ID |
Date |
Author |
Subject |
Text |
 |
92
|
Tue Sep 28 18:53:13 2021 |
RSS JM | CARME baking status -10 |
Current temperature ~130 C (on manual
mode)
See plot and screen attached.
Current
pressure ~9.98E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
|
 |
81
|
Fri Sep 24 15:36:34 2021 |
CB (remotely) | CARME baking status | Current temperature ~64 C
See plots attached
|
 |
151
|
Thu Nov 11 11:44:58 2021 |
RSS + ML OG + CB (remotely) | CARME baking started | With the help of OG, the baking tent was
built. MG started baking around 11:30 am
with a rate of 0.2 K/minute. |
    |
17
|
Mon Sep 21 09:51:57 2020 |
JM | CARME Status | Cooling of baking volume finished over
the weekend, attached are some plots of the
bakeout test. Bakeout2.png is the thermocouple |
|
188
|
Mon Feb 7 08:09:50 2022 |
OH, CB and PH | CARME Server setup and initial tests | 09:09 Arrived at GSI for comissioning beamtime.
CARME currently in a stopped state,
with all FEEs powered off.
|
|
70
|
Fri Sep 17 16:42:25 2021 |
JM RSS ML + OG | CARME Realignment + Thermocouple installation | Laser surveying team worked till 11. Chamber
was too high by 3mm close to the jet target
and 6mm by the turbo pump (towards the dipole). |
8x |
130
|
Fri Oct 22 13:22:48 2021 |
TD | CARME FEE64 adaptor PCB | |
10x |
1
|
Mon Aug 17 08:16:16 2020 |
TD | CARME Elog |
Test |
|
212
|
Sat Feb 19 14:51:58 2022 |
JM, CB | Burst high energy noise | Noticed bursts of high energy noise on
aida01 and aida02 during run 47 and 48.
Good events rate jumps from 10-20k |
    |
146
|
Tue Nov 9 15:03:29 2021 |
RSS + OG | Burnt cables issues | Upper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then |
7x |
426
|
Sun Jul 23 10:13:48 2023 |
RSS, TD | Building tent | 11.15 Pirani 1.0e-03mbar IE514 2.72e-08mbar
16.35 Pirani 1.0e-03mbar IE514 2.61e-08mbar |
   |
428
|
Tue Jul 25 09:12:15 2023 |
RSS | Building tent |
10:10 IE514 2.0e-08mbar
Upstream
part of the CARME is covered. |
 |
429
|
Wed Jul 26 08:28:09 2023 |
RSS | Building tent |
09:26 IE514 1.96e-08mbar |
   |
493
|
Mon Feb 5 19:43:52 2024 |
CB, TD, ML | BuTIS reference for VETAR2 |
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of |
  |
125
|
Sat Oct 16 17:25:47 2021 |
RSS TD | Broken detectors | One of the detectors was damaged while
mounting (see pictures 1-3).
Second detector was found already |
    |
185
|
Thu Feb 3 22:05:33 2022 |
JM, TD, OH(remotely) | Bias update and grounding | 9:30 Bias remained stable overnight - 60V
2.95 uA.
10:00 No grounding attached initailly. |
|
465
|
Sat Jan 13 14:25:05 2024 |
CB, JM | Bias tests with all FEEs connected | Connected all FEEs.
The two top fees corresponding
to the bottom right detector are connected |
 |
416
|
Thu Jul 13 00:12:19 2023 |
JM, CB | Bellow replaced | The left (inside ring) bellow for the motors
rod was replaced.
Replacing the bellow involved; |
|
632
|
Fri Jun 14 14:52:02 2024 |
JM | Beam-Target Overlap Scan | The orbit of the beam in the ring was re-configured
so that the beam position is more central.
With the target density at ~6e11 |
 |
606
|
Sun Jun 9 09:45:27 2024 |
JM, CB | Beam-Target Overlap | Target density this morning had stabalised
at 7e11 at/cm2
This is sufficient to test the |
|