ID |
Date |
Author |
Subject |
236
|
Tue Feb 22 12:23:23 2022 |
CB | Slow comparator thresholds lowered - test run |
13:20 Stopped run.
Slow comp thresh 0x64 -> 0x32 on all FEEs
Checkload x2
New run - R55
Restarted Data Spy code
Zerod histograms
Data rate acceptable.
Dead channels seem to come back online
Please check for deadtime/idle time once we collect enough stats. |
235
|
Tue Feb 22 12:01:46 2022 |
RSS, OF, ML, CB | Beam OFF, Target ON Run 54 |
01:00
Beam optimisation since 09:25.
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
Beam optimization will be done until 3 pm and will be then give for the experiment. |
Attachment 1: 12-ex-2022-02-22_13-00-14.png
|
|
Attachment 2: 12-ey-2022-02-22_13-00-40.png
|
|
Attachment 3: 12-xy-2022-02-22_13-01-10.png
|
|
Attachment 4: 12-adc-2022-02-22_12-59-08.png
|
|
Attachment 5: 12-good-2022-02-22_12-58-48.png
|
|
Attachment 6: 12-temp-2022-02-22_12-57-28.png
|
|
Attachment 7: 12-leakage-2022-02-22_12-59-32.png
|
|
Attachment 8: 12-spectrum-2022-02-22_12-58-02.png
|
|
Attachment 9: 12-correlation-2022-02-22_12-58-25.png
|
|
234
|
Tue Feb 22 10:30:00 2022 |
RSS, OF, ML | Beam OFF, Target ON Run 54 |
11:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
Beam optimization will be done until 3 pm and will be then give for the experiment. |
Attachment 1: 11-ex-2022-02-22_11-30-44.png
|
|
Attachment 2: 11-ey-2022-02-22_11-30-12.png
|
|
Attachment 3: 11-xy-2022-02-22_11-31-13.png
|
|
Attachment 4: 11-adc-2022-02-22_11-27-37.png
|
|
Attachment 5: 11-good-2022-02-22_11-28-00.png
|
|
Attachment 6: 11-temp-2022-02-22_11-26-26.png
|
|
Attachment 7: 11-merger-2022-02-22_11-28-52.png
|
|
Attachment 8: 11-leakage-2022-02-22_11-29-09.png
|
|
Attachment 9: 11-spectrum-2022-02-22_11-27-12.png
|
|
Attachment 10: 11-correlation-2022-02-22_11-28-26.png
|
|
233
|
Tue Feb 22 10:06:50 2022 |
RSS, OF, ML | PMT channel |
YR00DA1ZB is the channel for PMT rate. |
232
|
Tue Feb 22 09:10:48 2022 |
OH | Analysis of R54_14 |
Results of the fortran analyser programs for R54_14
No timewarps observed in the data
No dead time observed either.
