Fri May 10 21:23:35 2024, TD, CB, JM, 20Ne7+ test beam 18x
|
Sun Apr 28 23:12:11 2024, TD, Monday 28 April 21x
|
Sat Apr 27 23:16:02 2024, TD, Sunday 28 April 37x
|
Fri Apr 26 23:41:16 2024, TD, Saturday 27 April 37x
|
Fri Apr 26 07:05:01 2024, TD, Friday 26 April 19x
|
Thu Apr 25 02:31:25 2024, TD, Thursday 25 April 39x
|
Wed Apr 24 13:18:09 2024, TD, Examples of poor CARME cable management/routing
|
Wed Apr 24 12:48:35 2024, TD, Wednesday 24 April 21x
|
Tue Apr 23 17:44:41 2024, TD, Tuesday 23 April 12x
|
Fri Apr 19 02:47:59 2024, TD, Friday 19 April 12x
|
Thu Apr 18 13:34:06 2024, TD, JG, Thursday 18 April 13x
|
Wed Mar 6 10:47:11 2024, JG, TD, Wednesday 6 March - PEXARIA5 WR test
|
Wed Feb 21 07:38:32 2024, TD, Wedneday 21 February 24x
|
Tue Feb 20 14:12:32 2024, JM, Shutdown
|
Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check
|
Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check
|
Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target
|
Tue Feb 20 08:41:08 2024, OF, AG, still no beam CRYRING
|
Tue Feb 20 07:50:10 2024, JM, DAQ restart
|
Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
|
Mon Feb 19 08:45:22 2024, JM, JG, SHB, EM, EH, Run 44 - cooled beam on target 35x
|
Mon Feb 19 06:01:17 2024, SHB, JM, JG, Run 42 morning shift 6x
|
Mon Feb 19 05:10:48 2024, TD, Run 42 night shift contd. 6x
|
Sun Feb 18 22:03:56 2024, TD, Run 42 night shift 47x
|
Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
|
Sun Feb 18 13:10:18 2024, TD, Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra
|
Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
|
Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
|
Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
|
Sat Feb 17 13:21:44 2024, JM, CB, Beam on target - motors tests
|
Sat Feb 17 06:19:27 2024, JM, CB, Run 35 - contd
|
Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x
|
Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
|
Thu Feb 15 21:07:00 2024, JM, AB, AR, OF, Run33 - cooled beam on target 22x
|
Thu Feb 15 13:18:30 2024, JG, MBS DAQ: target & ring values
|
Thu Feb 15 12:40:52 2024, JM. CB, AR, AB, Run30 - uncooled beam on target 29x
|
Thu Feb 15 10:39:50 2024, JM, JG, ML, AG, CB, Run29 - beam optimisation
|
Wed Feb 14 16:52:46 2024, JM, AR, CB, JG, Run28 - beam on target 42x
|
Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation
|
Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough
|
Wed Feb 14 08:44:32 2024, CB AR JM, Motors test and turbo ON 11x
|
Tue Feb 13 17:19:43 2024, JM, AR, NP, AB, RSS, Run22 - cooled beam on target (definitely maybe) 48x
|
Tue Feb 13 08:34:44 2024, Hw, JM, AR, CB, NP, AB, RSS, Status of DAQ - beam overlap 10x
|
Mon Feb 12 01:40:48 2024, TD, JM, CB, AR, RSS, Run17 - Run20 49x
|
Sun Feb 11 13:28:46 2024, JM, CB, TD, Run16 - beam on target 30x
|
Sun Feb 11 07:03:34 2024, TD, Sunday 11 February 20x
|
Sat Feb 10 17:05:13 2024, TD, Run 15 - background 20x
|
Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
|
Fri Feb 9 17:04:39 2024, JM, AR, CB, NH, Run12 - Background
|
Fri Feb 9 11:58:04 2024, TD + CB, JM, AR, NH, AB, Run10 contd, Run11 27x
|
Fri Feb 9 07:57:38 2024, AR, CB, AB, JM, Run10 - First cool beam on target 27x
|
Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough
|
Thu Feb 8 14:59:59 2024, JM, TD, Change p+n FEE64 settings
|
Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024
|
Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift
|
Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift
|
Tue Feb 6 09:39:54 2024, CB, Detector bias tests 13x
|
Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals
|
Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2
|
Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4
|
Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
|
Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
|
Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk
|
Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x
|
Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix 7x
|
Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
|
Thu Feb 1 14:45:09 2024, JM, CB, NewMerger setup
|
Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
|
Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
|
Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware
|
Tue Jan 30 09:14:50 2024, JM, TD, Tuesday 30 January 32x
|
Mon Jan 29 15:32:08 2024, TD, JM, Monday 29 January contd. 16x
|
Mon Jan 29 08:52:07 2024, TD JM, Monday 29 January 32x
|
Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems
|
Mon Jan 22 16:29:31 2024, TD, Saturday 20 January 30x
|
Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x
