Entry  Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough 4.png3.png

17:30 File G22-88/R8

Pulser walkthrough

EGG Ortec 448 Pulser

Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r
100ns
Tau_d 50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )



18:10 Moved to new run R9

Pulser off. Overnight background.
Entry  Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png

13.41 DAQ start - file G22-88/R4
Entry  Tue May 28 15:25:21 2024, TD, JM, CB, Pulser tests Screenshot_from_2024-05-28_16-14-56.pngScreenshot_from_2024-05-28_16-15-43.pngScreenshot_from_2024-05-28_16-16-18.pngScreenshot_from_2024-05-28_16-20-05.pngScreenshot_from_2024-05-28_16-28-46.png
R3 started

Pulser ON. Approx 2 kHZ.

1.8*w waveforms attachments 1+2
Entry  Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough 

15:06
Run25

Pulser walkthrough

EGG Ortec 448 Pulser

Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r 100ns
Tau_d
50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )
Entry  Sat Apr 26 22:01:37 2025, CB, Proxy bridge 
Proxy bridge enabling anydesk and generic Internet access dropped due to atppc025 being rebooted. Found it dropped again late today.

Restarted bridge inside a screen session.
Entry  Thu Feb 24 23:15:25 2022, Rui-Jiu Chen, Alex, Problems with ion souce. 
 
Entry  Fri Feb 25 11:20:30 2022, CB, Pressure and temperature data saved 
Saved pressure reading and temperature data logs from internal target in /TapeServer/22Feb/OtherData

Leakage current data is saved in /home/npg/Programs/caenlogger

 
Entry  Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 20210903_085646.jpgIMG_4487.JPG
03.09.2021   09:00   5.27E-7 mbar     
03.09.2021   13:00   4.08E-7 mbar                   
Entry  Fri Sep 10 10:50:55 2021, CB RSS ML, Pressure after overnight pump down 20210910_101131.jpg
Pressure found in 10-7 mbar range.

Decided to leak test anyway for safety.
Entry  Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open  20230427_123456.jpg20230427_161602.jpg
Removed turbo pump and set aside in a box. Considering switching to the other turbo to avoid degradation due to lack of use.

 

Installed bellows support and OG devised support to avoid bellows sagging when Carme is split open.
Entry  Wed Aug 30 10:28:36 2023, CB, Preparing for pumps on 
We need to connect the non-bakeable (max 80C) wire of the ion pump belonging to the vacuum division, and we also need to connect the two newly-repaired
NEG cables to the D2000 modules. That requires partly opening the tent to gain access.

Set heaters temperature from 450 C -> 400 C - CARME floating TC temperature goes from ~98 C to ~88C.
Entry  Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown turbo_pump.pnglog_scale.png
Found CARME pressure at 2E-7 mbar

Raspberry pi took pictures until 4 am and 
Entry  Fri Oct 29 15:09:27 2021, CB JM + RSS OG DR, Preparation to mount new DSSDs 6x
(Mon 25 October - Tue 26 October)

Considered different strategies to mount DSSDs inside CARME, while waiting for 2x new DSSD to arrive.

Plan A: Mount DSSDs on plate on the bench, slide plate on rod, then attach cables, then attach strain relief
Entry  Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
(30 August 2021)

The current state of YR09 is as per attach 1. CCC has been removed, but additional pumps and gauges remain. Some
Entry  Sat Nov 6 14:21:10 2021, CB RSS, Preparation for bakeout tent mounting + to do for next week 
Connected pneumatic hoses prepared by Gleb. Opened flow to pressure reducer set at 2 bar. Ok. Attempted to operate pneumatic motors. Somehow left / right
pneumatic motors controls swapped around! Works fine otherwise. Most likely hardware issue, i.e. hoses are inverted inside motor box. Software fix possible
in principle. Probably easiest to swap hoses going out from motor box (top to bottom and vice versa). Could not pull out hoses after installing. To do
Entry  Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 20210901_125504.jpg20210901_125517.jpg
Mounted additional cross member for motor 
support. See attach 1
Entry  Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount 20230424_155635.jpg20230424_155607.jpg20230424_150526.jpg
CARME currently in vacuum, pressure ~3E-10 mbar. Chamber to be vented tomorrow afternoon by vacuum division. We have active both pirani and hot cathode
gauge to aid. 

Equipment removed from the chamber in preparation for dismount of CARME from the ring this week. Equipment removed includes:
Entry  Wed Oct 18 16:47:36 2023, JG, CB, Power outage 
Local power outage at the CRYRING today, while JG was trying to activate the ion pumps. Unlcear what caused it.

Valve on scroll worked as intended, but CARME reacehd 1E-7 mbar from turbo (?) venting.

Power restored. Pressure back in the 1E-11 mbar range, decreasing.
Entry  Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave 
ML reports power cut in CRYRING cave. Reasons unknown. No effect on vacuum, but top valve closed for safety reason. Ramping down temperature.
Entry  Wed Sep 29 09:27:38 2021, CB (remotely), RSS JM ML, Power cut 
Sudden and unexpected power cut at 10:02 German time, affecting all the target hall.

It has been caused by the emergency alarm being triggered. Reasons unclear. Electricians were informed.