|
ID |
Date |
Author |
Subject |
Text |
 |
|
760
|
Sun Jul 6 11:35:28 2025 |
CB | Anydesk version updated | Updated anydesk to 6.3.2 CentOS7 release.
Works now. |
|
|
759
|
Sat Jul 5 08:51:33 2025 |
EBM | anydesk connection settings | |
|
|
758
|
Wed Jun 18 14:21:39 2025 |
CB | CARME off | 15:20
DAQ stopped
Merger & Tape Server stopped |
|
|
757
|
Tue Jun 17 23:51:58 2025 |
TD, CB, JG | Run 96 - continued |
00.31 DAQ continues data file G22-205/R96_27
|
23x |
|
756
|
Tue Jun 17 19:10:07 2025 |
NH, PMH | Run 96 | 20:00 - Go to YR cave to see what is going
on
|
7x |
|
755
|
Tue Jun 17 12:22:50 2025 |
CB EW JG AG SN | Run 94/95/96 | Run 94
Background with beam at 150 keV
and no target. |
|
|
754
|
Tue Jun 17 12:14:30 2025 |
EW, CB, AG | Run 93- Background with beam 150keV | Run 93- New run at 150keV, background with
beam
13:15 All checks ok |
   |
|
753
|
Tue Jun 17 08:04:09 2025 |
EW, AG, CB | Run 92- Background with beam 90keV | Run 92- started at 09:00, background with
beam
Same settings as run 91 |
   |
|
752
|
Mon Jun 16 22:06:00 2025 |
CB, AR, EW | RUN 90-91 | 23:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45 |
14x |
|
751
|
Mon Jun 16 21:58:00 2025 |
CB AR | Runs 84-89 | Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal, |
|
|
750
|
Mon Jun 16 11:12:22 2025 |
JG, AK, AR, EH | run 83 | 12:15 restarted measurement with target
- Run 83
same settings as for runs 76, 77 |
8x |
|
749
|
Mon Jun 16 10:46:11 2025 |
CB JM JG AK | Run82 | Background without beam while source is
optimised. |
|
|
748
|
Mon Jun 16 08:17:41 2025 |
JG | D2 consumption | The current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar. |
|
|
747
|
Sun Jun 15 10:46:35 2025 |
EW, EM, AR, AB, CB, JG, AK | Run 81 | 11:45 New run started - run 81, same settings
as previous runs (75, 76 etc)
ROOT histograms NOT zeroed |
30x |
|
746
|
Sun Jun 15 07:01:37 2025 |
EW, EM | Run 80 | 08:00 New run started - run 80
Run whilst they are optimising
the beam after losing it, everything else |
    |
|
745
|
Fri Jun 13 19:41:32 2025 |
JG, SHB, JM, AR, EW, OF | Run 77, 78, 79 | New run started - Run 77 after refilling
LN2 dewar
Same settings as Run 75 & 76 |
17x |
|
744
|
Fri Jun 13 16:39:18 2025 |
JG, SHB | Run 76 | Same settings as run 75.
Detector 4 is biased at 100V and
switched from MEC to LEC. |
7x |
|
743
|
Fri Jun 13 14:45:58 2025 |
JG, SS, JM, CB, EW, AR | Run 75 |
90 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
 |
|
742
|
Thu Jun 12 15:33:17 2025 |
CB, JM, EM, JG, TD, AB, CF, AR | Run 74 | 16:34
Like Run 73, but particle detector
in YR10 now active, and recorded in MBS. |
27x |
|
741
|
Thu Jun 12 14:22:27 2025 |
JM, CB, TD, CF, JG, EM | Run 73 | 15:00
Cave closed, waiting for beam to
come back. |
   |
|
740
|
Thu Jun 12 14:08:42 2025 |
JM, CB | Run 72 - pulser walkthrough | Pulser walkthrough conducted while the
cave was open.
Pulser amplitudes 90000, 80000, |
|
|
739
|
Thu Jun 12 06:20:50 2025 |
JM | Run 68,69 - background | 07:20
Started a background run while
the cave is open. |
 |
|
738
|
Wed Jun 11 10:13:42 2025 |
EW, CB, PJW, AR, JM | Run 67 | As run 66, optimisation of beam completed
DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC |
14x |
|
737
|
Wed Jun 11 09:16:55 2025 |
CB | ASIC Control Settings | 11 June 10:18
2025Apr08-13.45.30 settings
DSSD4 not working as of the screenshots |
17x |
|
736
|
Wed Jun 11 08:37:48 2025 |
CB, PJW | Run 66 | 09:38
As Run 65, no changes, CRYRING
operators attempting to improve beam intensity. |
 |
|
735
|
Tue Jun 10 22:38:59 2025 |
JM, CB, PJW | Run 65 | 23:40
Offline anlaysis shows two clear
peaks for DSSD1 and 2 at very low energies |
7x |
|
734
|
Tue Jun 10 16:46:39 2025 |
JM, CB, EW, AY, PC | 150 keV - Run64 | Run 64 started.
