AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 2 of 37  ELOG logo
  ID Datedown Author Subject Text Attachments
  708   Sat May 31 10:46:42 2025 TDRun 38 - remote monitoring
11.40 DAQ continues
      File G22-205/R38
 21x 
  707   Sat May 31 09:58:21 2025 JMRun 3810:56

Run 38 started.

D+ beam deuterium target. D+ beam
 10x 
  706   Fri May 30 21:49:08 2025 JM, NP, CBRun 3722:49

Run 37 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png 
  705   Fri May 30 20:47:47 2025 JM, CB, NPRun 3621:47

Run 36 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png 
  704   Fri May 30 20:06:48 2025 JM, CB, NPRun3521:00

Run 35 started.

D+ beam deuterium target. D+ beam
 8x 
  703   Fri May 30 07:27:41 2025 CB LB JM NP EMWaiting for deuterium08:27

No run going.

Temperatures OK - attach
 8x 
  702   Thu May 29 18:04:47 2025 LB, CB, PMH, JMRun 32,33,34Oven temperature increased, current up
to 3.5E7 pps.

Found beam-target overlap setting
 7x 
  701   Thu May 29 14:39:52 2025 CB LB PMHRun 3115:40

Waiting for Serge to come in to
change beam energy.
 9x 
  700   Wed May 28 16:40:48 2025 EH, SN, LB, OF, EBM, CBRun 28/29/30 - 1.88 MeV/AWe start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically.
 37x 
  699   Wed May 28 10:54:14 2025 LBRun 27Run 27 running

28/05/2025

(ignore 26 - in-between run)
 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png 
  698   Tue May 27 22:20:11 2025 CB, LB,PWRun 25 - 1.99/2.02 MeV/A23:20

JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot
 27x 
  697   Tue May 27 15:18:46 2025 JG, CN, JMrun 24Run 24 running

27/05/2025

We start a new run with real data
 7x 
  696   Tue May 27 12:49:48 2025 MLIon beam / electron beam settings so far.Screenshots and ParamModi settings export
attached.
 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt 
  695   Tue May 27 08:38:29 2025 TD[How To] Recover DAQ when one FEE64 stops sending data - short(er) version 1) Select 'No Storage' [workspace 4, display
1, browser tab 'TapeServer']
    If already in 'No Storage' mode please
  
  694   Tue May 27 05:24:05 2025 LB,SN, L. Cs. P. J. W.Run 22, 23 - 1.95 MeV/A27/05/2025 ca. 6:00

We start a new run: beam is ok,
target density ok, detectors are moving in-out
 8x 
  693   Tue May 27 05:03:41 2025 JMDAQ restart06:00

FEE modules power cycled.

No issues on power cycle restart.
 7x 
  692   Mon May 26 18:37:17 2025 LC, AG, LB, SNRun 21Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data
 12x 
  691   Mon May 26 08:56:56 2025 EM,LBRun20Run 20 running

We start a new run since the laser
guys will do some measurements.
 8x 
  690   Sat May 24 18:27:55 2025 EM, LCBackground runs continued R17-R19Summary: Target not running. Background
runs written to disk, some with beam some
without.
 36x 
  689   Sat May 24 08:28:14 2025 TD, EMBackground runs R13-R16Summary: Target not running. Some background
files written to disk, some with beam some
without. 
 29x 
ELOG V3.1.4-unknown