AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Entry  Fri May 10 21:23:35 2024, TD, CB, JM, 20Ne7+ test beam 18x
Entry  Sun Apr 28 23:12:11 2024, TD, Monday 28 April 21x
Entry  Sat Apr 27 23:16:02 2024, TD, Sunday 28 April 37x
Entry  Fri Apr 26 23:41:16 2024, TD, Saturday 27 April 37x
Entry  Fri Apr 26 07:05:01 2024, TD, Friday 26 April 19x
Entry  Thu Apr 25 02:31:25 2024, TD, Thursday 25 April 39x
Entry  Wed Apr 24 13:18:09 2024, TD, Examples of poor CARME cable management/routing 20240424_125858.jpg20240424_125929.jpg
Entry  Wed Apr 24 12:48:35 2024, TD, Wednesday 24 April 21x
Entry  Tue Apr 23 17:44:41 2024, TD, Tuesday 23 April 12x
Entry  Fri Apr 19 02:47:59 2024, TD, Friday 19 April 12x
Entry  Thu Apr 18 13:34:06 2024, TD, JG, Thursday 18 April 13x
Entry  Wed Mar 6 10:47:11 2024, JG, TD, Wednesday 6 March - PEXARIA5 WR test temps.PNGstats_1.PNGstats_2.PNGwr_0949.PNG
Entry  Wed Feb 21 07:38:32 2024, TD, Wedneday 21 February 24x
Entry  Tue Feb 20 14:12:32 2024, JM, Shutdown Screenshot_from_2024-02-20_15-11-40.png
Entry  Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check Screenshot_from_2024-02-20_14-22-05.pngScreenshot_from_2024-02-20_14-22-49.pngScreenshot_from_2024-02-20_14-29-39.pngScreenshot_from_2024-02-20_14-34-55.png
Entry  Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check Screenshot_from_2024-02-20_11-06-48.pngScreenshot_from_2024-02-20_11-08-05.pngScreenshot_from_2024-02-20_11-12-26.pngScreenshot_from_2024-02-20_11-13-58.png2024-02-20_11-37-46-304.png
Entry  Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target 
Entry  Tue Feb 20 08:41:08 2024, OF, AG, still no beam CRYRING 
Entry  Tue Feb 20 07:50:10 2024, JM, DAQ restart 
Entry  Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
Entry  Mon Feb 19 08:45:22 2024, JM, JG, SHB, EM, EH, Run 44 - cooled beam on target 35x
Entry  Mon Feb 19 06:01:17 2024, SHB, JM, JG, Run 42 morning shift 6x
Entry  Mon Feb 19 05:10:48 2024, TD, Run 42 night shift contd. 6x
Entry  Sun Feb 18 22:03:56 2024, TD, Run 42 night shift 47x
Entry  Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
Entry  Sun Feb 18 13:10:18 2024, TD, Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra Screenshot_from_2024-02-18_13-58-29.pngScreenshot_from_2024-02-18_13-59-55.pngScreenshot_from_2024-02-18_14-01-19.pngScreenshot_from_2024-02-18_14-08-36.pngScreenshot_from_2024-02-18_14-09-44.png
Entry  Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
Entry  Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
Entry  Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
Entry  Sat Feb 17 13:21:44 2024, JM, CB, Beam on target - motors tests Screenshot_from_2024-02-17_14-33-51.pngScreenshot_from_2024-02-17_14-36-27.pngScreenshot_from_2024-02-17_14-39-38.png
Entry  Sat Feb 17 06:19:27 2024, JM, CB, Run 35 - contd Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png
Entry  Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x
Entry  Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
Entry  Thu Feb 15 21:07:00 2024, JM, AB, AR, OF, Run33 - cooled beam on target 22x
Entry  Thu Feb 15 13:18:30 2024, JG, MBS DAQ: target & ring values 
Entry  Thu Feb 15 12:40:52 2024, JM. CB, AR, AB, Run30 - uncooled beam on target 29x
Entry  Thu Feb 15 10:39:50 2024, JM, JG, ML, AG, CB, Run29 - beam optimisation 
Entry  Wed Feb 14 16:52:46 2024, JM, AR, CB, JG, Run28 - beam on target  42x
Entry  Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation Target-overlap-scan-optimized.pdf
Entry  Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough 
Entry  Wed Feb 14 08:44:32 2024, CB AR JM, Motors test and turbo ON 11x
Entry  Tue Feb 13 17:19:43 2024, JM, AR, NP, AB, RSS, Run22 - cooled beam on target (definitely maybe) 48x
Entry  Tue Feb 13 08:34:44 2024, Hw, JM, AR, CB, NP, AB, RSS, Status of DAQ - beam overlap 10x
Entry  Mon Feb 12 01:40:48 2024, TD, JM, CB, AR, RSS, Run17 - Run20  49x
Entry  Sun Feb 11 13:28:46 2024, JM, CB, TD, Run16 - beam on target 30x
Entry  Sun Feb 11 07:03:34 2024, TD, Sunday 11 February 20x
Entry  Sat Feb 10 17:05:13 2024, TD, Run 15 - background 20x
Entry  Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
Entry  Fri Feb 9 17:04:39 2024, JM, AR, CB, NH, Run12 - Background 
Entry  Fri Feb 9 11:58:04 2024, TD + CB, JM, AR, NH, AB, Run10 contd, Run11 27x
Entry  Fri Feb 9 07:57:38 2024, AR, CB, AB, JM, Run10 - First cool beam on target 27x
Entry  Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough 4.png3.png
Entry  Thu Feb 8 14:59:59 2024, JM, TD, Change p+n FEE64 settings 
Entry  Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024 
Entry  Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png
Entry  Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift  Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png
Entry  Tue Feb 6 09:39:54 2024, CB, Detector bias tests 13x
Entry  Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals 20240205_174307.jpg
Entry  Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2 20240205_173029.jpg20240205_172957.jpgScreenshot_from_2024-02-05_16-43-18.png
Entry  Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png
Entry  Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
Entry  Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
Entry  Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk 
Entry  Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x
Entry  Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix  7x
Entry  Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
Entry  Thu Feb 1 14:45:09 2024, JM, CB, NewMerger setup 
Entry  Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
Entry  Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
