  186   Fri Feb 4 09:53:48 2022 JM, TD, OH (remotely)Alpha spectra overnightDAQ was left running last night from 19:30.
Detector bias 80V with a leakage current
~3.4 uA. Pulser OFF.
 8x 
  185   Thu Feb 3 22:05:33 2022 JM, TD, OH(remotely)Bias update and grounding9:30 Bias remained stable overnight - 60V
2.95 uA.

10:00 No grounding attached initailly.
  
  184   Wed Feb 2 21:53:32 2022 JM, TDDetector BiasFEE mounts for 5,6,7,8 disassembled to
access adaptor boards. No sign of debris
which could cause short on adaptor boards. 
 20220202_110757.jpg20220202_193636.jpg20220202_193651.jpgmotion.png 
  183   Tue Feb 1 14:43:20 2022 JM, TDDetector Bias, FEEsDetector is not biasing as it has in previous
tests. Last bias 15/1/22 see previous elogs,
max leakage current ~10 uA at 150V
 22-02-01_15-03-56_aida03pulserADCspectra.png2022-02-01_15-14-07_aida03_pulser_DAQserver.png2022-02-01_15-22-23aida03_waveforms_pulser.png2022-02-01_15-28-45aida03_waveforms_pulser2.png2022-02-01_15-54-57rates_aidaALL.png 
  182   Mon Jan 31 08:58:38 2022 OH, TD, JMcentos server configurationSteps taken:
- MIDAS_Releases, Embedded and Exports files
brought across from the previously working
 8x 
  181   Sat Jan 29 11:04:07 2022 JM, OHGrounding and PulserGrounding

Ground cables have been daisy chained
together from FEE to FEE. Ground cables are
 Silkscreen_Top.pdf 
  180   Thu Jan 27 21:33:40 2022 JM, OHAIDA config files, remote access, motor testPower, Ethernet and HDMI cables connected
to FEEs. To prevent cables coming out of
connectors, power and HDMI cables are zip
 20220127_101513.jpg 
  179   Thu Jan 27 15:24:02 2022 OH, JMAccess to Motors PI1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password)
  
  177   Thu Jan 27 15:19:18 2022 OH, JMEnabling internet access on the carme-gsi serverTo use both anydesk and firefox on the carme
server require an internet connection.
  
  176   Thu Jan 27 14:04:34 2022 OH, JMRemote access to CARME server1. ssh into lxpool network: ssh <user>@lxpool.gsi.de
2. ssh into atppc022.gsi.de: ssh carme@atppc022.gsi.de
(This is an rpi access server. Don't run
  
  175   Wed Jan 26 19:16:18 2022 JM, OHWater cooling, FEE MAC addressWater cooling has been connected to the
FEE's. Flow meter installed to outlet
manifold by way of two right angled pieces.
 20220126_162435.jpg20220126_162448.jpg20220126-142809.jpg 
  174   Sat Jan 15 15:38:25 2022 JM, OH, TDFEE installation, cable managementAll 8 FEEs have been installed in their
holders.

The damaged feedthrough does not
 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg 
  173   Sat Jan 15 11:28:10 2022 JMInventory 


Vaccum
DN250CF 1x gaskets
    
DN200CF 5x gaskets  
DN160CF 1x gaskets,
 20220115_162649.jpg20220115_162712.jpg 
  172   Fri Jan 14 10:00:18 2022 TD, OH, JMFriday 14 January
11.00 Per https://elog.ph.ed.ac.uk/CARME/170
and https://elog.ph.ed.ac.uk/CARME/171 issues
  
  171   Thu Jan 13 10:33:24 2022 JM, OH, TDAdaptor Board misallignmentThe ERNI connector is not central on the
adaptor boards causing misallignment with
the FEE. 
 20220112_160951.jpg20220113_145105.jpg20220113_145147.jpg 
  170   Wed Jan 12 20:07:20 2022 JM, OH, TDFEE holder installation4 FEE holders installed on CARME. Mounting
procedure devised due to limited working
space to install.
 10x 
  168   Tue Jan 11 12:45:15 2022 TD, JM, OHCoolant manifold installation + detector pin tests2x cooling water manifolds with 2x 8 ports
have been installed - see attachments 1 &
2
 20220111_113628.jpg20220111_113613.jpg20220111_111428.jpg 
  167   Mon Jan 10 20:52:53 2022 JM, TD, OHBaking tent removed, VI testsBaking tent, frame and trays fully
removed from CARME chamber. Removal of baking
frame required removing air lines from upper
 20220110_175547.jpg20220110_175811.jpgvi-curve.png 
  166   Tue Dec 7 09:39:59 2021 CB (remotely)Gate valves closedDry run complete.

YR09 section valves closed. Section
isolated. Manual valve between electron target
  
  165   Tue Nov 30 10:49:43 2021 CB (remotely) GVGate valve openedGSI vacuum division IE514 gauge connected.

Gleb reports gate downstream opened.
Vacuum goes up and recovers as expected.
 vacplot24.png 