|
Thu Jan 18 17:21:00 2024, TD, Thursday 18 January
|
Wed Jan 17 19:21:20 2024, TD, AIDA spares
|
Wed Jan 17 19:15:47 2024, TD, Wednesday 17 January
|
Wed Jan 17 10:31:05 2024, TD, Remote control of CAEN N1419ET from nnrpi1
|
Tue Jan 16 16:01:48 2024, TD, Change CARMEraspberrypi to nnrpi1
|
Tue Jan 16 14:36:30 2024, TD, CARME configuration
|
Tue Jan 16 08:57:44 2024, JG, DR, TD, Tuesday 16 January 8x
|
Mon Jan 15 18:51:28 2024, JG, DR, TD, Monday 15 January
|
Sun Jan 14 12:31:32 2024, JM, CB, FEE positions mac addresses
|
Sat Jan 13 14:32:21 2024, CB, JM, Leaky manifold and cable management
|
Sat Jan 13 14:25:05 2024, CB, JM, Bias tests with all FEEs connected
|
Thu Jan 11 19:57:20 2024, CB, JM, All FEE holders mounted
|
Wed Jan 10 19:27:08 2024, CB, JM, Manifold and more bias tests
|
Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left)
|
Mon Jan 8 19:29:57 2024, CB, JM, Manifold repaired + fee assembly in bench
|
Mon Jan 8 19:27:36 2024, CB, JM, Leak current tests overnight
|
Sun Jan 7 15:38:57 2024, CB, JM, Manifolds mostly assembled + bias overnight check
|
Fri Jan 5 12:29:10 2024, JM, CB, Further bias tests
|
Thu Jan 4 13:15:10 2024, CB, JM, Tent removed - bias test
|
Wed Oct 18 16:47:36 2023, JG, CB, Power outage
|
Tue Oct 17 08:43:47 2023, CB, NEG activation -2
|
Mon Oct 16 08:28:02 2023, CB, NEG activation -1
|
Sun Oct 15 09:35:03 2023, CB, Starting ramp down
|
Tue Oct 3 08:48:36 2023, TD, Tuesday 3 October
|
Mon Oct 2 08:41:43 2023, TD, Monday 2 October 6x
|
Sun Oct 1 10:24:50 2023, TD, Sunday 1 October 12x
|
Sat Sep 30 10:58:14 2023, TD, Saturday 30 September 9x
|
Fri Sep 29 08:54:29 2023, TD, Friday 29 September 11x
|
Thu Sep 28 09:19:50 2023, TD, Thursday 28 September
|
Wed Sep 27 15:56:41 2023, TD, Wednesday 27 September
|
Tue Sep 26 10:13:14 2023, TD, ELOTECH PID Temperature Controller R4000 manual ( German and English )
|
Tue Sep 26 08:08:42 2023, TD, Tuesday 26 September 7x
|
Mon Sep 25 16:33:32 2023, TD, Removed tape from heaters TC
|
Fri Sep 22 12:35:46 2023, JM, Bakeout plots
|
Wed Sep 13 15:00:39 2023, ML, Vacuum and Heater temperature plots from Grafana
|
Sat Sep 2 10:04:55 2023, CB, Turbo GV closed
|
Fri Sep 1 08:11:40 2023, CB, NEG activation - 2
|
Thu Aug 31 08:36:34 2023, CB, NEG activation
|
Wed Aug 30 10:28:36 2023, CB, Preparing for pumps on
|
Wed Aug 30 09:33:13 2023, CB, OG, NEG cables repaired
|
Mon Aug 14 09:22:56 2023, JM, Bakeout
|
Sat Aug 12 15:06:51 2023, JM, Initial bakeout tests
|
Sat Aug 12 11:57:51 2023, JM, Updated thermocouple positions and heater channel layouts 6x
|
Thu Aug 10 07:51:43 2023, JM, Baking tent and heater testing 8x
|
Thu Jul 27 09:43:56 2023, RSS, Thermocouples connected -2
|
Wed Jul 26 08:28:09 2023, RSS, Building tent
|
Tue Jul 25 09:12:15 2023, RSS, Building tent
|
Mon Jul 24 10:40:14 2023, RSS, TD, Pump down continues
|
Sun Jul 23 10:13:48 2023, RSS, TD, Building tent
|
Sat Jul 22 09:19:59 2023, RSS, TD, Thermocouples connected 10x
|
Fri Jul 21 08:21:54 2023, TD, RSS, Baking tent manual
|
Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
|
Wed Jul 19 08:17:26 2023, TD, Leak testing
|
Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector.
|
Mon Jul 17 08:45:11 2023, TD, Closing CARME again
|
Fri Jul 14 08:27:17 2023, TD, CARME open - inspecting seal
|
Thu Jul 13 08:46:44 2023, TD, Replacing wire seal
|
Thu Jul 13 00:12:45 2023, JM, CB, CARME closed
|
Thu Jul 13 00:12:19 2023, JM, CB, Bellow replaced
|
Thu Jul 6 15:26:39 2023, JM, Leak update
|
Wed Jul 5 19:27:13 2023, JM, Pump down and leak test
|
Tue Jul 4 17:08:08 2023, JM, Leak test and venting
|
Mon Jun 26 14:49:05 2023, JM, TD, CARME vented
|
Sun Jun 25 14:30:06 2023, JM, TD, Motors bias test
|
Sun Jun 25 10:08:30 2023, JM, TD, Pump-down
|
Sun Jun 25 09:41:06 2023, JM, TD, Normal turbo-pump operation 6x
|
Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping
|
Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring
|
Wed Jun 21 18:47:36 2023, JM, TD, Closing CARME
|
Fri May 26 09:08:06 2023, JM, CB, Detector movement
|
Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed
|
Wed May 24 09:54:56 2023, JM, CB, Maximum detector positions 9x
|
Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed
|
Mon May 15 07:34:22 2023, TD, Monday 15 May
|
Sun May 14 11:55:12 2023, TD, Sunday 14 May
|
Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May
|
Fri May 12 16:24:20 2023, RSS, TD, V-I test 8x
|
Thu May 11 21:22:54 2023, RSS, TD, V-I test 7x
|
Wed May 10 19:06:18 2023, RSS, TD, V-I test
|
Tue May 2 15:02:09 2023, CB, JM, All detectors and harnesses mounted
|
Mon May 1 18:21:18 2023, CB, JM, All detectors mounted
|