Entry  Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed
Entry  Tue Jan 30 09:14:50 2024, JM, TD, Tuesday 30 January 32x
Entry  Mon Jan 29 15:32:08 2024, TD, JM, Monday 29 January contd. 16x
Entry  Mon Jan 29 08:52:07 2024, TD JM, Monday 29 January 32x
Entry  Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems 
Entry  Mon Jan 22 16:29:31 2024, TD, Saturday 20 January 30x
Entry  Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x
Entry  Thu Jan 18 17:21:00 2024, TD, Thursday 18 January Capture.PNG
Entry  Wed Jan 17 19:21:20 2024, TD, AIDA spares 
Entry  Wed Jan 17 19:15:47 2024, TD, Wednesday 17 January 
Entry  Wed Jan 17 10:31:05 2024, TD, Remote control of CAEN N1419ET from nnrpi1 Capture.PNG
Entry  Tue Jan 16 16:01:48 2024, TD, Change CARMEraspberrypi to nnrpi1 Capture.PNG
Entry  Tue Jan 16 14:36:30 2024, TD, CARME configuration dhcpd.confOptionsSettingsstartup.tclrfs
Entry  Tue Jan 16 08:57:44 2024, JG, DR, TD, Tuesday 16 January 8x
Entry  Mon Jan 15 18:51:28 2024, JG, DR, TD, Monday 15 January 
Entry  Sun Jan 14 12:31:32 2024, JM, CB, FEE positions mac addresses CARME-FEEs.jpg
Entry  Sat Jan 13 14:32:21 2024, CB, JM, Leaky manifold and cable management 20240112_111838.jpg20240112_105936.jpg20240113_183019.jpg
Entry  Sat Jan 13 14:25:05 2024, CB, JM, Bias tests with all FEEs connected Screenshot_2024-01-13_15-24-40.png20240113_150158.jpg
Entry  Thu Jan 11 19:57:20 2024, CB, JM, All FEE holders mounted 
Entry  Wed Jan 10 19:27:08 2024, CB, JM, Manifold and more bias tests 
Entry  Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left) Screenshot_2024-01-10_11-59-39.pngScreenshot_2024-01-10_12-56-36.png
Entry  Mon Jan 8 19:29:57 2024, CB, JM, Manifold repaired + fee assembly in bench  20240108_164756.jpg20240108_163218.jpg20240108_163916.jpg20240108_164010.jpg
Entry  Mon Jan 8 19:27:36 2024, CB, JM, Leak current tests overnight  Screenshot_2024-01-08_09-56-20.png
Entry  Sun Jan 7 15:38:57 2024, CB, JM, Manifolds mostly assembled + bias overnight check Screenshot_2024-01-07_16-38-26.png
Entry  Fri Jan 5 12:29:10 2024, JM, CB, Further bias tests 
Entry  Thu Jan 4 13:15:10 2024, CB, JM, Tent removed - bias test Bias.png
Entry  Wed Oct 18 16:47:36 2023, JG, CB, Power outage 
Entry  Tue Oct 17 08:43:47 2023, CB, NEG activation -2 Screenshot_2023-10-17_09-45-23.pngScreenshot_2023-10-17_11-04-09.pngScreenshot_2023-10-17_14-56-55.pngScreenshot_2023-10-17_17-58-24.pngScreenshot_2023-10-17_17-58-51.png
Entry  Mon Oct 16 08:28:02 2023, CB, NEG activation -1 Screenshot_2023-10-16_17-17-30.png
Entry  Sun Oct 15 09:35:03 2023, CB, Starting ramp down Screenshot_2023-10-15_10-35-47.pngScreenshot_2023-10-15_17-56-00.png
Entry  Tue Oct 3 08:48:36 2023, TD, Tuesday 3 October 1000007432.jpg1000007431.jpg1000007434.jpg
Entry  Mon Oct 2 08:41:43 2023, TD, Monday 2 October 6x
Entry  Sun Oct 1 10:24:50 2023, TD, Sunday 1 October 12x
Entry  Sat Sep 30 10:58:14 2023, TD, Saturday 30 September 9x
Entry  Fri Sep 29 08:54:29 2023, TD, Friday 29 September 11x
Entry  Thu Sep 28 09:19:50 2023, TD, Thursday 28 September 1000007142.jpg1000007143.jpg
Entry  Wed Sep 27 15:56:41 2023, TD, Wednesday 27 September 1000007129.jpg1000007127.jpg1000007128.jpg
Entry  Tue Sep 26 10:13:14 2023, TD, ELOTECH PID Temperature Controller R4000 manual ( German and English ) BA-Isoheat_R4000-XX-X-000-X-X_DE_V1.03.pdfR4000-XX-X-000-X-X_EN_V1.30.pdf
Entry  Tue Sep 26 08:08:42 2023, TD, Tuesday 26 September 7x
Entry  Mon Sep 25 16:33:32 2023, TD, Removed tape from heaters TC 1000007072.jpg1000007067.jpg1000007070.jpg
Entry  Fri Sep 22 12:35:46 2023, JM, Bakeout plots Heater-chamber-temps.pngpressure-chamber-temp.pngHeater-power-chamber-temp.pngHeater-power-temp.png
Entry  Wed Sep 13 15:00:39 2023, ML, Vacuum and Heater temperature plots from Grafana Screenshot_2023-09-13_15-56-34.pngScreenshot_2023-09-13_15-58-06.pngScreenshot_2023-09-13_15-59-37.pngScreenshot_2023-09-13_15-59-01.pngScreenshot_2023-09-13_15-58-31.png
Entry  Sat Sep 2 10:04:55 2023, CB, Turbo GV closed  
Entry  Fri Sep 1 08:11:40 2023, CB, NEG activation - 2 
Entry  Thu Aug 31 08:36:34 2023, CB, NEG activation  
Entry  Wed Aug 30 10:28:36 2023, CB, Preparing for pumps on 
Entry  Wed Aug 30 09:33:13 2023, CB, OG, NEG cables repaired  20230830_102519.jpg20230830_102514.jpg
Entry  Mon Aug 14 09:22:56 2023, JM, Bakeout 20230814_150430.jpg20230815_094400.jpgHeater-power.pngHeater-ITC-temp.pngPressure-ITC-temp.png
Entry  Sat Aug 12 15:06:51 2023, JM, Initial bakeout tests 20230813_114600.jpg20230813_132550.jpg20230813_170829.jpg20230813_205613.jpg20230813_210238.jpg
Entry  Sat Aug 12 11:57:51 2023, JM, Updated thermocouple positions and heater channel layouts 6x
Entry  Thu Aug 10 07:51:43 2023, JM, Baking tent and heater testing 8x
Entry  Thu Jul 27 09:43:56 2023, RSS, Thermocouples connected -2 IMG_9920.jpgIMG_9919.jpg
Entry  Wed Jul 26 08:28:09 2023, RSS, Building tent IMG_9897.jpgIMG_9899.jpgIMG_9901.jpgIMG_9902.jpg
Entry  Tue Jul 25 09:12:15 2023, RSS, Building tent BD01C0C8-5181-49B8-8751-AD4C99A459CC.jpeg7B3836F1-8A7E-491B-AFDC-46033BF84760.jpeg
Entry  Mon Jul 24 10:40:14 2023, RSS, TD, Pump down continues vacplot.pngvacplot24.png
Entry  Sun Jul 23 10:13:48 2023, RSS, TD, Building tent DBE0DA2E-2F69-469C-B645-3E33E3D82138.jpeg857185AC-3571-41E9-88AE-9F624445135B.jpegE69ED1D1-444E-478A-A3B4-481023B4024D.jpeg610048A3-25F5-459C-9EF1-83EFEFDE51C9.jpeg
Entry  Sat Jul 22 09:19:59 2023, RSS, TD, Thermocouples connected 10x
Entry  Fri Jul 21 08:21:54 2023, TD, RSS, Baking tent manual CARME-baking-guide_(1).pdf
Entry  Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
Entry  Wed Jul 19 08:17:26 2023, TD, Leak testing 
Entry  Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector. 
