AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 21 of 38  ELOG logo
Entry  Tue Mar 1 20:41:28 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 19:41:24 2022, PM, LV, target temperature walkthrough 
A target temperature walkthrough has been initiated at 20:41 since the target density at S1 had slightly decreased (with ~0.1-0.2)

Current temprature 116K

set to 126K at 20:41
Entry  Tue Mar 1 19:40:28 2022, PM, LV, check 12x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 18:43:41 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 17:36:04 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 16:57:34 2022, CB, LV, PMH, New run 
Beam issues due to too long storage time in the last hours. Motors moved out and not moving.

Decreased storage time to 70 s. Seems OK now. Restarted motor movement as before

Started new run R86
Entry  Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' : no change
Entry  Tue Mar 1 12:58:32 2022, CB, MS, SS, ML, Synced pneumatic motion 
New run R84

Attempting to sync pneumatic movement with ring. Still see something on t out -> p out

Command to move out was being given relative to the wrong time.
Entry  Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': no change
Entry  Tue Mar 1 10:43:36 2022, MS, SHB, check  11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': same

 
Entry  Tue Mar 1 10:35:59 2022, MS, SHB, next run on tape server tab 
old potentiometer position 19.1 mm

new run number: 83

new potentiometer position : 27.58 mm
Entry  Tue Mar 1 08:02:26 2022, SHB, MS, check 11x
 

'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes
Entry  Tue Mar 1 06:35:42 2022, SHB, MS, check 11x
detector motors are still out

'Check Clock Status', 'Check ADC Calibration' : Clock status test result: Passed 5, Failed 0

'Check the White rabbit decoder status' :  
Entry  Tue Mar 1 06:04:04 2022, SHB, MS, positions 
just FYI: current positions saved in files are x=1000 and y=-750. this information is good in case of crash.

 
Entry  Tue Mar 1 05:23:02 2022, JM, EM, Current status  2022-03-01_06-42-53-ExRate.png
06:20

Servo motors moved to fully out position as some work on the beam was neccessary. Beam injection had dropped from ~9e7 to around 1e7. Potentiometer
reads 19.10 mm.   
Entry  Tue Mar 1 04:07:31 2022, JM, EM, Temperature cycle 
Have been unable to achieve decent target density with temperature cycling so far. Will attempt to go up to 300 k and back down to around 115 k which
proved successful in previous shifts.
Entry  Tue Mar 1 03:34:28 2022, JM, EM, Current status 7x
Temperature setpoint = 116 k

Detector IN potentiometer = 34.89 mm

Rutherford rate is reduced from previous entries. Avergae peak height appears to be ~50 counts. Fluctuations in peak height and E4 pressure are
Entry  Tue Mar 1 03:19:50 2022, JM, EM, Temperature Cycle 
04:20

Did another temperature cycle (118 K -> 125 K -> 95 K -> 116 K) trying to improve the pressures at the target and the detector count
rate.
Entry  Tue Mar 1 02:15:29 2022, JM, EM, Current status 6x
03:15

The nozzle motor control at the target crashed, but operation has been restored.

Temperature setpoint = 116 K
Entry  Mon Feb 28 23:54:02 2022, JM, EM, Current Status, Temperature cycle 2022-03-01_00-57-44-Exrate.png2022-03-01_00-58-41-ExTotal.png2022-03-01_00-58-14-EyTotal.png
00:51

Temperature setpoint = 116 K

Detector position IN potentionmeter = 34.89mm
ELOG V3.1.4-unknown