|
ID |
Date |
Author |
Subject |
Text |
|
|
639
|
Sun Jun 16 06:02:31 2024 |
RSS | Run 77 | Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
20x |
|
638
|
Sat Jun 15 21:14:56 2024 |
JM, JS, LC | Run 76 | 22:15
New run 76 - beam on target with
definite target overlap [coasting] |
|
|
637
|
Sat Jun 15 13:30:18 2024 |
JM, JS | Run 75 | 14:30
New run 75 - beam on target with
definite target overlap [coasting] |
|
|
636
|
Sat Jun 15 06:10:21 2024 |
EM, PMH | Run 74 | 7:00
Cooler voltage setpoint 247.4 V.
|
6x |
|
635
|
Sat Jun 15 00:46:45 2024 |
TD | CRYRING hall temperature transient | CRYRING hall temperature transient - evening
of Friday 14 June
|
|
|
634
|
Fri Jun 14 22:18:18 2024 |
RSS, CB, US | Run 73 | Beam is back.New run started.
Cooler voltage setpoint 247.3 V. |
20x |
|
633
|
Fri Jun 14 19:59:14 2024 |
US, LC, CB | New run with name of 72 is started due to target issue | 21:00
Target is lost. Background run
is being collected. |
|
|
632
|
Fri Jun 14 14:52:02 2024 |
JM | Beam-Target Overlap Scan | The orbit of the beam in the ring was re-configured
so that the beam position is more central.
With the target density at ~6e11 |
|
|
631
|
Fri Jun 14 14:48:02 2024 |
CB NP ML | [How To] Change target pressure. EMERGENCY ONLY! | ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo
is below 820 Hz, pressure in E1 is above
2.5E-1 mbar and experts (Nikos, Andreas) |
|
|
630
|
Fri Jun 14 14:46:54 2024 |
LC, JM, CB, TD, US | Run 71 - beam on target | 15:45
New run 71 - beam on target with
definite target overlap [coasting] |
|
|
629
|
Fri Jun 14 13:45:21 2024 |
JM, JS, CB, TD, EH | Run 70 - beam on target | 14:45
New run 70 - beam on target with
definite target overlap |
7x |
|
628
|
Fri Jun 14 10:21:24 2024 |
JS, TD | Run 68 | Frank has been tuning the beam since 08:00
detectors moved fully out
11:20 |
9x |
|
627
|
Thu Jun 13 23:01:07 2024 |
RSS, JS, EH | Run 67 - Night shift | Run 67
00:01
DSSSD bias & leakage |
20x |
|
626
|
Thu Jun 13 21:07:30 2024 |
LCS, US | Run 67- beam on target | 22:05
The energy is changed to 247.4
V. |
7x |
|
625
|
Thu Jun 13 14:46:17 2024 |
TD | R66 beam overlap test |
15.45 Start data file G22-201/R66
Beam/target overlap test |
|
|
624
|
Thu Jun 13 09:48:25 2024 |
TD, LCS | Run 65 - beam on target | 10:47
The energy is changed to 247.4
V. |
14x |
|
623
|
Thu Jun 13 06:21:53 2024 |
TD, LCS | Run 64 - contd | 07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment |
13x |
|
622
|
Thu Jun 13 00:50:33 2024 |
JM, JS | Run 64 - beam on target | 01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
|
|
621
|
Wed Jun 12 07:16:47 2024 |
RSS, YL, JM, TD, CB | Status | 07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given |
6x |
|
620
|
Tue Jun 11 21:16:50 2024 |
TD | Run 63 continued | Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment |
17x |
|