Mon May 1 08:26:09 2023, CB, JM, Left hand detectors remounted
|
Sun Apr 30 10:01:39 2023, CB, JM, Left hand detectors unmounted 26x
|
Sat Apr 29 10:12:58 2023, CB, JM, CARME opened 8x
|
Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open
|
Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built
|
Tue Apr 25 13:22:19 2023, JM, CARME venting
|
Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount
|
Wed Mar 22 16:33:32 2023, TD, NIM WR source 8x
|
Wed Jan 18 13:32:36 2023, PJCS, MACB settings with either Emulator or VETAR
|
Thu Dec 8 14:41:19 2022, PJCS, Results of tests on AIDA PSU in DL T9 8x
|
Thu Dec 1 08:56:59 2022, AR TD, Thursday 1 December 11x
|
Wed Nov 30 08:52:59 2022, AR TD, Wednesday 30 November 26x
|
Tue Nov 29 14:37:56 2022, AR TD, Tuesday 29 November 22x
|
Mon Nov 28 13:14:33 2022, AR TD, Monday 28 November 12x
|
Mon Oct 3 16:03:33 2022, OH, CB, TTT14 Photos
|
Sun Aug 14 06:50:58 2022, TD, JM, Sunday 14 August 10x
|
Sat Aug 13 10:23:59 2022, JM, TD, Noise tests pt3 and pulser walk 15x
|
Fri Aug 12 15:12:37 2022, JM, TD, CARME measurements 9x
|
Fri Aug 12 09:06:57 2022, TD, JM, Noise tests pt2 30x
|
Thu Aug 11 09:25:13 2022, JM, TD, Noise tests 14x
|
Wed Aug 10 10:33:03 2022, TD, ML, JM, NP, Meeting at YR09 to discuss options for CARME operations to February 2022
|
Wed Aug 10 10:30:04 2022, TD, JM, Wednesday 10 August
|
Tue Aug 9 16:07:33 2022, JM, TD, Anydesk setup command line
|
Tue Aug 9 13:44:16 2022, TD, JM, Tuesday 9 August
|
Thu Mar 3 15:14:21 2022, JM, OH, CARME packing up
|
Wed Mar 2 22:29:48 2022, CB, SD, Last shift with beam 9x
|
Wed Mar 2 21:16:06 2022, JM, PM, Current status
|
Wed Mar 2 19:25:25 2022, JM, PM, Current status 10x
|
Wed Mar 2 17:21:35 2022, JM, PM, Current status 8x
|
Wed Mar 2 14:15:16 2022, JM, PM, Current status 6x
|
Wed Mar 2 09:38:50 2022, Spillmann, Uwe, ion source restarted
|
Wed Mar 2 06:00:49 2022, Spillmann, Uwe, waiting
|
Wed Mar 2 03:40:40 2022, David, George, Temperature Cycle
|
Wed Mar 2 01:24:48 2022, David, George, Ion Source Update
|
Tue Mar 1 23:43:15 2022, David, George, Beam Intensity Drop
|
Tue Mar 1 23:30:04 2022, David, George, Current status
|
Tue Mar 1 22:10:26 2022, David, George, Current status
|
Tue Mar 1 21:34:06 2022, PM, LV, check 14x
|
Tue Mar 1 20:41:28 2022, PM, LV, check 14x
|
Tue Mar 1 19:41:24 2022, PM, LV, target temperature walkthrough
|
Tue Mar 1 19:40:28 2022, PM, LV, check 12x
|
Tue Mar 1 18:43:41 2022, PM, LV, check 14x
|
Tue Mar 1 17:36:04 2022, PM, LV, check 14x
|
Tue Mar 1 16:57:34 2022, CB, LV, PMH, New run
|
Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
|
Tue Mar 1 12:58:32 2022, CB, MS, SS, ML, Synced pneumatic motion
|
Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
|
Tue Mar 1 10:43:36 2022, MS, SHB, check 11x
|
Tue Mar 1 10:35:59 2022, MS, SHB, next run on tape server tab
|
Tue Mar 1 08:02:26 2022, SHB, MS, check 11x
|
Tue Mar 1 06:35:42 2022, SHB, MS, check 11x
|
Tue Mar 1 06:04:04 2022, SHB, MS, positions
|
Tue Mar 1 05:23:02 2022, JM, EM, Current status
|
Tue Mar 1 04:07:31 2022, JM, EM, Temperature cycle
|
Tue Mar 1 03:34:28 2022, JM, EM, Current status 7x
|
Tue Mar 1 03:19:50 2022, JM, EM, Temperature Cycle
|
Tue Mar 1 02:15:29 2022, JM, EM, Current status 6x
|
Mon Feb 28 23:54:02 2022, JM, EM, Current Status, Temperature cycle
|
Mon Feb 28 22:34:51 2022, JM, EM, Current status
|
Mon Feb 28 14:47:52 2022, CB, TD, Monday 28 February 15:00-23:00 17x
|
Mon Feb 28 14:42:48 2022, CB, TD, Cryostat set to 115K
|
Mon Feb 28 14:38:15 2022, TD, NewMerger statistics 37x
|
Mon Feb 28 13:56:02 2022, JG, CB, Temperature cycle to 125K
|
Mon Feb 28 13:16:39 2022, JG, AK, CB, Current status 8x
|
Mon Feb 28 11:57:22 2022, JG, AK, CB, Current status 8x
|
Mon Feb 28 10:55:48 2022, JG, US, Current status 8x
|
Mon Feb 28 09:31:48 2022, JG, AK, CB, Current status 8x
|
Mon Feb 28 08:36:35 2022, JG, AK, CB, Current status 8x
|
Mon Feb 28 07:35:51 2022, JG, current logger crashed
|
Mon Feb 28 07:31:25 2022, JG, AK, Current status 8x
|
Mon Feb 28 06:12:58 2022, JG, AK, US, Current status 8x
|
Mon Feb 28 05:04:47 2022, JM, OF, Temperature cycle to 125K
|
Mon Feb 28 04:14:26 2022, JM, OF, Current status 9x
|
Mon Feb 28 03:16:37 2022, JM, OF, Current status 6x
|
Mon Feb 28 02:16:00 2022, JM, OF, Current status 6x
|
Mon Feb 28 01:16:02 2022, JM, OF, Temperature decrease 115K to 110K
|
Mon Feb 28 00:24:05 2022, JM, OF, Current status 7x
|
Sun Feb 27 23:17:33 2022, JM, OF, Current status 10x
|
Sun Feb 27 22:03:51 2022, JM, OF, Current Status 9x
|
Sun Feb 27 20:38:06 2022, Rui-Jiu Chen, Yuri, Current status 13x
|
Sun Feb 27 20:19:06 2022, Rui-Jiu Chen, Yuri, open the valves of target.