Entry  Mon Jul 17 08:45:11 2023, TD, Closing CARME again 20230717_093106.jpg
Entry  Fri Jul 14 08:27:17 2023, TD, CARME open - inspecting seal 
Entry  Thu Jul 13 08:46:44 2023, TD, Replacing wire seal 20230713_135351.jpg20230713_135416.jpg
Entry  Thu Jul 13 00:12:45 2023, JM, CB, CARME closed Bias110723.pngfullyin.jpgfullyin-measured.jpg
Entry  Thu Jul 13 00:12:19 2023, JM, CB, Bellow replaced 20230705_164523.jpg
Entry  Thu Jul 6 15:26:39 2023, JM, Leak update pumping.png
Entry  Wed Jul 5 19:27:13 2023, JM, Pump down and leak test pumping_1.pngpumping-zoom.pngsignal-2023-07-05-15-13-30-512.jpg
Entry  Tue Jul 4 17:08:08 2023, JM, Leak test and venting 20230704_135455.jpg20230704_174524.jpg
Entry  Mon Jun 26 14:49:05 2023, JM, TD, CARME vented 
Entry  Sun Jun 25 14:30:06 2023, JM, TD, Motors bias test 
Entry  Sun Jun 25 10:08:30 2023, JM, TD, Pump-down  Figure_1.png20230625_120640.jpg20230625_120648.jpgpump-down.png
Entry  Sun Jun 25 09:41:06 2023, JM, TD, Normal turbo-pump operation 6x
Entry  Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping  23-06-23-VI.png24-06-23-VI.png
Entry  Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg
Entry  Wed Jun 21 18:47:36 2023, JM, TD, Closing CARME 20230621_104911.jpg20230621_104918.jpg20230621_110010.jpg21-06-23-VI.png
Entry  Fri May 26 09:08:06 2023, JM, CB, Detector movement  20230525_135756.jpgdetector-movement-in.mp4
Entry  Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png
Entry  Wed May 24 09:54:56 2023, JM, CB, Maximum detector positions 9x
Entry  Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4
Entry  Mon May 15 07:34:22 2023, TD, Monday 15 May 
Entry  Sun May 14 11:55:12 2023, TD, Sunday 14 May 
Entry  Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May 
Entry  Fri May 12 16:24:20 2023, RSS, TD, V-I test 8x
Entry  Thu May 11 21:22:54 2023, RSS, TD, V-I test 7x
Entry  Wed May 10 19:06:18 2023, RSS, TD, V-I test detector_1.pngdetector_2.pngdetector_3.pngdetector_4.png
Entry  Tue May 2 15:02:09 2023, CB, JM, All detectors and harnesses mounted  20230502_153410.jpg20230502_153503.jpg20230502_153509.jpg20230502_153511.jpg
Entry  Mon May 1 18:21:18 2023, CB, JM, All detectors mounted  20230501_191533.jpg20230501_191511.jpg20230501_145740.jpg
Entry  Mon May 1 08:26:09 2023, CB, JM, Left hand detectors remounted  
Entry  Sun Apr 30 10:01:39 2023, CB, JM, Left hand detectors unmounted  26x
Entry  Sat Apr 29 10:12:58 2023, CB, JM, CARME opened 8x
Entry  Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open  20230427_123456.jpg20230427_161602.jpg
Entry  Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  20230426_152121.jpg20230426_162619.jpg20230426_162627.jpg
Entry  Tue Apr 25 13:22:19 2023, JM, CARME venting  20230425_134119.jpg20230425_132944.jpg
Entry  Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount 20230424_155635.jpg20230424_155607.jpg20230424_150526.jpg
Entry  Wed Mar 22 16:33:32 2023, TD, NIM WR source 8x
Entry  Wed Jan 18 13:32:36 2023, PJCS, MACB settings with either Emulator or VETAR macb_apr20.jedmacb_apr20.vhdzybo.jpgMACB.jpg
Entry  Thu Dec 8 14:41:19 2022, PJCS, Results of tests on AIDA PSU in DL T9 8x
Entry  Thu Dec 1 08:56:59 2022, AR TD, Thursday 1 December  11x
Entry  Wed Nov 30 08:52:59 2022, AR TD, Wednesday 30 November 26x
Entry  Tue Nov 29 14:37:56 2022, AR TD, Tuesday 29 November 22x
Entry  Mon Nov 28 13:14:33 2022, AR TD, Monday 28 November 12x
Entry  Mon Oct 3 16:03:33 2022, OH, CB, TTT14 Photos 
Entry  Sun Aug 14 06:50:58 2022, TD, JM, Sunday 14 August 10x
Entry  Sat Aug 13 10:23:59 2022, JM, TD, Noise tests pt3 and pulser walk 15x
Entry  Fri Aug 12 15:12:37 2022, JM, TD, CARME measurements 9x
Entry  Fri Aug 12 09:06:57 2022, TD, JM, Noise tests pt2 30x
Entry  Thu Aug 11 09:25:13 2022, JM, TD, Noise tests 14x
Entry  Wed Aug 10 10:33:03 2022, TD, ML, JM, NP, Meeting at YR09 to discuss options for CARME operations to February 2022 20220810_111638.jpg20220810_095036.jpg20220810_095150.jpg20220810_095159.jpg
Entry  Wed Aug 10 10:30:04 2022, TD, JM, Wednesday 10 August 4.PNG3.PNG2.png1.png
Entry  Tue Aug 9 16:07:33 2022, JM, TD, Anydesk setup command line 
Entry  Tue Aug 9 13:44:16 2022, TD, JM, Tuesday 9 August Capture_1.PNG20220809_163450.jpg20220809_135840.jpg20220809_135833.jpg20220809_135801.jpg
Entry  Thu Mar 3 15:14:21 2022, JM, OH, CARME packing up 
Entry  Wed Mar 2 22:29:48 2022, CB, SD, Last shift with beam 9x
Entry  Wed Mar 2 21:16:06 2022, JM, PM, Current status 
Entry  Wed Mar 2 19:25:25 2022, JM, PM, Current status 10x
Entry  Wed Mar 2 17:21:35 2022, JM, PM, Current status 8x
Entry  Wed Mar 2 14:15:16 2022, JM, PM, Current status 6x
Entry  Wed Mar 2 09:38:50 2022, Spillmann, Uwe, ion source restarted 
Entry  Wed Mar 2 06:00:49 2022, Spillmann, Uwe, waiting 
Entry  Wed Mar 2 03:40:40 2022, David, George, Temperature Cycle 
Entry  Wed Mar 2 01:24:48 2022, David, George, Ion Source Update 
Entry  Tue Mar 1 23:43:15 2022, David, George, Beam Intensity Drop 
Entry  Tue Mar 1 23:30:04 2022, David, George, Current status 2022-03-02_00-39-47xytotal.png2022-03-02_00-39-20exRate.png2022-03-02_00-38-44extotal.png
Entry  Tue Mar 1 22:10:26 2022, David, George, Current status 2022-03-01_23-14-43aida.png2022-03-01_23-13-57exrate.png2022-03-01_23-13-40xyto.png2022-03-01_23-13-10extot.png
Entry  Tue Mar 1 21:34:06 2022, PM, LV, check 14x
Entry  Tue Mar 1 20:41:28 2022, PM, LV, check 14x
Entry  Tue Mar 1 19:41:24 2022, PM, LV, target temperature walkthrough 
Entry  Tue Mar 1 19:40:28 2022, PM, LV, check 12x
Entry  Tue Mar 1 18:43:41 2022, PM, LV, check 14x
Entry  Tue Mar 1 17:36:04 2022, PM, LV, check 14x
Entry  Tue Mar 1 16:57:34 2022, CB, LV, PMH, New run 
Entry  Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
Entry  Tue Mar 1 12:58:32 2022, CB, MS, SS, ML, Synced pneumatic motion 
Entry  Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
Entry  Tue Mar 1 10:43:36 2022, MS, SHB, check  11x
Entry  Tue Mar 1 10:35:59 2022, MS, SHB, next run on tape server tab 
Entry  Tue Mar 1 08:02:26 2022, SHB, MS, check 11x
Entry  Tue Mar 1 06:35:42 2022, SHB, MS, check 11x
Entry  Tue Mar 1 06:04:04 2022, SHB, MS, positions 
Entry  Tue Mar 1 05:23:02 2022, JM, EM, Current status  2022-03-01_06-42-53-ExRate.png
Entry  Tue Mar 1 04:07:31 2022, JM, EM, Temperature cycle 
Entry  Tue Mar 1 03:34:28 2022, JM, EM, Current status 7x
Entry  Tue Mar 1 03:19:50 2022, JM, EM, Temperature Cycle 
Entry  Tue Mar 1 02:15:29 2022, JM, EM, Current status 6x
Entry  Mon Feb 28 23:54:02 2022, JM, EM, Current Status, Temperature cycle 2022-03-01_00-57-44-Exrate.png2022-03-01_00-58-41-ExTotal.png2022-03-01_00-58-14-EyTotal.png
Entry  Mon Feb 28 22:34:51 2022, JM, EM, Current status 2022-02-28_23-40-14-xyTotal.png2022-02-28_23-39-56-Exrate.png2022-02-28_23-39-26-goodEvents.png2022-02-28_23-38-58-correlation8.png2022-02-28_23-38-31-ADCitems.png
Entry  Mon Feb 28 14:47:52 2022, CB, TD, Monday 28 February 15:00-23:00 17x
Entry  Mon Feb 28 14:42:48 2022, CB, TD, Cryostat set to 115K 
Entry  Mon Feb 28 14:38:15 2022, TD, NewMerger statistics 37x
Entry  Mon Feb 28 13:56:02 2022, JG, CB, Temperature cycle to 125K 
Entry  Mon Feb 28 13:16:39 2022, JG, AK, CB, Current status 8x
Entry  Mon Feb 28 11:57:22 2022, JG, AK, CB, Current status 8x
Entry  Mon Feb 28 10:55:48 2022, JG, US, Current status 8x
Entry  Mon Feb 28 09:31:48 2022, JG, AK, CB, Current status 8x
Entry  Mon Feb 28 08:36:35 2022, JG, AK, CB, Current status 8x
Entry  Mon Feb 28 07:35:51 2022, JG, current logger crashed Screenshot_from_2022-02-28_08-38-35.png
Entry  Mon Feb 28 07:31:25 2022, JG, AK, Current status 8x
Entry  Mon Feb 28 06:12:58 2022, JG, AK, US, Current status 8x
Entry  Mon Feb 28 05:04:47 2022, JM, OF, Temperature cycle to 125K 2022-02-28_06-30-39-Exrate.png
Entry  Mon Feb 28 04:14:26 2022, JM, OF, Current status 9x
Entry  Mon Feb 28 03:16:37 2022, JM, OF, Current status 6x
Entry  Mon Feb 28 02:16:00 2022, JM, OF, Current status 6x
Entry  Mon Feb 28 01:16:02 2022, JM, OF, Temperature decrease 115K to 110K 20220228_021455.jpg20220228_023832.jpg20220228_025416.jpg
Entry  Mon Feb 28 00:24:05 2022, JM, OF, Current status 7x
Entry  Sun Feb 27 23:17:33 2022, JM, OF, Current status 10x
Entry  Sun Feb 27 22:03:51 2022, JM, OF, Current Status 9x
Entry  Sun Feb 27 20:38:06 2022, Rui-Jiu Chen, Yuri, Current status 13x
Entry  Sun Feb 27 20:19:06 2022, Rui-Jiu Chen, Yuri, open the valves of target. 
