Entry  Fri Oct 15 19:37:12 2021, RSS TD + DR, Friday 15 October 8x
Ring seal is out. See picture 1.

Bellow (towards CARME) was installed in the gas jet chamber. Attached are some pictures.
Entry  Thu Oct 14 15:54:47 2021, TD RSS, Thursday 14 October IMG_5056.JPG.jpgIMG_5053.JPG
Attachment 1 - what is function of the 4x c/s holes indicated?

Entry  Wed Oct 13 15:28:22 2021, RSS TD + OG, Split funnels 7x
Split funnels installed on 4 (of 8) 2x78 way D connector feed-throughs.
Entry  Wed Oct 13 15:16:12 2021, TD, Orientation of 2x 78 way D connector feedthroughs 20211013_152518.jpg20211013_152529.jpg20211013_152549.jpg20211013_152606.jpg

Looking downstream
Entry  Wed Oct 13 12:06:09 2021, RSS TD, Flanges cleaned 12x
RSS & TD had some success cleaning the COF600 flange surfaces of the staining and residues observed when the downstream COF600 section was opened yesterday
 
https://elog.ph.ed.ac.uk/CARME/118
Entry  Wed Oct 13 11:59:23 2021, TD, [How to] Open COF600 copper wire seals 20211013_103806.jpg20211013_103800.jpg

Use the M10 jacking points provided top/bottom and 
left/right on the upstream and downstream sides of the 
Entry  Tue Oct 12 13:54:21 2021, RSS TD + OD DR, CARME opened 20x
With the assistance of Oemer and Davide all of the M22 bolts removed from the downstream section of the CARME chamber. To separate the downstream section
from the 
upstream sections it was necessary to use a lever between M10 bolts screwed into the lift points of adjacent sections of the CARME. The upstream sections
Entry  Tue Oct 12 09:22:37 2021, RSS TD + OG DR, Motors problem solved IMG_4971.JPGIMG_4970.JPG
Neg and ion cables were taken off and were put in the box.

Top support was taken off.

Motors are rotating again. Have to be careful with the position of the limit switches.
Entry  Mon Oct 11 11:24:16 2021, RSS TD ML, Valve support and cable labeling IMG_4962.JPGIMG_4969.JPG.svgIMG_4968.JPG.svg
Split funnels were given to Oemer for cleaning. Have received them back after lunch.

Valve support is installed again (see picture 1).

Ion pump was connected but not activated. Michael will help in doing so. No vacuum support to help will RGA. Will proceed without it.
Entry  Sat Oct 9 09:47:33 2021, CB, To do list for next week Capture.PNG
0. Give split-funnels to OG or Grossmontage to clean. Mount back foot support for gate valves. Critical when we split.

1. Wait for vacuum division to come to install: IE514 cables to current CM52 module, ion pump cables + controls + turn on, RGA head + program
+ turn on
Entry  Sat Oct 9 09:44:36 2021, CB RSS, Heaters removed + motors tests 
Removed thermocouples, heaters, RE72 modules and leftover baking tent. Support octagon removed except topmost part which requires disconnecting pneumatic
hoses going to top gate valve. To be done on Monday with ML assistance.

Attempted to move servo motors once more - did not work. The motors appear stuck but it is not clear how or where. Removed screws on flanged
Entry  Fri Oct 8 17:56:35 2021, CB RSS, Motors test 20211008_184731.jpg20211008_184731.jpg
Attempted first motor test in XHV. Wired and connected limit switches and string potentiometer.

Set up raspberry pi to control motors (.124). Set up pi for remote headless access.

Moved jumper on Teknic hub from 1 to 2 motors configuration.
Entry  Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV 
CARME reached 9E-12 this morning

Ion pumps on
Entry  Wed Oct 6 15:36:14 2021, CB RSS, Neg activation tests -3 
Attempted to activate 2xUHV1400 connected to bottom C4, channel #2 using P 200 W, t rise 30 min, t hold 90 min.
Temperature of Kapton bundle increased drastically to 160+ C. Had to stop. Conclusion is that these are likely
the two UHV1400 on the bottom of CARME, immediately in front of the Kapton bundle.
Entry  Wed Oct 6 09:47:30 2021, CB RSS, Neg activation tests -2 
Attempted activating 2xUHV1400 connected to top C4, channel #3 with P 300 W (450 C?), t rise 30 min, t hold 90
min as yesterday
Entry  Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
PB found pictures of the original dirty assembly, before screws and components were shipped to DL.
See attached.
Entry  Tue Oct 5 17:30:01 2021, CB RSS, NEG activation tests 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg
Found D2000 #1 activated and at 250C (25W) 
to prevent getting dirty when other NEGs 
are activated. See previous entries.
Entry  Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
NEG power
SIP power
UHV1400 operating instructions
Entry  Mon Oct 4 20:30:46 2021, RSS JM CB (remotely), CARME baking status -21 Screenshot_from_2021-10-04_21-28-28.pngScreenshot_from_2021-10-04_21-29-37.png

Current temperature ~95 C (on manual mode)
See plot and screen attached.

Current pressure 2.86E-10
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Mon Oct 4 09:19:11 2021, JM RSS, Activation of NEG elements IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG
9:30

Ion pumps de-gassed by switching on and off multiple times. Large pressure increase the first time pumps were flashed, pressure recovers quickly
once pumps off. Subsequent flashing of ion pumps showed a significantly smaller pressure increase, unitl little increase was seen. 