|
Sun Feb 27 19:01:02 2022, Rui-Jiu Chen, Yuri, Current status 13x
|
Sun Feb 27 18:46:42 2022, Rui-Jiu Chen, Yuri, Change target temperature
|
Sun Feb 27 17:00:45 2022, Rui-Jiu Chen, Yuri, current status 13x
|
Sun Feb 27 16:30:35 2022, Rui-Jiu Chen, Yuri, Change target temperature again
|
Sun Feb 27 15:41:33 2022, Rui-Jiu Chen, Yuri, current status 13x
|
Sun Feb 27 15:02:16 2022, Rui-Jiu Chen, Yuri, Change target temperature 14x
|
Sun Feb 27 14:05:30 2022, Rui-Jiu, Ragan, Current status 14x
|
Sun Feb 27 13:34:24 2022, RSS TD, Current status
|
Sun Feb 27 12:49:44 2022, TD RSS, Sunday 27 February 07:00-15:00 6x
|
Sun Feb 27 12:00:13 2022, RSS TD, Current status
|
Sun Feb 27 11:00:08 2022, RSS TD, Current status
|
Sun Feb 27 10:00:07 2022, RSS TD, Current status
|
Sun Feb 27 09:00:09 2022, RSS TD, Current status 7x
|
Sun Feb 27 08:00:23 2022, RSS TD, Current status
|
Sun Feb 27 06:58:51 2022, RSS TD, Current status
|
Sun Feb 27 06:23:42 2022, RSS TD, Current status 6x
|
Sun Feb 27 05:45:53 2022, David, Pierre-Michell, Current status
|
Sun Feb 27 04:54:46 2022, David, Pierre-Michell, Current status
|
Sun Feb 27 03:49:36 2022, David, Pierre-Michell, Current status
|
Sun Feb 27 02:38:52 2022, David, Pierre-Michell, Current status
|
Sun Feb 27 01:46:56 2022, David, Pierre-Michell, Current status
|
Sun Feb 27 00:53:24 2022, David, Pierre-Michell, Current status 7x
|
Sun Feb 27 00:07:15 2022, David, Pierre-Michell, No beam, valve closed
|
Sat Feb 26 23:20:13 2022, David, Pierre-Michell, Update status 7x
|
Sat Feb 26 22:22:27 2022, David, Pierre-Michell, Starting to take data 11x
|
Sat Feb 26 04:36:38 2022, RSS TD, Saturday 26 February 07:00-15:00 27x
|
Fri Feb 25 19:20:22 2022, MS, PJW, check 11x
|
Fri Feb 25 17:48:22 2022, MS, PJW, check 11x
|
Fri Feb 25 16:01:04 2022, MS, PJW, check 7x
|
Fri Feb 25 15:38:40 2022, JM, CB, PJW, Run 55, 56, 59 root histograms 6x
|
Fri Feb 25 11:20:30 2022, CB, Pressure and temperature data saved
|
Fri Feb 25 09:58:08 2022, GHC, CB, ML, EM, Current status
|
Fri Feb 25 08:14:47 2022, George, Esther, Current status
|
Fri Feb 25 06:57:09 2022, George, Esther, Current status
|
Fri Feb 25 06:28:12 2022, George, Esther, Current Status
|
Fri Feb 25 05:04:16 2022, Rui-Jiu Chen, Alex, check 14x
|
Fri Feb 25 03:20:29 2022, Rui-Jiu Chen, Alex, Current status
|
Fri Feb 25 03:01:11 2022, Rui-Jiu Chen, Alex, check 14x
|
Fri Feb 25 01:12:49 2022, Rui-Jiu Chen, Alex , Check 13x
|
Fri Feb 25 00:00:40 2022, Rui-Jiu Chen, Alex, Check 14x
|
Thu Feb 24 23:15:25 2022, Rui-Jiu Chen, Alex, Problems with ion souce.
