Sun Jun 16 13:29:05 2024, RSS CB, Run 78
|
Target clogged? |
Sun Jun 16 06:02:31 2024, RSS, Run 77 20x
|
Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
Sat Jun 15 21:14:56 2024, JM, JS, LC, Run 76
|
22:15
New run 76 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.1 V. |
Sat Jun 15 13:30:18 2024, JM, JS, Run 75  
|
14:30
New run 75 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.2 V. |
Sat Jun 15 06:10:21 2024, EM, PMH, Run 74 6x
|
7:00
Cooler voltage setpoint 247.4 V.
|
Sat Jun 15 00:46:45 2024, TD, CRYRING hall temperature transient
|
CRYRING hall temperature transient - evening of Friday 14 June
Cooling of recirculating water failed on a number of circuits within the GSI experimental hall including S4 and CRYRING
|
Fri Jun 14 22:18:18 2024, RSS, CB, US, Run 73 20x
|
Beam is back.New run started.
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 19:59:14 2024, US, LC, CB, New run with name of 72 is started due to target issue 
|
21:00
Target is lost. Background run is being collected.
New run 72 - beam on target with definite target overlap [coasting] |
Fri Jun 14 14:52:02 2024, JM, Beam-Target Overlap Scan 
|
The orbit of the beam in the ring was re-configured so that the beam position is more central.
With the target density at ~6e11 at/cm2 this allowed a target overlap scan using the beam lifetime to be performed.
Beam put into bunched mode to allow the number of particles to be observed on Grafana. |
Fri Jun 14 14:48:02 2024, CB NP ML, [How To] Change target pressure. EMERGENCY ONLY! 
|
ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo is below 820 Hz, pressure in E1 is above 2.5E-1 mbar and experts (Nikos, Andreas) cannot be reached.
Go to the red cabinet under the stairs. |
Fri Jun 14 14:46:54 2024, LC, JM, CB, TD, US, Run 71 - beam on target   
|
15:45
New run 71 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 13:45:21 2024, JM, JS, CB, TD, EH, Run 70 - beam on target 7x
|
14:45
New run 70 - beam on target with definite target overlap
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 10:21:24 2024, JS, TD, Run 68 9x
|
Frank has been tuning the beam since 08:00
detectors moved fully out
11:20 |
Thu Jun 13 23:01:07 2024, RSS, JS, EH, Run 67 - Night shift 20x
|
Run 67
00:01
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats OK - |
Thu Jun 13 21:07:30 2024, LCS, US, Run 67- beam on target 7x
|
22:05
The energy is changed to 247.4 V.
Read back value is 246.849 V. |
Thu Jun 13 14:46:17 2024, TD, R66 beam overlap test
|
15.45 Start data file G22-201/R66
Beam/target overlap test |
Thu Jun 13 09:48:25 2024, TD, LCS, Run 65 - beam on target 14x
|
10:47
The energy is changed to 247.4 V.
Read back value is 246.849 V. |
Thu Jun 13 06:21:53 2024, TD, LCS, Run 64 - contd 13x
|
07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment 1
|
Thu Jun 13 00:50:33 2024, JM, JS, Run 64 - beam on target
|
01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
Wed Jun 12 07:16:47 2024, RSS, YL, JM, TD, CB, Status 6x
|
07:56 Gleb has taken the beam to try settings for the 5+ charge state. As soon as the target is ready, the 1+ charge state will be given back.
Detectors have been moved out for safety
08:10
Run 63
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
|