150 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
42x |
|
733
|
Tue Jun 10 13:29:23 2025 |
EW, CB, JM | Thresholds changed | Experimented with slow comparator thresholds
as we go down to lower beam energies
Checked deadlayer loses with SRIM, |
   |
|
732
|
Tue Jun 10 09:57:50 2025 |
CB, JM, PJW, YuL, JG | Run 62 | 10:58
As Run 61, no target for background.
200 keV/A |
|
|
731
|
Tue Jun 10 09:44:33 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)
This means, no detector and target |
|
|
730
|
Tue Jun 10 09:44:30 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
|
|
729
|
Tue Jun 10 09:44:20 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
|
|
728
|
Sun Jun 8 11:55:00 2025 |
EM, PC, JM, CB, EW, AY, CB, PJW, YuL | Run 58,59,60, 61 | 12:52
Started Run 58 - Beam energy
200 keV/u. |
50x |
|
727
|
Sun Jun 8 10:05:30 2025 |
EM, PC, JM | Run57 | 11:06
Run during beam change. We will
go down to 200 keV/u |
|
|
726
|
Sun Jun 8 09:07:22 2025 |
EM, PC, JM | Run56 | NOTE: RunR55 is missing
Run56: Background run with 250
keV/u. Target off using the usual procedure. |
 |
|
725
|
Sat Jun 7 10:23:26 2025 |
JM, CB | carme-gsi rebooted | 10:00
The computer screen controlling
the DAQ on carme-gsi appeared to have crashed. |
|
|
724
|
Sat Jun 7 10:06:27 2025 |
JM, EM, CB, DB, AY, PC, CB | Run 54 | 11:10
We have started a new run at the
same energy as R53 (250 keV/u) due to an |
50x |
|
723
|
Fri Jun 6 17:27:03 2025 |
AY, ST, JM, EM, DB | Run 53 | Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2. |
11x |
|
722
|
Fri Jun 6 16:49:59 2025 |
CB, AY, ST | Beam overlap results for 200keV and 250keV | For 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal |
|
|
721
|
Thu Jun 5 16:54:18 2025 |
EW, ST, CB | Run 52 - 0.3 MeV/A | Run 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2
D+ beam deuterium target. D+ beam |
14x |
|
720
|
Thu Jun 5 08:50:00 2025 |
JM, CF, CB, EW | Run 51 - background | 09:49
DSSD4 has been biased to 100V in
steps of 5V from 60V. It was previously stable |
  |
|
719
|
Wed Jun 4 10:44:36 2025 |
EW, CB, JM, OF, JG, ST | Run 50 - 0.35 MeV/A | 11:30
Run 50 started.
D+ beam deuterium target. D+ beam |
13x |
|
718
|
Wed Jun 4 00:10:39 2025 |
JM | Run 49 - beam only | 01:10
Gas target turned off via the shutter
valve. |
6x |
|
717
|
Tue Jun 3 14:54:29 2025 |
PMH, ST | Run 48 | Run 48 started. Everything is running again.
We started at 3E13 at/cm2
D+ beam deuterium target. D+ beam |
6x |
|
716
|
Tue Jun 3 11:16:07 2025 |
EW, EM, JM | Run 47, beam only background | Run 47 started. Target cooling down after
water cooler failure, beam only background
D+ beam deuterium target. D+ beam |
 |
|
715
|
Mon Jun 2 20:03:43 2025 |
JG, AG, CB, EW, EM | Run 45/46, 0.5 MeV/A | Run 45 started.
D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation |
13x |
|
714
|
Mon Jun 2 17:48:07 2025 |
JG, AG | Run 44 scraper tests | Same settings are Run 43 but with coasting
beam and scrapers set to: 30 / - 30
mm. |
 |
|
713
|
Mon Jun 2 17:25:31 2025 |
JG, AG | Run 43 scraper tests | Same settings are Run 42 but bunched beam
and scrapers set to: 30 / - 30 mm.
|
|
|
712
|
Mon Jun 2 16:35:35 2025 |
EW, AG | Run 42 and scraper tests | 17:00
Scraper tests conducted. We tried
moving in the scrapers both at a fixed position |
 |
|
711
|
Mon Jun 2 09:30:38 2025 |
JM, EW, ST | Run 41 | Run 41 started.
D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation |
6x |
|
710
|
Sun Jun 1 15:33:50 2025 |
EW, JM, CB | Run 40 | 16:30
Run 40 started.
D+ beam deuterium target. D+ beam |
10x |
|
709
|
Sun Jun 1 07:46:34 2025 |
JM, EM, CB | Run 39 | 08:45
Run 39 started.