|
Thu Feb 24 22:45:08 2022, Jordan, George, Rui-Jiu Chen, check 14x
|
Thu Feb 24 14:31:25 2022, JM, ML, CN, Beam Tuning Run 76 6x
|
Thu Feb 24 09:43:16 2022, JG, MS, check 13x
|
Thu Feb 24 08:30:36 2022, JG, MS, AIDA5 calibration test failed - solved
|
Thu Feb 24 08:15:23 2022, JG, MS, check 13x
|
Thu Feb 24 07:25:53 2022, OH (Remote), Recover of system after crash
|
Thu Feb 24 05:09:47 2022, CB, PE, EM, Inlet valve at target closed + problems with turbopump
|
Thu Feb 24 04:17:35 2022, CB, TD (remotely), MIDAS DAQ no longer working
|
Wed Feb 23 22:29:50 2022, PE, EM, CB (remotely), check - 23:30
|
Wed Feb 23 21:27:29 2022, TD, CN, check 11x
|
Wed Feb 23 20:52:56 2022, CN, TD, System wide checks 11x
|
Wed Feb 23 20:06:43 2022, TD CN, E141 kinematics
|
Wed Feb 23 19:22:55 2022, CN, TD, check 10x
|
Wed Feb 23 18:58:12 2022, TD CN, Wednesday 23 February 15.00-23.00 shift 6x
|
Wed Feb 23 16:57:35 2022, CB, CN, Optimising motor motion
|
Wed Feb 23 10:56:06 2022, Laszlo, Thanassis, Current status 10x
|
Wed Feb 23 09:50:19 2022, Laszlo, Thanassis, Moving detector in
|
Wed Feb 23 08:58:30 2022, Laszlo, Thanassis, Current status 10x
|
Wed Feb 23 07:58:38 2022, Laszlo, Thanassis, Current status 10x
|
Wed Feb 23 06:58:19 2022, Laszlo, Thanassis, Current status 11x
|
Wed Feb 23 06:00:25 2022, Jordan, George, Current status
|
Wed Feb 23 04:55:48 2022, Jordan, George, Current status
|
Wed Feb 23 03:52:13 2022, Jordan, George, Current status
|
Wed Feb 23 02:52:09 2022, Jordan, George, Current status
|
Wed Feb 23 01:56:59 2022, Jordan, George, Current status
|
Wed Feb 23 00:54:17 2022, Jordan, George, Current status
|
Tue Feb 22 21:57:13 2022, George, Jordan, Current status
|
Tue Feb 22 21:09:39 2022, David, Yuri, Current status
|
Tue Feb 22 20:08:40 2022, David, Yuri, Current status
|
Tue Feb 22 19:28:35 2022, David, Yuri, vacuum
|
Tue Feb 22 19:11:18 2022, David, Current status
|
Tue Feb 22 18:23:02 2022, David. Yury, Vacuum problem
|
Tue Feb 22 17:32:38 2022, David, Current status 12x
|
Tue Feb 22 16:09:08 2022, David, Yury, Current status 12x
|
Tue Feb 22 14:32:04 2022, David, Yury, Current status 12x
|
Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run
|
Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54 9x
|
Tue Feb 22 10:30:00 2022, RSS, OF, ML, Beam OFF, Target ON Run 54 10x
|
Tue Feb 22 10:06:50 2022, RSS, OF, ML, PMT channel
|
Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14
|
Tue Feb 22 08:31:25 2022, RSS, OF, ML, Beam OFF, Target ON Run 54 10x
|
Tue Feb 22 07:27:28 2022, RSS, OF, ML, Beam ON, Target ON Run 54 10x
|
Tue Feb 22 06:30:09 2022, RSS, OF, Beam ON, Target ON Run 54 10x
|
Tue Feb 22 05:47:18 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - 2 events at 10MeV! 11x
|
Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 11x
|
Tue Feb 22 04:09:28 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - first event at 10MeV ! 11x
|
Tue Feb 22 03:05:06 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 9x
|
Tue Feb 22 02:02:11 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 10x
|
Tue Feb 22 00:32:35 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54
|
Mon Feb 21 21:04:08 2022, SHB, JM, CB, OH (remotely), Schottky RF view from the beam inside
|
Mon Feb 21 20:56:51 2022, SHB, JM, CB, OH (remotely), DAQ connection for ion current
|
Mon Feb 21 18:03:58 2022, SHB, JM, CB, OH (remotely), Info: signals on ion intensity for experiment
|
Mon Feb 21 17:26:19 2022, JM, CB, SHB, OH (remotely), Beam ON run 53 9x
|
Mon Feb 21 12:10:47 2022, RSS, JG, Alpha background run50
|
Mon Feb 21 10:59:48 2022, RSS, JG, Alpha background run50
|
Mon Feb 21 09:07:37 2022, RSS, JG, Alpha background run50
|
Mon Feb 21 08:05:45 2022, RSS, JG, Alpha background run50
|
Sun Feb 20 22:04:21 2022, JM, CB, Alpha Background run 50
|
Sat Feb 19 20:08:43 2022, JM, CB, Beam ON run 49 6x
|
Sat Feb 19 14:51:58 2022, JM, CB, Burst high energy noise
|
Fri Feb 18 20:31:33 2022, JM, CB, Alpha Background run 48
|
Fri Feb 18 13:03:02 2022, RSS, ML, CB, Alpha background run46 11x
|
Fri Feb 18 11:07:52 2022, RSS, ML, CB, Alpha background run46 11x
|
Fri Feb 18 08:58:08 2022, RSS, ML, CB, Alpha background run46 11x
|
Thu Feb 17 18:19:16 2022, JM, CB, SD, Alpha Background run 46
|
Thu Feb 17 16:26:27 2022, JM, CB, SD, Gauges OFF, Pulser Movement tests 7x