Entry  Sun Feb 27 19:01:02 2022, Rui-Jiu Chen, Yuri, Current status 13x
Entry  Sun Feb 27 18:46:42 2022, Rui-Jiu Chen, Yuri, Change target temperature 
Entry  Sun Feb 27 17:00:45 2022, Rui-Jiu Chen, Yuri, current status 13x
Entry  Sun Feb 27 16:30:35 2022, Rui-Jiu Chen, Yuri, Change target temperature again 
Entry  Sun Feb 27 15:41:33 2022, Rui-Jiu Chen, Yuri, current status 13x
Entry  Sun Feb 27 15:02:16 2022, Rui-Jiu Chen, Yuri, Change target temperature 14x
Entry  Sun Feb 27 14:05:30 2022, Rui-Jiu, Ragan, Current status 14x
Entry  Sun Feb 27 13:34:24 2022, RSS TD, Current status 
Entry  Sun Feb 27 12:49:44 2022, TD RSS, Sunday 27 February 07:00-15:00 6x
Entry  Sun Feb 27 12:00:13 2022, RSS TD, Current status 13-xy-2022-02-27_13-01-36.png13-yrate-2022-02-27_13-01-06.png13-xrate-Screenshot_from_2022-02-27_13-00-50.png
Entry  Sun Feb 27 11:00:08 2022, RSS TD, Current status 12-xy-2022-02-27_12-16-19.png12-yrate-2022-02-27_12-15-42.png12-xrate-2022-02-27_12-15-03.png
Entry  Sun Feb 27 10:00:07 2022, RSS TD, Current status 11-xy-2022-02-27_11-01-22.png11-ey-rate2022-02-27_11-00-46.png11-ex-rate-2022-02-27_11-00-27.png
Entry  Sun Feb 27 09:00:09 2022, RSS TD, Current status 7x
Entry  Sun Feb 27 08:00:23 2022, RSS TD, Current status 9-xy-2022-02-27_09-00-57.png9-ey-2022-02-27_09-00-03.png9-ex-2022-02-27_08-59-48.png
Entry  Sun Feb 27 06:58:51 2022, RSS TD, Current status 8-xy-2022-02-27_08-10-15.png8-ey-2022-02-27_08-09-46.png8-ex-2022-02-27_08-09-29.pngScreenshot_from_2022-02-27_07-16-30.png
Entry  Sun Feb 27 06:23:42 2022, RSS TD, Current status 6x
Entry  Sun Feb 27 05:45:53 2022, David, Pierre-Michell, Current status 2022-02-27_06-50-09exrat.png2022-02-27_06-48-23eytot.png2022-02-27_06-48-05extot.png2022-02-27_06-47-47xytot.png
Entry  Sun Feb 27 04:54:46 2022, David, Pierre-Michell, Current status 2022-02-27_05-56-59exra.png2022-02-27_05-56-31exto.png2022-02-27_05-56-13xytot.png
Entry  Sun Feb 27 03:49:36 2022, David, Pierre-Michell, Current status 2022-02-27_04-53-12xytot.png2022-02-27_04-52-51exrst.png2022-02-27_04-52-31extot.png
Entry  Sun Feb 27 02:38:52 2022, David, Pierre-Michell, Current status 2022-02-27_03-43-36aida.png2022-02-27_03-42-55xyto.png2022-02-27_03-42-14exra.png2022-02-27_03-41-49extot.png
Entry  Sun Feb 27 01:46:56 2022, David, Pierre-Michell, Current status 2022-02-27_02-50-15exrate.png2022-02-27_02-49-47extot.png2022-02-27_02-49-28xytot.png
Entry  Sun Feb 27 00:53:24 2022, David, Pierre-Michell, Current status 7x
Entry  Sun Feb 27 00:07:15 2022, David, Pierre-Michell, No beam, valve closed 
Entry  Sat Feb 26 23:20:13 2022, David, Pierre-Michell, Update status 7x
Entry  Sat Feb 26 22:22:27 2022, David, Pierre-Michell, Starting to take data 11x
Entry  Sat Feb 26 04:36:38 2022, RSS TD, Saturday 26 February 07:00-15:00 27x
Entry  Fri Feb 25 19:20:22 2022, MS, PJW, check 11x
Entry  Fri Feb 25 17:48:22 2022, MS, PJW, check 11x
Entry  Fri Feb 25 16:01:04 2022, MS, PJW, check 7x
Entry  Fri Feb 25 15:38:40 2022, JM, CB, PJW, Run 55, 56, 59 root histograms 6x
Entry  Fri Feb 25 11:20:30 2022, CB, Pressure and temperature data saved 
Entry  Fri Feb 25 09:58:08 2022, GHC, CB, ML, EM, Current status 
Entry  Fri Feb 25 08:14:47 2022, George, Esther, Current status 
Entry  Fri Feb 25 06:57:09 2022, George, Esther, Current status 2022-02-25_08-03-21leakage.png
Entry  Fri Feb 25 06:28:12 2022, George, Esther, Current Status 2022-02-25_07-33-44exRate.png2022-02-25_07-35-11xyTotal.png
Entry  Fri Feb 25 05:04:16 2022, Rui-Jiu Chen, Alex, check 14x
Entry  Fri Feb 25 03:20:29 2022, Rui-Jiu Chen, Alex, Current status 
Entry  Fri Feb 25 03:01:11 2022, Rui-Jiu Chen, Alex, check 14x
Entry  Fri Feb 25 01:12:49 2022, Rui-Jiu Chen, Alex , Check  13x
Entry  Fri Feb 25 00:00:40 2022, Rui-Jiu Chen, Alex, Check 14x
Entry  Thu Feb 24 23:15:25 2022, Rui-Jiu Chen, Alex, Problems with ion souce. 
