ID |
Date |
Author |
Subject |
244
|
Tue Feb 22 21:09:39 2022 |
David, Yuri | Current status | Pressure seems as before 19:10.
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine
Leakage current (WS4): 3.47 uA , stable current
DAQ (WS2): temperature checked, clock status:ok, adc calibration:ok, white rabbit check:ok
DAQ (WS2): everything ok
Online monitoring (WS 5): done |
243
|
Tue Feb 22 20:08:40 2022 |
David, Yuri | Current status | Recently the pressure started to raise a bit, we have increased the temperature from 129.1 K to 129.2 K. Current pressure at S1 2.10e-7.
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current
DAQ (WS2): temperature checked, clock status:ok, adc calibration:ok, white rabbit check:ok
DAQ (WS2): everything ok
Online monitoring (WS 5): done |
242
|
Tue Feb 22 19:28:35 2022 |
David, Yuri | vacuum | At 19:10 Frank called us that vacuum in sections 08 and 10 got worse by about 1.5 times. There is a possible danger that vacuum valves can get closed if rest gas pressure is above the set treshhold.
Nikos warmed the cryostat by 0.5 degrees from 129.0 K to 129.5 K and the pressure became better than before. We cooled the system in steps of 0.1 degress down to 129.1 K and again observed the pressure rise.
We think we can stay with the present conditions. However, the pressure shall be monitored not to hit the treshhold. |
241
|
Tue Feb 22 19:11:18 2022 |
David | Current status | Still trying to recover previous pressures, more details in the next entry.
Merger, Tape server (WS3) checks: DONE, writing ~1030 kB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current
DAQ (WS2): temperature checked,
DAQ (WS2): everything ok
Online monitoring (WS 5): done; |
240
|
Tue Feb 22 18:23:02 2022 |
David. Yury | Vacuum problem | At 19:10 the vacuum has increased suddenly everywhere in the ring, roughly a factor 1.5. |
239
|
Tue Feb 22 17:32:38 2022 |
David | Current status | Michael is modifying the settings of the electron cooler --> changed beam from bunched to coasting
Merger, Tape server (WS3) checks: DONE, writing ~1036 kB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current
DAQ (WS2): temperature checked,
- clock status:
Clock status test result: Passed 5, Failed 0
Understand status as follows
Status bit 3 : firmware PLL that creates clocks from external clock not locked
Status bit 2 : always logic '1'
Status bit 1 : LMK3200(2) PLL and clock distribution chip not locked to external clock
Status bit 0 : LMK3200(1) PLL and clock distribution chip not locked to external clock
If all these bits are not set then the operation of the firmware is unreliable
- adc calibration:
Calibration test result: Passed 5, Failed 0
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module
- white rabbit check:
Base Current Difference
aida01 fault 0xc228 : 0xc274 : 76
aida02 fault 0x5e98 : 0x5ee0 : 72
aida03 fault 0x92d3 : 0x931f : 76
aida04 fault 0x7a92 : 0x7ade : 76
aida05 fault 0xedc0 : 0xedcc : 12
White Rabbit error counter test result: Passed 0, Failed 5
Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR
DAQ (WS2): everything ok
Online monitoring (WS 5): done; |
238
|
Tue Feb 22 16:09:08 2022 |
David, Yury | Current status | Merger, Tape server (WS3) checks: DONE, writing ~1 1273kB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current
DAQ (WS2): temperature checked,
- clock status:
Clock status test result: Passed 5, Failed 0
Understand status as follows
Status bit 3 : firmware PLL that creates clocks from external clock not locked
Status bit 2 : always logic '1'
Status bit 1 : LMK3200(2) PLL and clock distribution chip not locked to external clock
Status bit 0 : LMK3200(1) PLL and clock distribution chip not locked to external clock
If all these bits are not set then the operation of the firmware is unreliable
- adc calibration:
Calibration test result: Passed 5, Failed 0
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module
- white rabbit check:
Base Current Difference
aida01 fault 0xc228 : 0xc272 : 74
aida02 fault 0x5e98 : 0x5edf : 71
aida03 fault 0x92d3 : 0x931d : 74
aida04 fault 0x7a92 : 0x7adc : 74
aida05 fault 0xedc0 : 0xedcc : 12
White Rabbit error counter test result: Passed 0, Failed 5
Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR
DAQ (WS2): everything ok
Online monitoring (WS 5): done |
237
|
Tue Feb 22 14:32:04 2022 |
David, Yury | Current status | Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine
Leakage current (WS4): 3.48 uA , stable current
DAQ (WS2): temperature checked,
- clock status:
Clock status test result: Passed 5, Failed 0
Understand status as follows
Status bit 3 : firmware PLL that creates clocks from external clock not locked
Status bit 2 : always logic '1'
Status bit 1 : LMK3200(2) PLL and clock distribution chip not locked to external clock
Status bit 0 : LMK3200(1) PLL and clock distribution chip not locked to external clock
If all these bits are not set then the operation of the firmware is unreliable
- adc calibration:
Calibration test result: Passed 5, Failed 0
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module
- white rabbit check:
Base Current Difference
aida01 fault 0xc228 : 0xc272 : 74
aida02 fault 0x5e98 : 0x5edf : 71
aida03 fault 0x92d3 : 0x931d : 74
aida04 fault 0x7a92 : 0x7adc : 74
aida05 fault 0xedc0 : 0xedcc : 12
White Rabbit error counter test result: Passed 0, Failed 5
Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR
DAQ (WS2): everything ok
Online monitoring (WS 5): done; first shots with something?
|
236
|
Tue Feb 22 12:23:23 2022 |
CB | Slow comparator thresholds lowered - test run | 13:20 Stopped run.
Slow comp thresh 0x64 -> 0x32 on all FEEs
Checkload x2
New run - R55
Restarted Data Spy code
Zerod histograms
Data rate acceptable.
Dead channels seem to come back online
Please check for deadtime/idle time once we collect enough stats. |
235
|
Tue Feb 22 12:01:46 2022 |
RSS, OF, ML, CB | Beam OFF, Target ON Run 54 | 01:00
Beam optimisation since 09:25.
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
Beam optimization will be done until 3 pm and will be then give for the experiment. |
234
|
Tue Feb 22 10:30:00 2022 |
RSS, OF, ML | Beam OFF, Target ON Run 54 | 11:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
Beam optimization will be done until 3 pm and will be then give for the experiment. |
233
|
Tue Feb 22 10:06:50 2022 |
RSS, OF, ML | PMT channel | YR00DA1ZB is the channel for PMT rate. |
232
|
Tue Feb 22 09:10:48 2022 |
OH | Analysis of R54_14 | Results of the fortran analyser programs for R54_14
No timewarps observed in the data
No dead time observed either.
Lots of idle time but expected with high thresholds and low noise |
231
|
Tue Feb 22 08:31:25 2022 |
RSS, OF, ML | Beam OFF, Target ON Run 54 | 09:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
FH and ML are optimising the beam. |
230
|
Tue Feb 22 07:27:28 2022 |
RSS, OF, ML | Beam ON, Target ON Run 54 | 08:30
Beam ON ~1.0E7 pps
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
FH and ML are optimising the beam. |
229
|
Tue Feb 22 06:30:09 2022 |
RSS, OF | Beam ON, Target ON Run 54 | 07:30
Beam ON ~8.0E6 pps
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
08:00 The beam is electron cooled by FH and the orbit of the beam is slighty changed. |
228
|
Tue Feb 22 05:47:18 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - 2 events at 10MeV! | 06:47
Beam ON ~2.0E6 pps, still fluctates between 1e6 and 6e6 (like a step function)
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10 (saturated)
Target E4 inlet pressure 8.0E-9 mbar
Dump S3 ~ 6.6E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
227
|
Tue Feb 22 05:12:38 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 06:00
Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10
Target E4 inlet pressure 8.2E-9 mbar
Dump S3 ~ 6.5E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
226
|
Tue Feb 22 04:09:28 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - first event at 10MeV ! | 05:00
Beam ON ~2E6 pps, still fluctates between 2e6 and 6e6 (like a step function)
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10
Target E4 inlet pressure 8.3E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
225
|
Tue Feb 22 03:05:06 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 04:00
Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10
Target E4 inlet pressure 8.4E-9 mbar
Dump S3 ~ 7.0E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
|