Lots of idle time but expected with high thresholds and low noise |
Attachment 1: R54_14_analyser.txt
|
*** TDR format 3.3.0 analyser - TD - May 2021
*** ERROR: READ I/O error: 5002
blocks: 32000
ADC data format: 41363625 ( 7503.5 Hz)
Other data format: 220556385 ( 40009.7 Hz)
Sample trace data format: 0 ( 0.0 Hz)
Undefined format: 0 ( 0.0 Hz)
Other data format type: PAUSE: 42 ( 0.0 Hz)
RESUME: 42 ( 0.0 Hz)
SYNC100: 52536 ( 9.5 Hz)
WR48-63: 52536 ( 9.5 Hz)
FEE64 disc: 12893198 ( 2338.9 Hz)
MBS info: 207558031 ( 37651.8 Hz)
Other info: 0 ( 0.0 Hz)
ADC data range bit set: 226 ( 0.0 Hz)
Timewarps: ADC: 0 ( 0.0 Hz)
PAUSE: 0 ( 0.0 Hz)
RESUME: 0 ( 0.0 Hz)
SYNC100: 0 ( 0.0 Hz)
WR48-63: 0 ( 0.0 Hz)
FEE64 disc: 0 ( 0.0 Hz)
MBS info: 0 ( 0.0 Hz)
Undefined: 0 ( 0.0 Hz)
Sample trace: 0 ( 0.0 Hz)
*** Timestamp elapsed time: 5512.571 s
FEE elapsed dead time(s) elapsed idle time(s)
0 0.000 5402.413
1 0.056 314.107
2 0.000 657.608
3 0.000 2532.514
4 0.320 0.000
5 0.000 0.000
6 0.000 0.000
7 0.000 0.000
8 0.000 0.000
9 0.000 0.000
10 0.000 0.000
11 0.000 0.000
12 0.000 0.000
13 0.000 0.000
14 0.000 0.000
15 0.000 0.000
16 0.000 0.000
17 0.000 0.000
18 0.000 0.000
19 0.000 0.000
20 0.000 0.000
21 0.000 0.000
22 0.000 0.000
23 0.000 0.000
24 0.000 0.000
25 0.000 0.000
26 0.000 0.000
27 0.000 0.000
28 0.000 0.000
29 0.000 0.000
30 0.000 0.000
31 0.000 0.000
32 0.000 0.000
*** Statistics
FEE ADC Data Other Data Sample Undefined Pause Resume SYNC100 WR48-63 Disc MBS Other HEC Data
0 162443 555 0 0 0 0 37 37 481 0 0 98
1 38970 87977556 0 0 8 8 15077 15077 328 87947058 0 67
2 18930381 14268602 0 0 0 0 8127 8127 12891950 1360398 0 0
3 31507 254 0 0 0 0 4 4 246 0 0 0
4 22200324 118309418 0 0 34 34 29291 29291 193 118250575 0 61
5 0 0 0 0 0 0 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0 0 0 0 0
8 0 0 0 0 0 0 0 0 0 0 0 0
9 0 0 0 0 0 0 0 0 0 0 0 0
10 0 0 0 0 0 0 0 0 0 0 0 0
11 0 0 0 0 0 0 0 0 0 0 0 0
12 0 0 0 0 0 0 0 0 0 0 0 0
13 0 0 0 0 0 0 0 0 0 0 0 0
14 0 0 0 0 0 0 0 0 0 0 0 0
15 0 0 0 0 0 0 0 0 0 0 0 0
16 0 0 0 0 0 0 0 0 0 0 0 0
17 0 0 0 0 0 0 0 0 0 0 0 0
18 0 0 0 0 0 0 0 0 0 0 0 0
19 0 0 0 0 0 0 0 0 0 0 0 0
20 0 0 0 0 0 0 0 0 0 0 0 0
21 0 0 0 0 0 0 0 0 0 0 0 0
22 0 0 0 0 0 0 0 0 0 0 0 0
23 0 0 0 0 0 0 0 0 0 0 0 0
24 0 0 0 0 0 0 0 0 0 0 0 0
25 0 0 0 0 0 0 0 0 0 0 0 0
26 0 0 0 0 0 0 0 0 0 0 0 0
27 0 0 0 0 0 0 0 0 0 0 0 0
28 0 0 0 0 0 0 0 0 0 0 0 0
29 0 0 0 0 0 0 0 0 0 0 0 0
30 0 0 0 0 0 0 0 0 0 0 0 0
