  92   Tue Sep 28 18:53:13 2021 RSS JMCARME baking status -10
Current temperature ~130 C (on manual
mode)
See plot and screen attached.

Current
pressure ~9.98E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
 Screenshot_from_2021-09-28_19-54-16.pngScreenshot_from_2021-09-28_19-51-19.png 
  81   Fri Sep 24 15:36:34 2021 CB (remotely)CARME baking statusCurrent temperature ~64 C

See plots attached
 Temp.pngTemps.png 
  151   Thu Nov 11 11:44:58 2021 RSS + ML OG + CB (remotely)CARME baking startedWith the help of OG, the baking tent was
built. MG started baking around 11:30 am
with a rate of 0.2 K/minute.
 IMG_5535.JPGIMG_5537.JPGIMG_5531.JPGIMG_5534.JPGIMG_5539.JPG 
  17   Mon Sep 21 09:51:57 2020 JMCARME StatusCooling of baking volume finished over
the weekend, attached are some plots of the
bakeout test. Bakeout2.png is the thermocouple
 Graphs.zip 
  188   Mon Feb 7 08:09:50 2022 OH, CB and PHCARME Server setup and initial tests09:09 Arrived at GSI for comissioning beamtime.
      CARME currently in a stopped state,
with all FEEs powered off.
  
  70   Fri Sep 17 16:42:25 2021 JM RSS ML + OGCARME Realignment + Thermocouple installationLaser surveying team worked till 11. Chamber
was too high by 3mm close to the jet target
and 6mm by the turbo pump (towards the dipole). 
 8x 
  130   Fri Oct 22 13:22:48 2021 TDCARME FEE64 adaptor PCB   10x 
  1   Mon Aug 17 08:16:16 2020 TDCARME Elog
Test
  
  212   Sat Feb 19 14:51:58 2022 JM, CBBurst high energy noiseNoticed bursts of high energy noise on
aida01 and aida02 during run 47 and 48.

Good events rate jumps from 10-20k
 2022-02-19_15-50-50-aida1-4-stat-logscale.png2022-02-19_15-47-13-aida1-2*H.png2022-02-19_15-49-48-aida2-1*H.png2022-02-20_14-01-40-aida1-2*H.png2022-02-20_14-02-55-aida1-1*H.png 
  146   Tue Nov 9 15:03:29 2021 RSS + OGBurnt cables issuesUpper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then
 7x 
  426   Sun Jul 23 10:13:48 2023 RSS, TDBuilding tent11.15 Pirani 1.0e-03mbar IE514 2.72e-08mbar

16.35 Pirani 1.0e-03mbar IE514 2.61e-08mbar
 DBE0DA2E-2F69-469C-B645-3E33E3D82138.jpeg857185AC-3571-41E9-88AE-9F624445135B.jpegE69ED1D1-444E-478A-A3B4-481023B4024D.jpeg610048A3-25F5-459C-9EF1-83EFEFDE51C9.jpeg 
  428   Tue Jul 25 09:12:15 2023 RSSBuilding tent
10:10  IE514 2.0e-08mbar

Upstream
part of the CARME is covered.
 BD01C0C8-5181-49B8-8751-AD4C99A459CC.jpeg7B3836F1-8A7E-491B-AFDC-46033BF84760.jpeg 
  429   Wed Jul 26 08:28:09 2023 RSSBuilding tent
09:26  IE514 1.96e-08mbar
 IMG_9897.jpgIMG_9899.jpgIMG_9901.jpgIMG_9902.jpg 
  493   Mon Feb 5 19:43:52 2024 CB, TD, MLBuTIS reference for VETAR2
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of
 20240205_173029.jpg20240205_172957.jpgScreenshot_from_2024-02-05_16-43-18.png 
  125   Sat Oct 16 17:25:47 2021 RSS TDBroken detectorsOne of the detectors was damaged while
mounting (see pictures 1-3).

Second detector was found already
 IMG_5098.JPGIMG_5097.JPGIMG_5096.JPGIMG_5106.JPGIMG_5105.JPG 
  185   Thu Feb 3 22:05:33 2022 JM, TD, OH(remotely)Bias update and grounding9:30 Bias remained stable overnight - 60V
2.95 uA.

10:00 No grounding attached initailly.
  
  465   Sat Jan 13 14:25:05 2024 CB, JMBias tests with all FEEs connectedConnected all FEEs.

The two top fees corresponding
to the bottom right detector are connected
 Screenshot_2024-01-13_15-24-40.png20240113_150158.jpg 
  416   Thu Jul 13 00:12:19 2023 JM, CBBellow replacedThe left (inside ring) bellow for the motors
rod was replaced.

Replacing the bellow involved;
 20230705_164523.jpg 
  632   Fri Jun 14 14:52:02 2024 JMBeam-Target Overlap ScanThe orbit of the beam in the ring was re-configured
so that the beam position is more central.

With the target density at ~6e11
 20240614_153532.jpgBeam-overlap-updated.png 
  606   Sun Jun 9 09:45:27 2024 JM, CBBeam-Target OverlapTarget density this morning had stabalised
at 7e11 at/cm2

This is sufficient to test the
 Beam-overlap.png 