  336   Mon Feb 28 23:54:02 2022 JM, EMCurrent Status, Temperature cycle00:51

Temperature setpoint = 116 K

Detector position IN potentionmeter
 2022-03-01_00-57-44-Exrate.png2022-03-01_00-58-41-ExTotal.png2022-03-01_00-58-14-EyTotal.png 
  278   Fri Feb 25 06:28:12 2022 George, EstherCurrent Status07:30
Some signals on the beam monitor,
seems they are optimising it.
 2022-02-25_07-33-44exRate.png2022-02-25_07-35-11xyTotal.png 
  315   Sun Feb 27 22:03:51 2022 JM, OFCurrent Status23:00

Target Temperature setpoint 95
K
 9x 
  201   Wed Feb 16 21:27:31 2022 JMCryring signals, Pulser tests, Waveforms On 15/2/22 it was noted that the leakage
current increases when the motors are moved
IN. This is contary to tests conducted on
 11x 
  333   Mon Feb 28 14:42:48 2022 CB, TDCryostat set to 115K
Cryostat set to 115K
  
  29   Thu Oct 22 22:15:00 2020 CB (remotely)Cooling down after first NEG activationThu 22 October

22:15 Temperatures stables, slowly decreasing.
 7x 
  30   Mon Oct 26 10:35:05 2020 JM, CB(remotely)Cooling10:10 Pressure on the chamber = 3.1e-8mbar.
RE-72 temperatures are ~120-125C with set
limits at 80C. D2000 temperatures are
 Screenshot_from_2020-10-26_14-10-08.png20201027_0803_temps.png27102020_pump_down.png27102020_pump_down.png 
  168   Tue Jan 11 12:45:15 2022 TD, JM, OHCoolant manifold installation + detector pin tests2x cooling water manifolds with 2x 8 ports
have been installed - see attachments 1 &
2
 20220111_113628.jpg20220111_113613.jpg20220111_111428.jpg 
  159   Fri Nov 19 12:03:51 2021 CB RSSConditionings NEGsIncreased conditioning temperature in D2000
#3 and 4 (behind detectors) to 150C from
130/140C. No appreciable change in temperature.
 CARMEtemps.pngvacplot.png 
  157   Thu Nov 18 12:29:50 2021 CB RSSConditioning D2000 NEGsD2000 thermocouples report temperatures
around 100C (D2000 #1,2) and 120C (3,4).
1,2 are in the intermediate chamber, 3,4
 vacplot.pngCARMEtemps.png 
  420   Mon Jul 17 08:45:11 2023 TDClosing CARME again
Grosmantage are scheduled to arrive 10.00
to inspect COF600 seals and their fit to
 20230717_093106.jpg 
  406   Wed Jun 21 18:47:36 2023 JM, TDClosing CARMEInternal CARME installations complete. 


New strain reliefs (flange
side) installed on each cable harness.
2x
 20230621_104911.jpg20230621_104918.jpg20230621_110010.jpg21-06-23-VI.png 
  77   Thu Sep 23 14:19:27 2021 CB (remotely)Checking baking remotely - instructions1. Connect to pi on CRYRING local network

ssh pi@192.168.207.127
 Temp.png 
  274   Fri Feb 25 01:12:49 2022 Rui-Jiu Chen, Alex Check Still  no beam in CRING.

Motor fully out position.

SW3
 13x 
  273   Fri Feb 25 00:00:40 2022 Rui-Jiu Chen, AlexCheckThere are some problems with ion source. 
No beam in CRYING.

Motor fully out position.
 14x 
  649   Mon Jun 17 06:26:45 2024 JM, OF, AK, CBChange to 5+ beam07:00

We are changing to 5+ beam so that
we can access higher energies and possibly
 7x 
  309   Sun Feb 27 16:30:35 2022 Rui-Jiu Chen, YuriChange target temperature again1. change T from 95 k to 140 k.

2. keep T at 140k for 15 minutes.

3. change T from 140 k to 95 k.
  
  307   Sun Feb 27 15:02:16 2022 Rui-Jiu Chen, YuriChange target temperature16:00 change temperature from 95 k to 120k.

16:07 change temperature from 120
k to 95k.
 14x 
  311   Sun Feb 27 18:46:42 2022 Rui-Jiu Chen, YuriChange target temperaturetime             
Temperature            
E1 current(A)                
  
  499   Thu Feb 8 14:59:59 2024 JM, TDChange p+n FEE64 settingsASIC settings for the pn FEEs has been reset
to the default aida settings. This was done
to combat the observed dropping of several
  