31 0 0 0 0 0 0 0 0 0 0 0 0
32 0 0 0 0 0 0 0 0 0 0 0 0
*** Timewarps
FEE ADC Pause Resume SYNC100 WR48-63 Disc MBS Undefined Samples
0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0 0
8 0 0 0 0 0 0 0 0 0
9 0 0 0 0 0 0 0 0 0
10 0 0 0 0 0 0 0 0 0
11 0 0 0 0 0 0 0 0 0
12 0 0 0 0 0 0 0 0 0
13 0 0 0 0 0 0 0 0 0
14 0 0 0 0 0 0 0 0 0
15 0 0 0 0 0 0 0 0 0
16 0 0 0 0 0 0 0 0 0
17 0 0 0 0 0 0 0 0 0
18 0 0 0 0 0 0 0 0 0
19 0 0 0 0 0 0 0 0 0
20 0 0 0 0 0 0 0 0 0
21 0 0 0 0 0 0 0 0 0
22 0 0 0 0 0 0 0 0 0
23 0 0 0 0 0 0 0 0 0
24 0 0 0 0 0 0 0 0 0
25 0 0 0 0 0 0 0 0 0
26 0 0 0 0 0 0 0 0 0
27 0 0 0 0 0 0 0 0 0
28 0 0 0 0 0 0 0 0 0
29 0 0 0 0 0 0 0 0 0
30 0 0 0 0 0 0 0 0 0
31 0 0 0 0 0 0 0 0 0
32 0 0 0 0 0 0 0 0 0
*** Program elapsed time: 24.984s ( 1280.801 blocks/s, 80.050 Mb/s)
|
231
|
Tue Feb 22 08:31:25 2022 |
RSS, OF, ML | Beam OFF, Target ON Run 54 |
09:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
FH and ML are optimising the beam. |
Attachment 1: 9-ex-2022-02-22_09-29-46.png
|
|
Attachment 2: 9-ey-2022-02-22_09-30-12.png
|
|
Attachment 3: 9-xy-2022-02-22_09-31-36.png
|
|
Attachment 4: 9-adc-2022-02-22_09-28-36.png
|
|
Attachment 5: 9-temp-2022-02-22_09-26-47.png
|
|
Attachment 6: 9-merger-2022-02-22_09-28-56.png
|
|
Attachment 7: 9-leakage-2022-02-22_09-29-14.png
|
|
Attachment 8: 9-spectrum-2022-02-22_09-27-11.png
|
|
Attachment 9: 9-correlation-2022-02-22_09-27-37.png
|
|
Attachment 10: 9-good-events-2022-02-22_09-28-07.png
|
|
230
|
Tue Feb 22 07:27:28 2022 |
RSS, OF, ML | Beam ON, Target ON Run 54 |
08:30
Beam ON ~1.0E7 pps
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
FH and ML are optimising the beam. |
Attachment 1: 8-merger-2022-02-22_08-30-27.png
|
|
Attachment 2: 8-leakage-2022-02-22_08-30-44.png
|
|
Attachment 3: 8-adc-data-2022-02-22_08-28-58.png
|
|
Attachment 4: 8-spectrum-2022-02-22_08-28-34.png
|
|
Attachment 5: 8-xy-total-2022-02-22_08-32-04.png
|
|
Attachment 6: 8-ex-energy-2022-02-22_08-31-08.png
|
|
Attachment 7: 8-ey-energy-2022-02-22_08-31-32.png
|
|
Attachment 8: 8-correlation-2022-02-22_08-30-00.png
|
|
Attachment 9: 8-good-events-2022-02-22_08-29-33.png
|
|
Attachment 10: 8-temp-2022-02-22_08-28-09.png
|
|
229
|
Tue Feb 22 06:30:09 2022 |
RSS, OF | Beam ON, Target ON Run 54 |
07:30
Beam ON ~8.0E6 pps
Target ON and open to the ring
YR09xxx ETarget ~1.9e-10 (saturated)
Target E4 inlet pressure ~8.8E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted.
