  663   Sat Apr 5 16:15:04 2025 TDFEE64 power interlock installed
Water flow and dew point sensors have been
installed on the outlet and inlet cooling
 10x 
  662   Sat Apr 5 16:13:32 2025 TDSaturday 5 April
12.00 CARME IE514 ion gauge 4.2e-11 mbar
      CARME IE514 OFF
 7x 
  661   Fri Apr 4 10:17:16 2025 TDFriday 4 April
10.43 Reboot carme-gsi - unable to open a
working terminal
  
  660   Mon Mar 10 15:47:27 2025 TDAnalysis data files G22-201 R79_10 & R79_24
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
 R79_10.txtR79_24.txt 