

22:50: System check - everything fabulous!

current spectra attachment 3

 

02:05

Temperatures OK

System wide checks OK

Statistics OK

Merger OK

Leakage current OK

Ring vacuum OK

 

04:52

Temps OK

System wide checks OK

Stats OK - attached

Merger OK - attached

Leakage OK - attached

Histos look good - attached

 

07:10

Temps OK

System wide checks OK

Stats OK - attached

Merger OK - attached

Leakage OK - attached

Histos look good - attached

 

11:31

All checks OK

13:54

All checks OK

Rates attached

 

 

 

 

Attachment 1: Screenshot_from_2025-06-05_18-10-19.png  49 kB  Uploaded Thu Jun 5 18:10:33 2025  | Hide | Hide all
Screenshot_from_2025-06-05_18-10-19.png
Attachment 2: Screenshot_from_2025-06-05_18-10-12.png  132 kB  Uploaded Thu Jun 5 18:10:45 2025  | Hide | Hide all
Screenshot_from_2025-06-05_18-10-12.png
Attachment 3: Screenshot_from_2025-06-05_22-52-55.png  251 kB  Uploaded Thu Jun 5 22:53:14 2025  | Hide | Hide all
Screenshot_from_2025-06-05_22-52-55.png
Attachment 4: Screenshot_from_2025-06-06_04-51-26.png  133 kB  Uploaded Fri Jun 6 04:53:14 2025  | Hide | Hide all
Screenshot_from_2025-06-06_04-51-26.png
Attachment 5: Screenshot_from_2025-06-06_04-51-37.png  131 kB  Uploaded Fri Jun 6 04:53:26 2025  | Hide | Hide all
Screenshot_from_2025-06-06_04-51-37.png
Attachment 6: Screenshot_from_2025-06-06_04-51-48.png  169 kB  Uploaded Fri Jun 6 04:53:36 2025  | Hide | Hide all
Screenshot_from_2025-06-06_04-51-48.png
Attachment 7: Screenshot_from_2025-06-06_04-52-07.png  49 kB  Uploaded Fri Jun 6 04:53:45 2025  | Hide | Hide all
Screenshot_from_2025-06-06_04-52-07.png
Attachment 8: Screenshot_from_2025-06-06_07-18-22.png  146 kB  Uploaded Fri Jun 6 07:19:46 2025  | Hide | Hide all
Screenshot_from_2025-06-06_07-18-22.png
Attachment 9: Screenshot_from_2025-06-06_07-17-45.png  23 kB  Uploaded Fri Jun 6 07:20:14 2025  | Hide | Hide all
Screenshot_from_2025-06-06_07-17-45.png
Attachment 10: Screenshot_from_2025-06-06_07-17-21.png  232 kB  Uploaded Fri Jun 6 07:20:29 2025  | Hide | Hide all
Screenshot_from_2025-06-06_07-17-21.png
Attachment 11: Screenshot_from_2025-06-06_07-16-45.png  110 kB  Uploaded Fri Jun 6 07:20:40 2025  | Hide | Hide all
Screenshot_from_2025-06-06_07-16-45.png
Attachment 12: Screenshot_from_2025-06-06_13-55-31.png  114 kB  Uploaded Fri Jun 6 13:56:18 2025  | Hide | Hide all
Screenshot_from_2025-06-06_13-55-31.png
Attachment 13: Screenshot_from_2025-06-06_13-59-12.png  232 kB  Uploaded Fri Jun 6 13:59:31 2025  | Hide | Hide all
Screenshot_from_2025-06-06_13-59-12.png
Attachment 14: beamCalc-0.3.png  88 kB  Uploaded Tue Jun 10 10:37:38 2025  | Hide | Hide all
beamCalc-0.3.png
ELOG V3.1.4-unknown