08:00 The beam is electron cooled by FH and the orbit of the beam is slighty changed. |
Attachment 1: temp-2022-02-22_07-36-13.png
|
|
Attachment 2: merger-2022-02-22_07-38-15.png
|
|
Attachment 3: leakage-2022-02-22_07-38-32.png
|
|
Attachment 4: adc-data-2022-02-22_07-37-51.png
|
|
Attachment 5: spectrum-2022-02-22_07-36-41.png
|
|
Attachment 6: ex-energy-2022-02-22_07-39-00.png
|
|
Attachment 7: ey-energy-2022-02-22_07-39-20.png
|
|
Attachment 8: xy-energy-2022-02-22_07-40-26.png
|
|
Attachment 9: correlation-2022-02-22_07-37-00.png
|
|
Attachment 10: good-events-2022-02-22_07-37-21.png
|
|
228
|
Tue Feb 22 05:47:18 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - 2 events at 10MeV! |
06:47
Beam ON ~2.0E6 pps, still fluctates between 1e6 and 6e6 (like a step function)
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10 (saturated)
Target E4 inlet pressure 8.0E-9 mbar
Dump S3 ~ 6.6E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
Attachment 1: Screenshot_from_2022-02-22_06-43-36.png
|
|
Attachment 2: Screenshot_from_2022-02-22_06-43-20.png
|
|
Attachment 3: Screenshot_from_2022-02-22_06-42-48.png
|
|
Attachment 4: Screenshot_from_2022-02-22_06-42-27.png
|
|
Attachment 5: Screenshot_from_2022-02-22_06-42-00.png
|
|
Attachment 6: Screenshot_from_2022-02-22_06-46-02.png
|
|
Attachment 7: Screenshot_from_2022-02-22_06-45-48.png
|
|
Attachment 8: Screenshot_from_2022-02-22_06-45-30.png
|
|
Attachment 9: Screenshot_from_2022-02-22_06-44-28.png
|
|
Attachment 10: Screenshot_from_2022-02-22_06-43-54.png
|
|
Attachment 11: Screenshot_from_2022-02-22_06-46-32.png
|
|
227
|
Tue Feb 22 05:12:38 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 |
06:00
Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10
Target E4 inlet pressure 8.2E-9 mbar
Dump S3 ~ 6.5E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
Attachment 1: Screenshot_from_2022-02-22_06-11-18.png
|
|
Attachment 2: Screenshot_from_2022-02-22_06-10-59.png
|
|
Attachment 3: Screenshot_from_2022-02-22_06-10-22.png
|
|
Attachment 4: Screenshot_from_2022-02-22_06-10-09.png
|
|
Attachment 5: Screenshot_from_2022-02-22_06-09-54.png
|
|
Attachment 6: Screenshot_from_2022-02-22_06-09-31.png
|
|
Attachment 7: Screenshot_from_2022-02-22_06-09-12.png
|
|
Attachment 8: Screenshot_from_2022-02-22_06-08-58.png
|
|
Attachment 9: Screenshot_from_2022-02-22_06-08-22.png
|
|
Attachment 10: Screenshot_from_2022-02-22_06-07-57.png
|
|
Attachment 11: Screenshot_from_2022-02-22_06-07-46.png
|
|
226
|
Tue Feb 22 04:09:28 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - first event at 10MeV ! |
05:00
Beam ON ~2E6 pps, still fluctates between 2e6 and 6e6 (like a step function)
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10
Target E4 inlet pressure 8.3E-9 mbar
Dump S3 ~ 6.8E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
Attachment 1: Screenshot_from_2022-02-22_05-07-47.png
|
|
Attachment 2: Screenshot_from_2022-02-22_05-07-33.png
|
|
Attachment 3: Screenshot_from_2022-02-22_05-07-19.png
|
|
Attachment 4: Screenshot_from_2022-02-22_05-06-58.png
|
|
Attachment 5: Screenshot_from_2022-02-22_05-06-30.png