|
Thu Feb 17 15:09:40 2022, JM,CB,SD, Alpha background run44 8x
|
Thu Feb 17 13:12:19 2022, RSS, AG, Alpha background run43 11x
|
Thu Feb 17 08:31:07 2022, RSS, AG, Alpha background run43 11x
|
Wed Feb 16 21:41:11 2022, JM, Run 43 Alpha Background 8x
|
Wed Feb 16 21:27:31 2022, JM, Cryring signals, Pulser tests, Waveforms 11x
|
Wed Feb 16 15:27:53 2022, EM, JM, Run 41 Pulser tests 11x
|
Wed Feb 16 12:43:05 2022, TP, RSS, Alpha background run40 11x
|
Wed Feb 16 08:27:27 2022, TP, RSS, Alpha background run40 11x
|
Tue Feb 15 21:28:14 2022, JM, Noisy Channels
|
Tue Feb 15 14:59:37 2022, JM, CB, RJC, Pulser walkthrough 11x
|
Tue Feb 15 10:46:37 2022, RSS, LV, CB, Alpha background run37 10x
|
Mon Feb 14 09:56:39 2022, CB, Shifters instructions 2022 10x
|
Sun Feb 13 21:28:35 2022, JM, CB, Alpha background Run 32, 35 6x
|
Sat Feb 12 19:48:38 2022, JM, CB, Grounding and movement tests 11x
|
Thu Feb 10 09:12:41 2022, OH, CB, US, Hourly motor movement
|
Wed Feb 9 08:01:41 2022, OH, CB, G-HC, Results from no beam overnight
|
Tue Feb 8 08:13:53 2022, OH, CB, DF, Hopefully effect of beam tuning on detectors 9x
|
Mon Feb 7 08:09:50 2022, OH, CB and PH, CARME Server setup and initial tests
|
Fri Feb 4 12:49:54 2022, TD, JM, Grounding Tests and current status 10x
|
Fri Feb 4 09:53:48 2022, JM, TD, OH (remotely), Alpha spectra overnight 8x
|
Thu Feb 3 22:05:33 2022, JM, TD, OH(remotely), Bias update and grounding
|
Wed Feb 2 21:53:32 2022, JM, TD, Detector Bias
|
Tue Feb 1 14:43:20 2022, JM, TD, Detector Bias, FEEs
|
Mon Jan 31 08:58:38 2022, OH, TD, JM, centos server configuration 8x
|
Sat Jan 29 11:04:07 2022, JM, OH, Grounding and Pulser
|
Thu Jan 27 21:33:40 2022, JM, OH, AIDA config files, remote access, motor test
|
Thu Jan 27 15:24:02 2022, OH, JM, Access to Motors PI
|
Thu Jan 27 15:19:18 2022, OH, JM, Enabling internet access on the carme-gsi server
|
Thu Jan 27 14:04:34 2022, OH, JM, Remote access to CARME server
|
Wed Jan 26 19:16:18 2022, JM, OH, Water cooling, FEE MAC address
|
Sat Jan 15 15:38:25 2022, JM, OH, TD, FEE installation, cable management
|
Sat Jan 15 11:28:10 2022, JM, Inventory
|
Fri Jan 14 10:00:18 2022, TD, OH, JM, Friday 14 January
|
Thu Jan 13 10:33:24 2022, JM, OH, TD, Adaptor Board misallignment
|
Wed Jan 12 20:07:20 2022, JM, OH, TD, FEE holder installation 10x
|
Tue Jan 11 12:45:15 2022, TD, JM, OH, Coolant manifold installation + detector pin tests
|
Mon Jan 10 20:52:53 2022, JM, TD, OH, Baking tent removed, VI tests
|
Tue Dec 7 09:39:59 2021, CB (remotely), Gate valves closed
|
Tue Nov 30 10:49:43 2021, CB (remotely) GV, Gate valve opened
|
Sun Nov 28 15:57:45 2021, CB (remotely), Nov 2021 temperatures
|
Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave
|
Wed Nov 24 12:08:08 2021, CB + ML OG, Ion pumps on
|
Tue Nov 23 08:49:33 2021, CB + ML, NEG activation completed
|
Mon Nov 22 08:06:01 2021, RSS CB + ML, NEG activation starts
|
Fri Nov 19 12:03:51 2021, CB RSS, Conditionings NEGs
|
Thu Nov 18 13:50:51 2021, CB RSS, Thermocamera images 14x
|
Thu Nov 18 12:29:50 2021, CB RSS, Conditioning D2000 NEGs
|
Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
|
Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues
|
Fri Nov 12 08:54:11 2021, RSS ML + CB (remotely) NK AK NP, First CARME baking attempt
|
Thu Nov 11 11:44:58 2021, RSS + ML OG + CB (remotely), CARME baking started
|
Thu Nov 11 14:01:00 2021, AK, ML, Heater channel layouts
|
Wed Nov 10 18:38:16 2021, RSS TD + ML OG AK NK, CARME wrapped in heating tape
|
Wed Nov 10 18:24:12 2021, RSS, Thermocouple labelling
|
Wed Nov 10 14:41:12 2021, TD RSS + CB (remotely), Wrapping CARME in heating tape
|
Tue Nov 9 15:03:29 2021, RSS + OG, Burnt cables issues 7x
|
Mon Nov 8 17:19:02 2021, RSS + OG, Neg and ion cables connected
|
Sat Nov 6 14:21:10 2021, CB RSS, Preparation for bakeout tent mounting + to do for next week
|
Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09
|
Wed Nov 3 16:39:01 2021, CB RSS + NP DR NK ML, Interaction chamber lifted in place
|
Wed Nov 3 11:18:11 2021, CB RSS + DR NK ML, Leak closed
|
Tue Nov 2 12:45:36 2021, CB + DR NK, Issues with CARME feet
|
Mon Nov 1 14:48:16 2021, CB + ML DR, CARME opened
|
Sun Oct 31 13:55:13 2021, CB OH, Leak tests
|
Sun Oct 31 08:05:15 2021, CB OH + DR ML, CARME closed again + feedthroughs labeled 11x