D+ beam deuterium target. D+ beam |
7x |
|
708
|
Sat May 31 10:46:42 2025 |
TD | Run 38 - remote monitoring |
11.40 DAQ continues
File G22-205/R38
|
21x |
|
707
|
Sat May 31 09:58:21 2025 |
JM | Run 38 | 10:56
Run 38 started.
D+ beam deuterium target. D+ beam |
10x |
|
706
|
Fri May 30 21:49:08 2025 |
JM, NP, CB | Run 37 | 22:49
Run 37 started.
D+ beam deuterium target. D+ beam |
  |
|
705
|
Fri May 30 20:47:47 2025 |
JM, CB, NP | Run 36 | 21:47
Run 36 started.
D+ beam deuterium target. D+ beam |
 |
|
704
|
Fri May 30 20:06:48 2025 |
JM, CB, NP | Run35 | 21:00
Run 35 started.
D+ beam deuterium target. D+ beam |
8x |
|
703
|
Fri May 30 07:27:41 2025 |
CB LB JM NP EM | Waiting for deuterium | 08:27
No run going.
Temperatures OK - attach |
8x |
|
702
|
Thu May 29 18:04:47 2025 |
LB, CB, PMH, JM | Run 32,33,34 | Oven temperature increased, current up
to 3.5E7 pps.
Found beam-target overlap setting |
7x |
|
701
|
Thu May 29 14:39:52 2025 |
CB LB PMH | Run 31 | 15:40
Waiting for Serge to come in to
change beam energy. |
9x |
|
700
|
Wed May 28 16:40:48 2025 |
EH, SN, LB, OF, EBM, CB | Run 28/29/30 - 1.88 MeV/A | We start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically. |
37x |
|
699
|
Wed May 28 10:54:14 2025 |
LB | Run 27 | Run 27 running
28/05/2025
(ignore 26 - in-between run) |
    |
|
698
|
Tue May 27 22:20:11 2025 |
CB, LB,PW | Run 25 - 1.99/2.02 MeV/A | 23:20
JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot |
27x |
|
697
|
Tue May 27 15:18:46 2025 |
JG, CN, JM | run 24 | Run 24 running
27/05/2025
We start a new run with real data |
7x |
|
696
|
Tue May 27 12:49:48 2025 |
ML | Ion beam / electron beam settings so far. | Screenshots and ParamModi settings export
attached. |
    |
|
695
|
Tue May 27 08:38:29 2025 |
TD | [How To] Recover DAQ when one FEE64 stops sending data - short(er) version | 1) Select 'No Storage' [workspace 4, display
1, browser tab 'TapeServer']
If already in 'No Storage' mode please |
|
|
694
|
Tue May 27 05:24:05 2025 |
LB,SN, L. Cs. P. J. W. | Run 22, 23 - 1.95 MeV/A | 27/05/2025 ca. 6:00
We start a new run: beam is ok,
target density ok, detectors are moving in-out |
8x |
|
693
|
Tue May 27 05:03:41 2025 |
JM | DAQ restart | 06:00
FEE modules power cycled.
No issues on power cycle restart. |
7x |
|
692
|
Mon May 26 18:37:17 2025 |
LC, AG, LB, SN | Run 21 | Run 21 running
26/05/2025 19:42 p.m.
We start a new run with real data |
12x |
|
691
|
Mon May 26 08:56:56 2025 |
EM,LB | Run20 | Run 20 running
We start a new run since the laser
guys will do some measurements. |
8x |
|
690
|
Sat May 24 18:27:55 2025 |
EM, LC | Background runs continued R17-R19 | Summary: Target not running. Background
runs written to disk, some with beam some
without. |
36x |
|
689
|
Sat May 24 08:28:14 2025 |
TD, EM | Background runs R13-R16 | Summary: Target not running. Some background
files written to disk, some with beam some
without.
|
29x |
|
688
|
Fri May 23 09:19:40 2025 |
SN, TD | Target wait, switch lithium oven |
10.12 DAQ, Merger & Tape Server running OK
- no storage mode
|
18x |
|
687
|
Thu May 22 06:41:10 2025 |
JG, TD | R6 - R11 scrapers test / pulser walk | 07.00
JG found target off (target data stopped |
33x |
|
686
|
Wed May 21 14:38:22 2025 |
JM, TD | R4 and R5 - background | 15:30
Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished |
7x |
|
685
|
Tue May 20 19:38:36 2025 |
JM | CARME restart | 19:00
Arrived at GSI.
We have 6Li1+ beam in the ring |
6x |
|
684
|
Sat May 17 11:19:06 2025 |
JM | Shifter intructions 2025 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
|
683
|
Tue May 13 15:07:42 2025 |
JM | Online monitoring code | CARME_Sort histogramming has been updated
to aid our understanding online.
> XY plots have been updated |
  |
|
682
|
Mon May 12 13:25:09 2025 |
JG | MBS DAQ - overview | An MBS DAQ is running to collect two types
of data:
|
|
|