126
|
Sun Oct 17 11:48:48 2021 |
TD RSS | Sunday 17 October | Looking downstream the RHS motor assembly
has loose green/yellow (gnd?) see attachment
1
|
14x |
|
125
|
Sat Oct 16 17:25:47 2021 |
RSS TD | Broken detectors | One of the detectors was damaged while
mounting (see pictures 1-3).
Second detector was found already |
    |
|
124
|
Fri Oct 15 19:37:12 2021 |
RSS TD + DR | Friday 15 October | Ring seal is out. See picture 1.
Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some |
8x |
|
123
|
Thu Oct 14 15:54:47 2021 |
TD RSS | Thursday 14 October | Attachment 1 - what is function of the 4x
c/s holes indicated?
|
 |
|
122
|
Wed Oct 13 15:28:22 2021 |
RSS TD + OG | Split funnels | Split funnels installed on 4 (of 8) 2x78
way D connector feed-throughs. |
7x |
|
121
|
Wed Oct 13 15:16:12 2021 |
TD | Orientation of 2x 78 way D connector feedthroughs |
Looking downstream
|
   |
|
120
|
Wed Oct 13 12:06:09 2021 |
RSS TD | Flanges cleaned | RSS & TD had some success cleaning the COF600
flange surfaces of the staining and residues
observed when the downstream COF600 section |
12x |
|
119
|
Wed Oct 13 11:59:23 2021 |
TD | [How to] Open COF600 copper wire seals |
Use the M10 jacking points provided top/bottom
and
|
 |
|
118
|
Tue Oct 12 13:54:21 2021 |
RSS TD + OD DR | CARME opened | With the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate |
20x |
|
117
|
Tue Oct 12 09:22:37 2021 |
RSS TD + OG DR | Motors problem solved | Neg and ion cables were taken off and were
put in the box.
Top support was taken off. |
 |
|
116
|
Mon Oct 11 11:24:16 2021 |
RSS TD ML | Valve support and cable labeling | Split funnels were given to Oemer for cleaning.
Have received them back after lunch.
Valve support is installed again |
  |
|
115
|
Sat Oct 9 09:47:33 2021 |
CB | To do list for next week | 0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split. |
|
|
114
|
Sat Oct 9 09:44:36 2021 |
CB RSS | Heaters removed + motors tests | Removed thermocouples, heaters, RE72 modules
and leftover baking tent. Support octagon
removed except topmost part which requires |
|
|
113
|
Fri Oct 8 17:56:35 2021 |
CB RSS | Motors test | Attempted first motor test in XHV. Wired
and connected limit switches and string potentiometer.
Set up raspberry pi to control |
 |
|
112
|
Thu Oct 7 08:40:09 2021 |
CB RSS | CARME in XHV | CARME reached 9E-12 this morning
Ion pumps on
|
|
|
111
|
Wed Oct 6 15:36:14 2021 |
CB RSS | Neg activation tests -3 | Attempted to activate 2xUHV1400 connected
to bottom C4, channel #2 using P 200 W, t
rise 30 min, t hold 90 min.
|
|
|
110
|
Wed Oct 6 09:47:30 2021 |
CB RSS | Neg activation tests -2 | Attempted activating 2xUHV1400 connected to
top C4, channel #3 with P 300 W (450 C?),
t rise 30 min, t hold 90
|
|
|
109
|
Wed Oct 6 09:39:59 2021 |
PB CB | Original dirty assembly of CARME internals | PB found pictures of the original dirty assembly,
before screws and components were shipped
to DL.
|
7x |
|
108
|
Tue Oct 5 17:30:01 2021 |
CB RSS | NEG activation tests | Found D2000 #1 activated and at 250C (25W)
to prevent getting dirty when other NEGs |
  |
|
107
|
Tue Oct 5 11:44:11 2021 |
CB, TD | SAES manuals & cable drawings | NEG power
SIP power
UHV1400 operating instructions |
8x |