|
Sun Oct 31 07:55:39 2021, CB JM + OH, Strain relief mounted
|
Sun Oct 31 07:41:20 2021, CB JM + RSS, Wires plugged in DSSDs 8x
|
Sun Oct 31 07:29:17 2021, CB JM + RSS OG, Detectors mounted on plate in CARME 8x
|
Sun Oct 31 07:21:09 2021, CB JM RSS, Detectors arrived in GSI 6x
|
Fri Oct 29 15:09:27 2021, CB JM + RSS OG DR, Preparation to mount new DSSDs 6x
|
Sat Oct 23 12:58:11 2021, JM, GSI vacuum and bakeout testing summary
|
Fri Oct 22 13:22:48 2021, TD, CARME FEE64 adaptor PCB 10x
|
Fri Oct 22 13:11:26 2021, TD, MSL type TTT14 assembly drawings & pin assignments
|
Thu Oct 21 20:26:44 2021, JM TD, Thermocouple and Connector cables 10x
|
Mon Oct 18 16:25:11 2021, JM RSS TD, NEG rotation + cable removals
|
Sun Oct 17 11:48:48 2021, TD RSS, Sunday 17 October 14x
|
Sat Oct 16 17:25:47 2021, RSS TD, Broken detectors
|
Fri Oct 15 19:37:12 2021, RSS TD + DR, Friday 15 October 8x
|
Thu Oct 14 15:54:47 2021, TD RSS, Thursday 14 October
|
Wed Oct 13 15:28:22 2021, RSS TD + OG, Split funnels 7x
|
Wed Oct 13 15:16:12 2021, TD, Orientation of 2x 78 way D connector feedthroughs
|
Wed Oct 13 12:06:09 2021, RSS TD, Flanges cleaned 12x
|
Wed Oct 13 11:59:23 2021, TD, [How to] Open COF600 copper wire seals
|
Tue Oct 12 13:54:21 2021, RSS TD + OD DR, CARME opened 20x
|
Tue Oct 12 09:22:37 2021, RSS TD + OG DR, Motors problem solved
|
Mon Oct 11 11:24:16 2021, RSS TD ML, Valve support and cable labeling
|
Sat Oct 9 09:47:33 2021, CB, To do list for next week
|
Sat Oct 9 09:44:36 2021, CB RSS, Heaters removed + motors tests
|
Fri Oct 8 17:56:35 2021, CB RSS, Motors test
|
Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV
|
Wed Oct 6 15:36:14 2021, CB RSS, Neg activation tests -3
|
Wed Oct 6 09:47:30 2021, CB RSS, Neg activation tests -2
|
Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
|
Tue Oct 5 17:30:01 2021, CB RSS, NEG activation tests
|
Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
|
Mon Oct 4 20:30:46 2021, RSS JM CB (remotely), CARME baking status -21
|
Mon Oct 4 09:19:11 2021, JM RSS, Activation of NEG elements
|
Mon Oct 4 06:34:58 2021, RSS JM CB (remotely), CARME baking status -20
|
Sun Oct 3 08:36:01 2021, RSS JM CB (remotely), CARME baking status -19
|
Sat Oct 2 22:14:14 2021, RSS JM CB (remotely), CARME baking status -18
|
Sat Oct 2 08:26:49 2021, RSS JM CB (remotely), CARME baking status -17
|
Fri Oct 1 21:47:51 2021, CB (remotely), CARME baking status -16
|
Fri Oct 1 07:17:46 2021, RSS JM, CARME baking status -15
|
Thu Sep 30 18:16:52 2021, RSS JM, CARME baking status -14
|
Thu Sep 30 06:29:39 2021, RSS JM, CARME baking status -13
|
Wed Sep 29 15:34:07 2021, RSS JM, CARME baking status -12
|
Wed Sep 29 13:13:51 2021, JM RSS PB(remotely), Detector frame assembley
|
Wed Sep 29 09:27:38 2021, CB (remotely), RSS JM ML, Power cut
|
Wed Sep 29 06:49:41 2021, RSS JM, CARME baking status -11
|
Tue Sep 28 18:53:13 2021, RSS JM, CARME baking status -10
|
Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9
|
Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8
|
Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7
|
Mon Sep 27 17:53:35 2021, JM RSS , Baking Jacket upgrade + NEG controllers connected
|
Mon Sep 27 11:09:48 2021, CB (remotely), Temperature vs Pressure plot
|
Mon Sep 27 06:42:45 2021, RSS JM, CARME baking status -6
|
Sun Sep 26 17:20:13 2021, RSS JM CB (remotely), CARME baking status -5
|
Sun Sep 26 07:41:00 2021, CB (remotely), CARME baking status -4
|
Sat Sep 25 19:01:50 2021, CB (remotely), CARME baking status -3
|
Sat Sep 25 07:23:06 2021, CB (remotely), CARME baking status -2
|
Fri Sep 24 15:36:34 2021, CB (remotely), CARME baking status
|
Fri Sep 24 09:44:58 2021, JM ML, Vacuum gauge readout
|
Fri Sep 24 08:47:36 2021, JM RSS CB(Remotely), Baking
|
Fri Sep 24 07:04:57 2021, RSS JM, IE 514 pin arrangement and degas instructions
|
Thu Sep 23 14:19:27 2021, CB (remotely), Checking baking remotely - instructions
|
Thu Sep 23 13:31:12 2021, JM RSS ML, IE514 Gauge and Bakeout
|
Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent
|
Wed Sep 22 08:30:08 2021, CB (remotely), CARME pressure during first XHV test
|
Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
|
Tue Sep 21 08:20:39 2021, ML, CARME installations
|
Sun Sep 19 09:11:34 2021, CB (remotely), Baking RasPi status
|
