AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 2 of 38  ELOG logo
Entry  Thu Jun 12 15:33:17 2025, CB, JM, EM, JG, TD, AB, CF, AR, Run 74 27x
16:34

Like Run 73, but particle detector in YR10 now active, and recorded in MBS.

Clear effect of target on beam lifetime. Target off -> nearly no counts.
Entry  Thu Jun 12 14:22:27 2025, JM, CB, TD, CF, JG, EM, Run 73 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png
15:00

Cave closed, waiting for beam to come back.

Reset all ASIC settings to those in elog 737
Entry  Thu Jun 12 14:08:42 2025, JM, CB, Run 72 - pulser walkthrough Screenshot_from_2025-06-12_15-33-03.png
Pulser walkthrough conducted while the cave was open.

Pulser amplitudes 90000, 80000, 70000, 60000, 50000, 40000, 30000, 20000, 10000

DSSD4 was set to MEC and bias off as the detector had previously tripped.
Entry  Thu Jun 12 06:20:50 2025, JM, Run 68,69 - background Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png
07:20

Started a background run while the cave is open.

All ASIC settings remain unchanged, we just have no beam.
Entry  Wed Jun 11 10:13:42 2025, EW, CB, PJW, AR, JM, Run 67 14x
As run 66, optimisation of beam completed

DSSD4 now working and thresholds to 0x30 (480keV), switched to LEC

Tape service at 1.7MB/s
Entry  Wed Jun 11 09:16:55 2025, CB, ASIC Control Settings 17x
11 June 10:18

2025Apr08-13.45.30 settings

DSSD4 not working as of the screenshots (MEC + High Threshold)
Entry  Wed Jun 11 08:37:48 2025, CB, PJW, Run 66 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png
09:38

As Run 65, no changes, CRYRING operators attempting to improve beam intensity.

We should be able to keep running while they do, but there is a chance of some missed injections or other oddities.
Entry  Tue Jun 10 22:38:59 2025, JM, CB, PJW, Run 65 7x
23:40

Offline anlaysis shows two clear peaks for DSSD1 and 2 at very low energies close to the threshold. One must be elastics and the other a noise
peak.
Entry  Tue Jun 10 16:46:39 2025, JM, CB, EW, AY, PC, 150 keV - Run64 42x
Run 64 started.

150 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam.

We do not see Rutherford on the detector - perhaps this is a calibration issue - perhaps too much noise at threshold.
Entry  Tue Jun 10 13:29:23 2025, EW, CB, JM, Thresholds changed  Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png
Experimented with slow comparator thresholds as we go down to lower beam energies

Checked deadlayer loses with SRIM, expected ruthford energies are as follows:

150keV/u -> 230keV
Entry  Tue Jun 10 09:57:50 2025, CB, JM, PJW, YuL, JG, Run 62 
10:58

As Run 61, no target for background.

200 keV/A
Entry  Tue Jun 10 09:44:33 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)

This means, no detector and target timing is available for this period.

The reason is that the rfio server was running on atppc025, which crashed at that time.
Entry  Tue Jun 10 09:44:30 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)
The reason is that the rfio server was running on atppc025 which crashed at that time.

We
resumed running MBS now at 10.06. ca. 10:35. (run_0036.lmd).
Entry  Tue Jun 10 09:44:20 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)
The reason is that the rfio server was running on atppc025 which crashed at that time.

We
resumed running MBS now at 10.06. ca. 10:35. (run_0036.lmd).
Entry  Sun Jun 8 11:55:00 2025, EM, PC, JM, CB, EW, AY, CB, PJW, YuL, Run 58,59,60, 61 50x
12:52 

Started Run 58 - Beam energy 200 keV/u.

Slow comparator threshold set to 0xc (130 keV) for all channels. Fast discriminators turned OFF for all channels by setting enable mask in discrinator
Entry  Sun Jun 8 10:05:30 2025, EM, PC, JM, Run57 
11:06

Run during beam change. We will go down to 200 keV/u

All the checks are ok.
Entry  Sun Jun 8 09:07:22 2025, EM, PC, JM, Run56 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png
NOTE: RunR55 is missing

Run56: Background run with 250 keV/u. Target off using the usual procedure.

All  checks ok!
Entry  Sat Jun 7 10:23:26 2025, JM, CB, carme-gsi rebooted  
10:00

The computer screen controlling the DAQ on carme-gsi appeared to have crashed.

Unable to move throught the different windows etc.
Entry  Sat Jun 7 10:06:27 2025, JM, EM, CB, DB, AY, PC, CB, Run 54 50x
11:10

We have started a new run at the same energy as R53 (250 keV/u) due to an issue with the DAQ pc

Server and DAQ restarted
Entry  Fri Jun 6 17:27:03 2025, AY, ST, JM, EM, DB, Run 53 11x
Run 53 started at 18:25 (started already earlier but since then data is taken). Everything is running again. We started at 3E12 at/cm2.
Side comment: Gleb told us 1h ago that he will switch to coasted mode and call us back as soon as he is done. So far he didn't call back and
he is not in the office... So we decided to start data taking already. But: the software says that coasting mode is already on, but the graph looks like
ELOG V3.1.4-unknown