Entry  Thu Feb 24 22:45:08 2022, Jordan, George, Rui-Jiu Chen, check 14x
Entry  Thu Feb 24 14:31:25 2022, JM, ML, CN, Beam Tuning Run 76 6x
Entry  Thu Feb 24 09:43:16 2022, JG, MS, check 13x
Entry  Thu Feb 24 08:30:36 2022, JG, MS, AIDA5 calibration test failed - solved Screenshot_from_2022-02-24_09-09-36.pngScreenshot_from_2022-02-24_09-29-24.png
Entry  Thu Feb 24 08:15:23 2022, JG, MS, check 13x
Entry  Thu Feb 24 07:25:53 2022, OH (Remote), Recover of system after crash 
Entry  Thu Feb 24 05:09:47 2022, CB, PE, EM, Inlet valve at target closed + problems with turbopump 
Entry  Thu Feb 24 04:17:35 2022, CB, TD (remotely), MIDAS DAQ no longer working Bad_Time_2022-02-24_04-34-12.pngBadTime_WRTime_2022-02-24_04-34-53.png
Entry  Wed Feb 23 22:29:50 2022, PE, EM, CB (remotely), check - 23:30 
Entry  Wed Feb 23 21:27:29 2022, TD, CN, check  11x
Entry  Wed Feb 23 20:52:56 2022, CN, TD, System wide checks 11x
Entry  Wed Feb 23 20:06:43 2022, TD CN, E141 kinematics E141_kinematics.txt
Entry  Wed Feb 23 19:22:55 2022, CN, TD, check 10x
Entry  Wed Feb 23 18:58:12 2022, TD CN, Wednesday 23 February 15.00-23.00 shift 6x
Entry  Wed Feb 23 16:57:35 2022, CB, CN, Optimising motor motion 
Entry  Wed Feb 23 10:56:06 2022, Laszlo, Thanassis, Current status 10x
Entry  Wed Feb 23 09:50:19 2022, Laszlo, Thanassis, Moving detector in 
Entry  Wed Feb 23 08:58:30 2022, Laszlo, Thanassis, Current status 10x
Entry  Wed Feb 23 07:58:38 2022, Laszlo, Thanassis, Current status 10x
Entry  Wed Feb 23 06:58:19 2022, Laszlo, Thanassis, Current status 11x
Entry  Wed Feb 23 06:00:25 2022, Jordan, George, Current status 2022-02-23_07-06-36exRate.png2022-02-23_07-06-11exTotal.png2022-02-23_07-05-42xyTotal.png
Entry  Wed Feb 23 04:55:48 2022, Jordan, George, Current status 2022-02-23_06-00-29xyTotal.png2022-02-23_05-59-36exRate.png2022-02-23_05-59-05exTotal.png
Entry  Wed Feb 23 03:52:13 2022, Jordan, George, Current status 2022-02-23_04-58-19-XYtotal.png2022-02-23_04-57-17-Ex-total-hist.png2022-02-23_04-56-36-Ex-rate-hist.pngpressures-1hour.jpgpressure-6hours.jpg
Entry  Wed Feb 23 02:52:09 2022, Jordan, George, Current status 2022-02-23_03-58-03xyTotal.png2022-02-23_03-57-34exTotal.png2022-02-23_03-56-52exRate.png
Entry  Wed Feb 23 01:56:59 2022, Jordan, George, Current status 2022-02-23_03-01-54xyTotal.png2022-02-23_03-00-54exTotal.png2022-02-23_03-00-11exRate.png2022-02-23_03-10-45-aida1-1*L.png
Entry  Wed Feb 23 00:54:17 2022, Jordan, George, Current status 2022-02-23_02-02-53extotal.png2022-02-23_02-02-00lowEnergyXYtot.png2022-02-23_01-59-14exRate.png
Entry  Tue Feb 22 21:57:13 2022, George, Jordan, Current status 2022-02-22_23-53-38-lowenergy-xytotal.png2022-02-22_23-50-45-Ex-rate-hist.png2022-02-22_23-49-20-Ex-total-hist.png20220223_002946.jpg
Entry  Tue Feb 22 21:09:39 2022, David, Yuri, Current status 2022-02-22_22-12-55xytotal.png2022-02-22_22-12-21exrate.png2022-02-22_22-12-00extotal.png
Entry  Tue Feb 22 20:08:40 2022, David, Yuri, Current status 2022-02-22_21-14-23exrate.png2022-02-22_21-14-01xytotal.png2022-02-22_21-13-11extotal.png
Entry  Tue Feb 22 19:28:35 2022, David, Yuri, vacuum 
Entry  Tue Feb 22 19:11:18 2022, David, Current status 2022-02-22_20-16-26eyrate.png2022-02-22_20-15-34.eytotal.png
Entry  Tue Feb 22 18:23:02 2022, David. Yury, Vacuum problem 
Entry  Tue Feb 22 17:32:38 2022, David, Current status 12x
Entry  Tue Feb 22 16:09:08 2022, David, Yury, Current status 12x
Entry  Tue Feb 22 14:32:04 2022, David, Yury, Current status 12x
Entry  Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run 
Entry  Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54  9x
Entry  Tue Feb 22 10:30:00 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x
Entry  Tue Feb 22 10:06:50 2022, RSS, OF, ML, PMT channel 
Entry  Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14 R54_14_analyser.txt
Entry  Tue Feb 22 08:31:25 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x
Entry  Tue Feb 22 07:27:28 2022, RSS, OF, ML, Beam ON, Target ON Run 54  10x
Entry  Tue Feb 22 06:30:09 2022, RSS, OF, Beam ON, Target ON Run 54  10x
Entry  Tue Feb 22 05:47:18 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - 2 events at 10MeV! 11x
Entry  Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  11x
Entry  Tue Feb 22 04:09:28 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - first event at 10MeV ! 11x
Entry  Tue Feb 22 03:05:06 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  9x
Entry  Tue Feb 22 02:02:11 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  10x
Entry  Tue Feb 22 00:32:35 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png
Entry  Mon Feb 21 21:04:08 2022, SHB, JM, CB, OH (remotely), Schottky RF view from the beam inside pio-2022.02.21.21.54.46.895.PNG
Entry  Mon Feb 21 20:56:51 2022, SHB, JM, CB, OH (remotely), DAQ connection for ion current cry.jpg
Entry  Mon Feb 21 18:03:58 2022, SHB, JM, CB, OH (remotely), Info: signals on ion intensity for experiment 
Entry  Mon Feb 21 17:26:19 2022, JM, CB, SHB, OH (remotely), Beam ON run 53 9x
Entry  Mon Feb 21 12:10:47 2022, RSS, JG, Alpha background run50 220221_1506_aida03_1*W.png
Entry  Mon Feb 21 10:59:48 2022, RSS, JG, Alpha background run50 
Entry  Mon Feb 21 09:07:37 2022, RSS, JG, Alpha background run50 
Entry  Mon Feb 21 08:05:45 2022, RSS, JG, Alpha background run50 
Entry  Sun Feb 20 22:04:21 2022, JM, CB, Alpha Background run 50  
Entry  Sat Feb 19 20:08:43 2022, JM, CB, Beam ON run 49 6x
Entry  Sat Feb 19 14:51:58 2022, JM, CB, Burst high energy noise 2022-02-19_15-50-50-aida1-4-stat-logscale.png2022-02-19_15-47-13-aida1-2*H.png2022-02-19_15-49-48-aida2-1*H.png2022-02-20_14-01-40-aida1-2*H.png2022-02-20_14-02-55-aida1-1*H.png
Entry  Fri Feb 18 20:31:33 2022, JM, CB, Alpha Background run 48 2022-02-19_14-45-25-leage-current.png
Entry  Fri Feb 18 13:03:02 2022, RSS, ML, CB, Alpha background run46 11x