Fri Sep 17 16:42:25 2021, JM RSS ML + OG, CARME Realignment + Thermocouple installation 8x
|
Thu Sep 16 15:24:29 2021, JM RSS, CARME vented + thermocouple feedthrough
|
Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown
|
Fri Sep 10 18:09:14 2021, CB RSS ML, Leak test + baking system test
|
Fri Sep 10 10:50:55 2021, CB RSS ML, Pressure after overnight pump down
|
Thu Sep 9 13:01:07 2021, CB RSS + OG, All feedthrough flanges mounted and motor rotated
|
Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
|
Wed Sep 8 10:52:54 2021, CB RSS + OG, First feedthrough flange mounted
|
Tue Sep 7 14:10:02 2021, CB RSS + OG, Strain relief SS support re-drilled
|
Tue Sep 7 12:40:43 2021, CB ML + RH, CARME survey preparation
|
Tue Sep 7 11:37:05 2021, CB RSS + OG, Update on strain relief screw issues
|
Mon Sep 6 14:13:17 2021, CB ML, Motors mounted - first attempt
|
Sat Sep 4 15:54:50 2021, CB RSS, Motor mounting preparation
|
Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps
|
Fri Sep 3 14:14:40 2021, TD, Leybold IE514 manual & calibration data
|
Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
|
Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down
|
Thu Sep 2 21:04:26 2021, CB RSS ML + DR OG, Gate valves mounted + pump down 6x
|
Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING
|
Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING
|
Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09
|
Tue Aug 31 18:56:35 2021, CB, CARME status 9x
|
Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand
|
Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift
|
Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
|
Wed Aug 25 07:02:41 2021, RSS TD, 25-31 August 19x
|
Wed Aug 18 11:58:49 2021, NTD RSS, Misc fittings and fasteners plus gasket inventory 22x
|
Wed Aug 18 07:07:26 2021, RSS TD, 18-24 August 25x
|
Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August 23x
|
Thu Aug 12 09:16:42 2021, TD RSS, Thursday 12 August 13x
|
Wed Aug 11 12:30:40 2021, TD RSS, Wednesday 11 August 8x
|
Tue Aug 10 12:22:56 2021, TD RSS, Tuesday 10 August
|
Mon Aug 9 12:36:00 2021, TD, RSS, ABD, Monday 9 August 7x
|
Mon Dec 7 14:29:12 2020, JM, CARME packing up
|
Fri Dec 4 16:49:36 2020, TD, Friday 4 December 7x
|
Wed Nov 25 10:39:37 2020, TD, Wednesday 25 November 7x
|
Tue Nov 24 12:24:01 2020, JM, RGA scans
|
Tue Nov 10 12:25:29 2020, JM, Cable harnesses
|
Thu Oct 29 08:02:29 2020, CB, JM (remotely), CARME pressure
|
Wed Oct 28 10:41:57 2020, TD, Wednesday 28 October 6x
|
Mon Oct 26 10:35:05 2020, JM, CB(remotely), Cooling
|
Thu Oct 22 22:15:00 2020, CB (remotely), Cooling down after first NEG activation 7x
|
Thu Oct 22 10:39:40 2020, TD, Thursday 22 October 19x
|
Mon Oct 19 13:57:52 2020, JM, Neg Activation
|
Mon Oct 12 10:49:36 2020, JM, First Bakeout of CARME with pumps (cont)
|
Mon Oct 5 08:21:40 2020, CB (remotely), JM, First bake of CARME with pumps (cont.) 6x
|
Wed Sep 30 08:10:36 2020, CB (remotely), First bake of CARME with pumps 19x
|
Mon Sep 28 13:04:27 2020, JM, Baking
|
Sat Sep 26 09:31:46 2020, JM, CB (both remotely), Baking over weekend
|
Fri Sep 25 12:58:33 2020, JM, Friday 25/09/20
|
Thu Sep 24 10:04:58 2020, JM, TD, Thursday 24 September
|
Wed Sep 23 13:34:32 2020, JM, TD, Wednesday 23 September
|
Wed Sep 23 13:34:04 2020, JM, Tuesday 22 September
|
Mon Sep 21 09:51:57 2020, JM, CARME Status
|
Fri Sep 18 10:28:57 2020, JM, CB(remotely), Baking status
|
Thu Sep 17 10:13:43 2020, JM, CB(remotely), Bakeout cooling and pumping of chamber
|
Wed Sep 16 17:46:36 2020, JM, Pumping of Chamber
|
Wed Sep 16 08:52:03 2020, CB (remotely), Baking status 16-17 September
|
Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status
|
Mon Sep 14 12:07:40 2020, JM, CB (remotely), Baking status
|
Sun Sep 13 08:06:25 2020, CB (remotely), Baking over the weekend -2
|
Sat Sep 12 08:38:52 2020, CB (remotely), Baking over the weekend
|
Thu Sep 10 11:34:30 2020, TD, JM, Thursday 10 September
|
Wed Sep 9 21:01:48 2020, JM, Neg Feedthroughs
|
Fri Sep 4 15:48:25 2020, JM, Bakeout test completed
|
Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation
|
Wed Aug 19 16:44:39 2020, JM, Neg Installs
|
Tue Aug 18 17:35:20 2020, TD, SAES UHV1400 pin assignment
|
Tue Aug 18 11:26:26 2020, JM, Week ending Friday 14/08/20
|
Mon Aug 17 08:16:16 2020, TD, CARME Elog
|
|