Entry  Mon Oct 11 11:24:16 2021, RSS TD ML, Valve support and cable labeling IMG_4962.JPGIMG_4969.JPG.svgIMG_4968.JPG.svg
Split funnels were given to Oemer for cleaning. Have received them back after lunch.

Valve support is installed again (see picture 1).

Ion pump was connected but not activated. Michael will help in doing so. No vacuum support to help will RGA. Will proceed without it.
Entry  Tue Oct 12 09:22:37 2021, RSS TD + OG DR, Motors problem solved IMG_4971.JPGIMG_4970.JPG
Neg and ion cables were taken off and were put in the box.

Top support was taken off.

Motors are rotating again. Have to be careful with the position of the limit switches.
Entry  Wed Oct 13 15:28:22 2021, RSS TD + OG, Split funnels 7x
Split funnels installed on 4 (of 8) 2x78 way D connector feed-throughs.
Entry  Wed Nov 10 18:38:16 2021, RSS TD + ML OG AK NK, CARME wrapped in heating tape IMG_5514(1).JPGIMG_5517(1).JPGIMG_5518.JPGIMG_5520.JPGIMG_5521(1).JPG
Heating and electronic experts were in CRYRING and were unhappy with the damaged wire. Heaters were opened by OG, but no damage was found. It is suggested
to replace the entire wire and then get it approved by the concerned authority.

To avoid further delays, ML and TD agreed on heating tapes/wires covering the chamber. OG helped in wrapping the heating wire around. Tent is
Entry  Fri Oct 15 19:37:12 2021, RSS TD + DR, Friday 15 October 8x
Ring seal is out. See picture 1.

Bellow (towards CARME) was installed in the gas jet chamber. Attached are some pictures.
Entry  Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August  23x
Pirani  IE514
mbar    mbar
Entry  Wed Aug 18 07:07:26 2021, RSS TD, 18-24 August 25x

Pirani  IE514
mbar    mbar


18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8


 

-------------------------------------------------------------

19/8/21  08:00  0.0032  3.38e-8
Entry  Wed Aug 25 07:02:41 2021, RSS TD, 25-31 August 19x

Pirani  IE514
mbar    mbar


25/8/21 08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00  0.0030   1.77e-8

----------------------------------------------------
Entry  Wed Oct 13 12:06:09 2021, RSS TD, Flanges cleaned 12x
RSS & TD had some success cleaning the COF600 flange surfaces of the staining and residues observed when the downstream COF600 section was opened yesterday
 
https://elog.ph.ed.ac.uk/CARME/118
Entry  Sat Oct 16 17:25:47 2021, RSS TD, Broken detectors IMG_5098.JPGIMG_5097.JPGIMG_5096.JPGIMG_5106.JPGIMG_5105.JPG
One of the detectors was damaged while mounting (see pictures 1-3).

Second detector was found already damaged when opened (see pictures 4-5).
Entry  Sat Feb 26 04:36:38 2022, RSS TD, Saturday 26 February 07:00-15:00 27x
05:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar as reported earlier
      See attachments 1 & 2
      E4 pressure not < 5e-10mbar - wait to startup gas jet target
Entry  Sun Feb 27 06:23:42 2022, RSS TD, Current status 6x
Ring current ~6e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.44 uA 
Entry  Sun Feb 27 06:58:51 2022, RSS TD, Current status 8-xy-2022-02-27_08-10-15.png8-ey-2022-02-27_08-09-46.png8-ex-2022-02-27_08-09-29.pngScreenshot_from_2022-02-27_07-16-30.png
7:59: 95K-->120K

8:06: 120K --> 95K

Ring current ~7e7 particles/s
Entry  Sun Feb 27 08:00:23 2022, RSS TD, Current status 9-xy-2022-02-27_09-00-57.png9-ey-2022-02-27_09-00-03.png9-ex-2022-02-27_08-59-48.png
Ring current ~7.5e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.44 uA 
Entry  Sun Feb 27 09:00:09 2022, RSS TD, Current status 7x
10:00: 95K-->120K

10:08: 120K --> 95K

Ring current ~7e7 particles/s
Entry  Sun Feb 27 10:00:07 2022, RSS TD, Current status 11-xy-2022-02-27_11-01-22.png11-ey-rate2022-02-27_11-00-46.png11-ex-rate-2022-02-27_11-00-27.png
Ring current ~9e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.43 uA 
Entry  Sun Feb 27 11:00:08 2022, RSS TD, Current status 12-xy-2022-02-27_12-16-19.png12-yrate-2022-02-27_12-15-42.png12-xrate-2022-02-27_12-15-03.png
12:00: 95K-->120K

12:07: 120K --> 95K

Ring current ~6e7 particles/s
Entry  Sun Feb 27 12:00:13 2022, RSS TD, Current status 13-xy-2022-02-27_13-01-36.png13-yrate-2022-02-27_13-01-06.png13-xrate-Screenshot_from_2022-02-27_13-00-50.png
Ring current ~7.7e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.43 uA 
Entry  Sun Feb 27 13:34:24 2022, RSS TD, Current status 
14:33: 95K-->140K

14:44: 140K --> 95K

Ring current ~6e7 particles/s
Entry  Fri Nov 12 08:54:11 2021, RSS ML + CB (remotely) NK AK NP, First CARME baking attempt Capture.PNG200W_heaters.svg40W_heater.svg
07:50 Small leaks (near the motors and upper valve) were detected in the tent which were covered with Al foil.

08:10 ML changed the baking temperature to 120 degrees.

09:40 Since the bottom of CARME is cold, due to uneven distribution of heat, baking is stopped.