|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME, Page 21 of 34 |
 |
|
New entries since: | Thu Jan 1 01:00:00 1970 | |
Thu Feb 24 22:45:08 2022, Jordan, George, Rui-Jiu Chen, check 14x
|
Thu Feb 24 14:31:25 2022, JM, ML, CN, Beam Tuning Run 76 6x
|
Thu Feb 24 09:43:16 2022, JG, MS, check 13x
|
Thu Feb 24 08:30:36 2022, JG, MS, AIDA5 calibration test failed - solved 
|
Thu Feb 24 08:15:23 2022, JG, MS, check 13x
|
Thu Feb 24 07:25:53 2022, OH (Remote), Recover of system after crash
|
Thu Feb 24 05:09:47 2022, CB, PE, EM, Inlet valve at target closed + problems with turbopump
|
Thu Feb 24 04:17:35 2022, CB, TD (remotely), MIDAS DAQ no longer working 
|
Wed Feb 23 22:29:50 2022, PE, EM, CB (remotely), check - 23:30
|
Wed Feb 23 21:27:29 2022, TD, CN, check 11x
|
Wed Feb 23 20:52:56 2022, CN, TD, System wide checks 11x
|
Wed Feb 23 20:06:43 2022, TD CN, E141 kinematics
|
Wed Feb 23 19:22:55 2022, CN, TD, check 10x
|
Wed Feb 23 18:58:12 2022, TD CN, Wednesday 23 February 15.00-23.00 shift 6x
|
Wed Feb 23 16:57:35 2022, CB, CN, Optimising motor motion
|
Wed Feb 23 10:56:06 2022, Laszlo, Thanassis, Current status 10x
|
Wed Feb 23 09:50:19 2022, Laszlo, Thanassis, Moving detector in
|
Wed Feb 23 08:58:30 2022, Laszlo, Thanassis, Current status 10x
|
Wed Feb 23 07:58:38 2022, Laszlo, Thanassis, Current status 10x
|
Wed Feb 23 06:58:19 2022, Laszlo, Thanassis, Current status 11x
|
|