Entry  Fri Feb 18 11:07:52 2022, RSS, ML, CB, Alpha background run46 11x
Entry  Fri Feb 18 08:58:08 2022, RSS, ML, CB, Alpha background run46 11x
Entry  Thu Feb 17 18:19:16 2022, JM, CB, SD, Alpha Background run 46 2022-02-17_22-41-45-leakageCurrent.png2022-02-17_22-51-07-aida1-3*L.png2022-02-17_22-54-06-XYTotal.png2022-02-17_22-56-38-ExHist.png
Entry  Thu Feb 17 16:26:27 2022, JM, CB, SD, Gauges OFF, Pulser Movement tests 7x
Entry  Thu Feb 17 15:09:40 2022, JM,CB,SD, Alpha background run44 8x
Entry  Thu Feb 17 13:12:19 2022, RSS, AG, Alpha background run43 11x
Entry  Thu Feb 17 08:31:07 2022, RSS, AG, Alpha background run43 11x
Entry  Wed Feb 16 21:41:11 2022, JM, Run 43 Alpha Background 8x
Entry  Wed Feb 16 21:27:31 2022, JM, Cryring signals, Pulser tests, Waveforms  11x
Entry  Wed Feb 16 15:27:53 2022, EM, JM, Run 41 Pulser tests 11x
Entry  Wed Feb 16 12:43:05 2022, TP, RSS, Alpha background run40  11x
Entry  Wed Feb 16 08:27:27 2022, TP, RSS, Alpha background run40 11x
Entry  Tue Feb 15 21:28:14 2022, JM, Noisy Channels 2022-02-15_22-17-51-aida1-3*L.png2022-02-15_22-23-12-aida1-4-stat-log.png
Entry  Tue Feb 15 14:59:37 2022, JM, CB, RJC, Pulser walkthrough 11x
Entry  Tue Feb 15 10:46:37 2022, RSS, LV, CB, Alpha background run37 10x
Entry  Mon Feb 14 09:56:39 2022, CB, Shifters instructions 2022 10x
Entry  Sun Feb 13 21:28:35 2022, JM, CB, Alpha background Run 32, 35 6x
Entry  Sat Feb 12 19:48:38 2022, JM, CB, Grounding and movement tests 11x
Entry  Thu Feb 10 09:12:41 2022, OH, CB, US, Hourly motor movement 220209_1014_leakage.png220210_1443_BiasFeeOn.png
Entry  Wed Feb 9 08:01:41 2022, OH, CB, G-HC, Results from no beam overnight 220209_0852_leakage.png220209_0900_leakage_shake.png
Entry  Tue Feb 8 08:13:53 2022, OH, CB, DF, Hopefully effect of beam tuning on detectors 9x
Entry  Mon Feb 7 08:09:50 2022, OH, CB and PH, CARME Server setup and initial tests 
Entry  Fri Feb 4 12:49:54 2022, TD, JM, Grounding Tests and current status  10x
Entry  Fri Feb 4 09:53:48 2022, JM, TD, OH (remotely), Alpha spectra overnight 8x
Entry  Thu Feb 3 22:05:33 2022, JM, TD, OH(remotely), Bias update and grounding 
Entry  Wed Feb 2 21:53:32 2022, JM, TD, Detector Bias 20220202_110757.jpg20220202_193636.jpg20220202_193651.jpgmotion.png
Entry  Tue Feb 1 14:43:20 2022, JM, TD, Detector Bias, FEEs 22-02-01_15-03-56_aida03pulserADCspectra.png2022-02-01_15-14-07_aida03_pulser_DAQserver.png2022-02-01_15-22-23aida03_waveforms_pulser.png2022-02-01_15-28-45aida03_waveforms_pulser2.png2022-02-01_15-54-57rates_aidaALL.png
Entry  Mon Jan 31 08:58:38 2022, OH, TD, JM, centos server configuration 8x
Entry  Sat Jan 29 11:04:07 2022, JM, OH, Grounding and Pulser Silkscreen_Top.pdf
Entry  Thu Jan 27 21:33:40 2022, JM, OH, AIDA config files, remote access, motor test 20220127_101513.jpg
Entry  Thu Jan 27 15:24:02 2022, OH, JM, Access to Motors PI 
Entry  Thu Jan 27 15:19:18 2022, OH, JM, Enabling internet access on the carme-gsi server 
Entry  Thu Jan 27 14:04:34 2022, OH, JM, Remote access to CARME server 
Entry  Wed Jan 26 19:16:18 2022, JM, OH, Water cooling, FEE MAC address 20220126_162435.jpg20220126_162448.jpg20220126-142809.jpg
Entry  Sat Jan 15 15:38:25 2022, JM, OH, TD, FEE installation, cable management 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg
Entry  Sat Jan 15 11:28:10 2022, JM, Inventory 20220115_162649.jpg20220115_162712.jpg
Entry  Fri Jan 14 10:00:18 2022, TD, OH, JM, Friday 14 January 
Entry  Thu Jan 13 10:33:24 2022, JM, OH, TD, Adaptor Board misallignment 20220112_160951.jpg20220113_145105.jpg20220113_145147.jpg
Entry  Wed Jan 12 20:07:20 2022, JM, OH, TD, FEE holder installation 10x
Entry  Tue Jan 11 12:45:15 2022, TD, JM, OH, Coolant manifold installation + detector pin tests 20220111_113628.jpg20220111_113613.jpg20220111_111428.jpg
Entry  Mon Jan 10 20:52:53 2022, JM, TD, OH, Baking tent removed, VI tests 20220110_175547.jpg20220110_175811.jpgvi-curve.png
Entry  Tue Dec 7 09:39:59 2021, CB (remotely), Gate valves closed 
Entry  Tue Nov 30 10:49:43 2021, CB (remotely) GV, Gate valve opened vacplot24.png
Entry  Sun Nov 28 15:57:45 2021, CB (remotely), Nov 2021 temperatures 211128164424_temperatures.zip
Entry  Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave 
Entry  Wed Nov 24 12:08:08 2021, CB + ML OG, Ion pumps on vacplot24.pngvacplot.pngCARMEtemps.png
Entry  Tue Nov 23 08:49:33 2021, CB + ML, NEG activation completed vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png
Entry  Mon Nov 22 08:06:01 2021, RSS CB + ML, NEG activation starts IMG_5674.JPGCARMEtemps.pngvacplot.png
Entry  Fri Nov 19 12:03:51 2021, CB RSS, Conditionings NEGs CARMEtemps.pngvacplot.png
Entry  Thu Nov 18 13:50:51 2021, CB RSS, Thermocamera images 14x
Entry  Thu Nov 18 12:29:50 2021, CB RSS, Conditioning D2000 NEGs vacplot.pngCARMEtemps.png
Entry  Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
Entry  Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues CARMEtemps.png20211116_132048.jpg20211116_155138.jpg20211116_155857.jpg
Entry  Fri Nov 12 08:54:11 2021, RSS ML + CB (remotely) NK AK NP, First CARME baking attempt Capture.PNG200W_heaters.svg40W_heater.svg
Entry  Thu Nov 11 11:44:58 2021, RSS + ML OG + CB (remotely), CARME baking started IMG_5535.JPGIMG_5537.JPGIMG_5531.JPGIMG_5534.JPGIMG_5539.JPG
    Reply  Thu Nov 11 14:01:00 2021, AK, ML, Heater channel layouts 2020.11.05_Cryring-YR09-baking-layout.pdf
Entry  Wed Nov 10 18:38:16 2021, RSS TD + ML OG AK NK, CARME wrapped in heating tape IMG_5514(1).JPGIMG_5517(1).JPGIMG_5518.JPGIMG_5520.JPGIMG_5521(1).JPG
Entry  Wed Nov 10 18:24:12 2021, RSS, Thermocouple labelling labeling.JPG.svgLabelling.svgIMG_5512.JPG
Entry  Wed Nov 10 14:41:12 2021, TD RSS + CB (remotely), Wrapping CARME in heating tape 
Entry  Tue Nov 9 15:03:29 2021, RSS + OG, Burnt cables issues 7x
Entry  Mon Nov 8 17:19:02 2021, RSS + OG, Neg and ion cables connected IMG_5480.JPGIMG_5483.JPGIMG_5488.JPG
