AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 746     Entry time: Sun Jun 15 07:01:37 2025
Author: EW, EM 
Subject: Run 80 

08:00 New run started - run 80

Run whilst they are optimising the beam after losing it, everything else same as previous runs

ROOT histograms NOT zeroed

All checks fine

09:05 All checks okay

Attachment 5 current histograms zoomed into area of interest, detector 3 only proton peak visible

10:00 All checks okay

11:00 All checks okay

11:45 Run stopped as beam is back

Attachment 1: Screenshot_from_2025-06-15_08-09-05.png  131 kB  Uploaded Sun Jun 15 08:09:29 2025  | Hide | Hide all
Screenshot_from_2025-06-15_08-09-05.png
Attachment 2: Screenshot_from_2025-06-15_08-09-00.png  148 kB  Uploaded Sun Jun 15 08:09:38 2025  | Hide | Hide all
Screenshot_from_2025-06-15_08-09-00.png
Attachment 3: Screenshot_from_2025-06-15_08-08-05.png  130 kB  Uploaded Sun Jun 15 08:09:46 2025  | Hide | Hide all
Screenshot_from_2025-06-15_08-08-05.png
Attachment 4: Screenshot_from_2025-06-15_08-07-56.png  161 kB  Uploaded Sun Jun 15 08:09:55 2025  | Hide | Hide all
Screenshot_from_2025-06-15_08-07-56.png
Attachment 5: Screenshot_from_2025-06-15_09-55-36.png  241 kB  Uploaded Sun Jun 15 09:56:43 2025  | Hide | Hide all
Screenshot_from_2025-06-15_09-55-36.png
ELOG V3.1.4-unknown