Run 52 started at 17:53. Everything is running again. We started at 3E12 at/cm2
D+ beam deuterium target. D+ beam energy is now 0.3 MeV/u. (beam calc calculation is 0.3067 MeV/u).
All four detectors positioned fully out and stationary and also detector #4 is running again.
Left potentiometer = -3.03mm (corresponds to x = 0, which is the more trustworthy value)
Right potentiometer = 1.82 mm (corresponds to y = -1000, which is the more trustworthy value)
Ring cycle time is 5 seconds.
Cooler set value = 177.9 V, 4 mA. Read value = 177.65 V, 3.53 mA
All leakage currents look good.
Beam position. Vertical =0.0mm , Horizontal=1.0 mm
Data rate ~ 947kB/s
18:09: System check - everything perfect!
Leakage current attachment 1
Rates attachment 2
19:50: System check - everything marvelous!
22:05: System check - everything excellent!
22:50: System check - everything fabulous!
current spectra attachment 3
02:05
Temperatures OK
System wide checks OK
Statistics OK
Merger OK
Leakage current OK
Ring vacuum OK
04:52
Temps OK
System wide checks OK
Stats OK - attached
Merger OK - attached
Leakage OK - attached
Histos look good - attached
07:10
Temps OK
System wide checks OK
Stats OK - attached
Merger OK - attached
Leakage OK - attached
Histos look good - attached
11:31
All checks OK
13:54
All checks OK
Rates attached
|