Entry  Sat Nov 6 14:21:10 2021, CB RSS, Preparation for bakeout tent mounting + to do for next week 
Entry  Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg
Entry  Wed Nov 3 16:39:01 2021, CB RSS + NP DR NK ML, Interaction chamber lifted in place 20211103_161553.jpg20211103_161813.jpg20211103_175457.jpg
Entry  Wed Nov 3 11:18:11 2021, CB RSS + DR NK ML, Leak closed 20211103_110244.jpg20211103_110414.jpg
Entry  Tue Nov 2 12:45:36 2021, CB + DR NK, Issues with CARME feet 20211102_134446.jpg
Entry  Mon Nov 1 14:48:16 2021, CB + ML DR, CARME opened 
Entry  Sun Oct 31 13:55:13 2021, CB OH, Leak tests 20211031_155820.jpg
Entry  Sun Oct 31 08:05:15 2021, CB OH + DR ML, CARME closed again + feedthroughs labeled 11x
Entry  Sun Oct 31 07:55:39 2021, CB JM + OH, Strain relief mounted 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg
Entry  Sun Oct 31 07:41:20 2021, CB JM + RSS, Wires plugged in DSSDs  8x
Entry  Sun Oct 31 07:29:17 2021, CB JM + RSS OG, Detectors mounted on plate in CARME 8x
Entry  Sun Oct 31 07:21:09 2021, CB JM RSS, Detectors arrived in GSI 6x
Entry  Fri Oct 29 15:09:27 2021, CB JM + RSS OG DR, Preparation to mount new DSSDs 6x
Entry  Sat Oct 23 12:58:11 2021, JM, GSI vacuum and bakeout testing summary GSI_fullpumpdown.pngGSI_pumping.pngBakeout-elog.pngfit-elog.pngActivation-elog.png
Entry  Fri Oct 22 13:22:48 2021, TD, CARME FEE64 adaptor PCB 10x
Entry  Fri Oct 22 13:11:26 2021, TD, MSL type TTT14 assembly drawings & pin assignments C-3434.pdfC-3517.pdf
Entry  Thu Oct 21 20:26:44 2021, JM TD, Thermocouple and Connector cables 10x
Entry  Mon Oct 18 16:25:11 2021, JM RSS TD, NEG rotation + cable removals Screenshot_20211018-174141_Signal.jpg20211018_111130.jpg20211018_100015.jpg
Entry  Sun Oct 17 11:48:48 2021, TD RSS, Sunday 17 October 14x
Entry  Sat Oct 16 17:25:47 2021, RSS TD, Broken detectors IMG_5098.JPGIMG_5097.JPGIMG_5096.JPGIMG_5106.JPGIMG_5105.JPG
Entry  Fri Oct 15 19:37:12 2021, RSS TD + DR, Friday 15 October 8x
Entry  Thu Oct 14 15:54:47 2021, TD RSS, Thursday 14 October IMG_5056.JPG.jpgIMG_5053.JPG
Entry  Wed Oct 13 15:28:22 2021, RSS TD + OG, Split funnels 7x
Entry  Wed Oct 13 15:16:12 2021, TD, Orientation of 2x 78 way D connector feedthroughs 20211013_152518.jpg20211013_152529.jpg20211013_152549.jpg20211013_152606.jpg
Entry  Wed Oct 13 12:06:09 2021, RSS TD, Flanges cleaned 12x
Entry  Wed Oct 13 11:59:23 2021, TD, [How to] Open COF600 copper wire seals 20211013_103806.jpg20211013_103800.jpg
Entry  Tue Oct 12 13:54:21 2021, RSS TD + OD DR, CARME opened 20x
Entry  Tue Oct 12 09:22:37 2021, RSS TD + OG DR, Motors problem solved IMG_4971.JPGIMG_4970.JPG
Entry  Mon Oct 11 11:24:16 2021, RSS TD ML, Valve support and cable labeling IMG_4962.JPGIMG_4969.JPG.svgIMG_4968.JPG.svg
Entry  Sat Oct 9 09:47:33 2021, CB, To do list for next week Capture.PNG
Entry  Sat Oct 9 09:44:36 2021, CB RSS, Heaters removed + motors tests 
Entry  Fri Oct 8 17:56:35 2021, CB RSS, Motors test 20211008_184731.jpg20211008_184731.jpg
Entry  Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV 
Entry  Wed Oct 6 15:36:14 2021, CB RSS, Neg activation tests -3 
Entry  Wed Oct 6 09:47:30 2021, CB RSS, Neg activation tests -2 
Entry  Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
Entry  Tue Oct 5 17:30:01 2021, CB RSS, NEG activation tests 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg
Entry  Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
Entry  Mon Oct 4 20:30:46 2021, RSS JM CB (remotely), CARME baking status -21 Screenshot_from_2021-10-04_21-28-28.pngScreenshot_from_2021-10-04_21-29-37.png
Entry  Mon Oct 4 09:19:11 2021, JM RSS, Activation of NEG elements IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG
Entry  Mon Oct 4 06:34:58 2021, RSS JM CB (remotely), CARME baking status -20 Screenshot_from_2021-10-04_07-33-14.pngScreenshot_from_2021-10-04_07-34-14.png
Entry  Sun Oct 3 08:36:01 2021, RSS JM CB (remotely), CARME baking status -19 Screenshot_from_2021-10-03_09-33-30.pngScreenshot_from_2021-10-03_09-34-24.png
Entry  Sat Oct 2 22:14:14 2021, RSS JM CB (remotely), CARME baking status -18 Screenshot_from_2021-10-02_23-12-09.pngScreenshot_from_2021-10-02_23-13-16.png
Entry  Sat Oct 2 08:26:49 2021, RSS JM CB (remotely), CARME baking status -17 Screenshot_from_2021-10-02_09-25-40.pngScreenshot_from_2021-10-02_09-24-44.png
Entry  Fri Oct 1 21:47:51 2021, CB (remotely), CARME baking status -16 screen.pngTemps.png
Entry  Fri Oct 1 07:17:46 2021, RSS JM, CARME baking status -15 Screenshot_from_2021-10-01_08-17-02.pngScreenshot_from_2021-10-01_08-16-41.png
Entry  Thu Sep 30 18:16:52 2021, RSS JM, CARME baking status -14 Screenshot_from_2021-09-30_19-18-44.pngScreenshot_from_2021-09-30_19-18-08.png
Entry  Thu Sep 30 06:29:39 2021, RSS JM, CARME baking status -13 Screenshot_from_2021-09-30_07-29-02.pngScreenshot_from_2021-09-30_07-28-09.png
Entry  Wed Sep 29 15:34:07 2021, RSS JM, CARME baking status -12 Screenshot_from_2021-09-29_16-32-50.pngScreenshot_from_2021-09-29_16-31-48.png
Entry  Wed Sep 29 13:13:51 2021, JM RSS PB(remotely), Detector frame assembley new_carrier_simple_holes.PDFScreenshot_20210929-110343_Telegram.jpg20210930_164625.jpg20210930_164650.jpg
Entry  Wed Sep 29 09:27:38 2021, CB (remotely), RSS JM ML, Power cut 
Entry  Wed Sep 29 06:49:41 2021, RSS JM, CARME baking status -11 Screenshot_from_2021-09-29_07-48-03.pngScreenshot_from_2021-09-29_07-48-36.png
Entry  Tue Sep 28 18:53:13 2021, RSS JM, CARME baking status -10 Screenshot_from_2021-09-28_19-54-16.pngScreenshot_from_2021-09-28_19-51-19.png
Entry  Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9 Screenshot_from_2021-09-28_13-17-51_1.pngScreenshot_from_2021-09-28_13-18-18.png
Entry  Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8 Screenshot_from_2021-09-28_07-38-53.pngScreenshot_from_2021-09-28_07-39-22.png
Entry  Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7 Temps.pngScreen.png