|
|
Attachment 6: Screenshot_from_2022-02-22_05-06-19.png
|
|
Attachment 7: Screenshot_from_2022-02-22_05-06-06.png
|
|
Attachment 8: Screenshot_from_2022-02-22_05-05-40.png
|
|
Attachment 9: Screenshot_from_2022-02-22_05-05-30.png
|
|
Attachment 10: Screenshot_from_2022-02-22_05-05-11.png
|
|
Attachment 11: Screenshot_from_2022-02-22_05-04-25.png
|
|
225
|
Tue Feb 22 03:05:06 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 |
04:00
Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min
Target ON and open to the ring
YR09xxx ETarget ~1.8e-10
Target E4 inlet pressure 8.4E-9 mbar
Dump S3 ~ 7.0E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
Attachment 1: Screenshot_from_2022-02-22_04-02-25.png
|
|
Attachment 2: Screenshot_from_2022-02-22_04-03-08.png
|
|
Attachment 3: Screenshot_from_2022-02-22_04-03-44.png
|
|
Attachment 4: Screenshot_from_2022-02-22_04-03-24.png
|
|
Attachment 5: Screenshot_from_2022-02-22_04-04-28.png
|
|
Attachment 6: Screenshot_from_2022-02-22_04-04-10.png
|
|
Attachment 7: Screenshot_from_2022-02-22_04-03-55.png
|
|
Attachment 8: Screenshot_from_2022-02-22_04-10-57.png
|
|
Attachment 9: Screenshot_from_2022-02-22_04-10-37.png
|
|
224
|
Tue Feb 22 02:02:11 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 |
03:00
Beam ON ~7E6 pps
Target ON and open to the ring
Target E4 inlet pressure 8.5E-9 mbar
Dump S3 ~ 7.3E-10 mbar
Nozzle temperature 150 K
Run 54 started, monitoring code restarted. |
Attachment 1: TapeServer2022-02-22_02-49-29.png
|
|
Attachment 2: Leakage_current2022-02-22_02-50-39.png
|
|
Attachment 3: Temperature2022-02-22_02-52-02.png
|
|
Attachment 4: Screenshot_from_2022-02-22_02-54-34.png
|
|
Attachment 5: Good_events2022-02-22_02-55-14.png
|
|
Attachment 6: AIDA_CorrelationScreenshot_from_2022-02-22_02-56-04.png
|
|
Attachment 7: Spectrum_Browser2022-02-22_02-59-28.png
|
|
Attachment 8: LowEx2022-02-22_03-00-02.png
|
|
Attachment 9: LowEy2022-02-22_03-00-28.png
|
|
Attachment 10: LowEXYTotal2022-02-22_03-01-16.png
|
|
223
|
Tue Feb 22 00:32:35 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 |
01:30
Beam ON ~6E6 pps
Target ON and open to the ring
Target E4 inlet pressure 8.12E-9 mbar
Dump S3 ~ 7E-10 mbar
Nozzle temperature 150 K
1:40
Run 54 started, monitoring code restarted. |
Attachment 1: 2022-02-22_01-38-53-Ex-histogram.png
|
|
Attachment 2: 2022-02-22_01-38-17-XYtotal.png
|
|
222
|
Mon Feb 21 21:04:08 2022 |
SHB, JM, CB, OH (remotely) | Schottky RF view from the beam inside |
|
Attachment 1: pio-2022.02.21.21.54.46.895.PNG
|
|
221
|
Mon Feb 21 20:56:51 2022 |
SHB, JM, CB, OH (remotely) | DAQ connection for ion current |
signals from ICT and CRYRADIO are now connected to AIDA2 and AIDA5 respectively. ICT is set to factor 200 and CRYRADIO to 40 for now.
(AIDA3 --> electron cooler)
|
Attachment 1: cry.jpg
|
|
220
|
Mon Feb 21 18:03:58 2022 |
SHB, JM, CB, OH (remotely) | Info: signals on ion intensity for experiment |
Currently 4 possibilities to have a look at the beam, all of them are OK to check whether there is beam or not, but some of them are better for checking absolute values.
- Schottky RF signal
- Schottky zero span signal
- CRYRING Radio (signal from BPM) --> YR12DA1R
- ICT (integrated current transformer) --> YR12DT1C
absolute measurements:
- currently the beam is at 5.5 MeV/u calibrated on the flat top. The signal of ICT before is noisy but on the flat top it is well calibrated.
relative measurements:
- The signal from CRYRING radio, has a good amplifier and is frequency independent with a nice log signal. it can be used for relative measurements
- The zero span signal of Schottky can be used, but it is not reliable for measuring the number of ions since change in the control room may change the signal level.
- Schottky RF signal can be viewed by running Launcher-App using the button "VNC Tektronix RSA". The only problem is that only one instance can run, so if in the control room someone needs it, in the container it will disappear.
|
219
|
Mon Feb 21 17:26:19 2022 |
JM, CB, SHB, OH (remotely) | Beam ON run 53 |
21/2/22 16:00
Call from main control room, beam is ON, probably has been for several hours judging by rate on xy total plot.
Changes made to online monitoring code by OH, include setting to only 1 DSSD, correct offsets from the pulser walkthrough, offline analysis capabilities and X/Y position correction.
Monitoring code restarted in CARME_SORT/build_no_output
17:31 Run 50 ended, run 51 started now beam is definitely in the ring. Tried to insert span zero schottky into aida2 correlation scalar, however rate was far too high.
18:03 Removed span zero schottky signal, started new run 52.
With beam ON we noticed some missing channels in the xy total plot. Aida 1 and 2 stat totals on spectrum browser show missing channels. Asic check on both to no effect. Fees power cycled.
19:57 Started run 53. Currently waiting for beam
21:20 Beam ON
1*L plots checked for aida 1, several channels showed no data (noise)
Slow comparator LEC threshold lowered to 0x32 to aida 1, checked 1*L plots and channels are now showing lots of noise. So those channels appear to be quiet using 0x64 threshold. (attachment 3)
Threshold increased back to 0x64
22:33
System checks OK -white rabbit fails on all. ~30 seperation
Temperatures OK
Statistics within range - new scalars added for aida02 and aida05
Data being written ~300 kb/sec
Leakage current ~3.6 uA
00:39
System checks checks OK -white rabbit fails on all. ~42 seperation
Temperatures OK
Statistics within range with new scalars
Data being written 256 kb/sec
Leakage current ~3.615 uA
XY counts dominated by hot channels - most blue pixels are ~10 counts
|
Attachment 1: 2022-02-21_18-50-06-xyTotal.png
|
|
Attachment 2: 2022-02-21_19-05-27-aida1-4-rate.png
|
|
Attachment 3: 2022-02-21_22-17-54-aida1-1*L-lowerThreshold.png
|
|
Attachment 4: 2022-02-21_22-35-19-goodEvents.png
|
|
Attachment 5: 2022-02-21_22-35-53-ADC-dataitems.png
|
|
Attachment 6: 2022-02-21_22-36-28-aida-correlation.png
|
|
Attachment 7: 2022-02-21_22-58-18-Ex-histogram.png
|
|
Attachment 8: 2022-02-21_22-59-22-XY-total.png
|
|
Attachment 9: 2022-02-22_00-42-14-XY-total.png
|
|
218
|
Mon Feb 21 12:10:47 2022 |
RSS, JG | Alpha background run50 |
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK
Leakage current 3.59 uA.
potentiometer = 20.28 mm
11:36 OH noticed a channel in aida03 was running hot. Did an asic load check and rate returned to normal.
Online monitor also restarted.
15:06 Investigating the high rate in aida03 ASIC01 channel 11.
Looking at the waveforms it seems channel 11 is consistently different.
Attachment 1 shows a typical waveform for it
|
Attachment 1: 220221_1506_aida03_1*W.png
|
|
217
|
Mon Feb 21 10:59:48 2022 |
RSS, JG | Alpha background run50 |
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK
Leakage current 3.59 uA.
potentiometer = 20.28 mm
11:36 OH noticed a channel in aida03 was running hot. Did an asic load check and rate returned to normal.
Online monitor also restarted.
|