Entry  Mon Sep 27 17:53:35 2021, JM RSS , Baking Jacket upgrade + NEG controllers connected 20210927_151650.jpg20210927_151706.jpg20210927_151721.jpg20210927_170139.jpg
Entry  Mon Sep 27 11:09:48 2021, CB (remotely), Temperature vs Pressure plot Temps.pdf
Entry  Mon Sep 27 06:42:45 2021, RSS JM, CARME baking status -6 Screenshot_from_2021-09-27_07-41-06.pngScreenshot_from_2021-09-27_07-41-39.png
Entry  Sun Sep 26 17:20:13 2021, RSS JM CB (remotely), CARME baking status -5 Screenshot_from_2021-09-26_18-19-26.pngScreenshot_from_2021-09-26_18-18-23.png
Entry  Sun Sep 26 07:41:00 2021, CB (remotely), CARME baking status -4 Temps.pngScreen.png
Entry  Sat Sep 25 19:01:50 2021, CB (remotely), CARME baking status -3 Temps.PNG
Entry  Sat Sep 25 07:23:06 2021, CB (remotely), CARME baking status -2 temp_plot.pngtemps.png
Entry  Fri Sep 24 15:36:34 2021, CB (remotely), CARME baking status Temp.pngTemps.png
Entry  Fri Sep 24 09:44:58 2021, JM ML, Vacuum gauge readout 
Entry  Fri Sep 24 08:47:36 2021, JM RSS CB(Remotely), Baking  
Entry  Fri Sep 24 07:04:57 2021, RSS JM, IE 514 pin arrangement and degas instructions IE514_pin_arrangement.JPGdegas_function.jpg
Entry  Thu Sep 23 14:19:27 2021, CB (remotely), Checking baking remotely - instructions Temp.png
Entry  Thu Sep 23 13:31:12 2021, JM RSS ML, IE514 Gauge and Bakeout 20210923_113239.jpg20210923_134339.jpg20210923_134355.jpg20210923_135954.jpg
Entry  Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent 20210922_145646.jpg20210922_145933.jpg20210922_151728.jpg20210922_152052.jpg20210922_152113.jpg
Entry  Wed Sep 22 08:30:08 2021, CB (remotely), CARME pressure during first XHV test 
Entry  Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
    Reply  Tue Sep 21 08:20:39 2021, ML, CARME installations 
Entry  Sun Sep 19 09:11:34 2021, CB (remotely), Baking RasPi status 
Entry  Fri Sep 17 16:42:25 2021, JM RSS ML + OG, CARME Realignment + Thermocouple installation 8x
Entry  Thu Sep 16 15:24:29 2021, JM RSS, CARME vented + thermocouple feedthrough 1.jpg2.jpg3.jpg
Entry  Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown turbo_pump.pnglog_scale.png
Entry  Fri Sep 10 18:09:14 2021, CB RSS ML, Leak test + baking system test 
Entry  Fri Sep 10 10:50:55 2021, CB RSS ML, Pressure after overnight pump down 20210910_101131.jpg
Entry  Thu Sep 9 13:01:07 2021, CB RSS + OG, All feedthrough flanges mounted and motor rotated 20210909_111933.jpg20210909_112120.jpg20210909_112125.jpg20210909_133027.jpg
Entry  Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
Entry  Wed Sep 8 10:52:54 2021, CB RSS + OG, First feedthrough flange mounted 20210908_101743.jpg20210908_111958.jpg20210908_112002.jpg20210908_112006.jpg20210908_112010.jpg
Entry  Tue Sep 7 14:10:02 2021, CB RSS + OG, Strain relief SS support re-drilled 
Entry  Tue Sep 7 12:40:43 2021, CB ML + RH, CARME survey preparation 
Entry  Tue Sep 7 11:37:05 2021, CB RSS + OG, Update on strain relief screw issues 
Entry  Mon Sep 6 14:13:17 2021, CB ML, Motors mounted - first attempt 20210906_113522.jpg20210906_113519.jpg20210906_115601.jpg20210906_152607.jpg20210906_143944.jpg
Entry  Sat Sep 4 15:54:50 2021, CB RSS, Motor mounting preparation 20210904_162517.jpg20210904_162520.jpg
Entry  Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps 20210903_154614.jpg20210903_162519.jpg
Entry  Fri Sep 3 14:14:40 2021, TD, Leybold IE514 manual & calibration data 20210903_141201.jpgIonivac_Sensors_IE414_IE514.pdf
Entry  Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
Entry  Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 20210903_085646.jpgIMG_4487.JPG
Entry  Thu Sep 2 21:04:26 2021, CB RSS ML + DR OG, Gate valves mounted + pump down 6x
Entry  Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING 20210902_114031.jpg
Entry  Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg
Entry  Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 20210901_125504.jpg20210901_125517.jpg
Entry  Tue Aug 31 18:56:35 2021, CB, CARME status 9x
Entry  Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand 20210831_144545.jpg20210831_171442.jpg20210831_171447.jpg20210831_171449.jpg20210831_171453.jpg
Entry  Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift 16304077162843806956479048661374.jpg16304077904321905824276870110392.jpg
Entry  Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
Entry  Wed Aug 25 07:02:41 2021, RSS TD, 25-31 August 19x
Entry  Wed Aug 18 11:58:49 2021, NTD RSS, Misc fittings and fasteners plus gasket inventory 22x
Entry  Wed Aug 18 07:07:26 2021, RSS TD, 18-24 August 25x
Entry  Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August  23x
Entry  Thu Aug 12 09:16:42 2021, TD RSS, Thursday 12 August 13x
Entry  Wed Aug 11 12:30:40 2021, TD RSS, Wednesday 11 August  8x
Entry  Tue Aug 10 12:22:56 2021, TD RSS, Tuesday 10 August  20210810_115555.jpg20210810_115607.jpg20210810_115617.jpg
Entry  Mon Aug 9 12:36:00 2021, TD, RSS, ABD, Monday 9 August 7x
Entry  Mon Dec 7 14:29:12 2020, JM, CARME packing up 20201207_122353.jpg20201207_113905.jpg20201207_110714.jpg
Entry  Fri Dec 4 16:49:36 2020, TD, Friday 4 December 7x
Entry  Wed Nov 25 10:39:37 2020, TD, Wednesday 25 November 7x
Entry  Tue Nov 24 12:24:01 2020, JM, RGA scans 20201124_124107.jpg
Entry  Tue Nov 10 12:25:29 2020, JM, Cable harnesses 20201102_155336.jpgFigure_1.png20201102_154648.jpgPhotos.zip
Entry  Thu Oct 29 08:02:29 2020, CB, JM (remotely), CARME pressure 20201029_080001.jpgBakeout_pump_down.png20201119_temps.png
Entry  Wed Oct 28 10:41:57 2020, TD, Wednesday 28 October 6x
Entry  Mon Oct 26 10:35:05 2020, JM, CB(remotely), Cooling Screenshot_from_2020-10-26_14-10-08.png20201027_0803_temps.png27102020_pump_down.png27102020_pump_down.png
Entry  Thu Oct 22 22:15:00 2020, CB (remotely), Cooling down after first NEG activation 7x
Entry  Thu Oct 22 10:39:40 2020, TD, Thursday 22 October 19x
Entry  Mon Oct 19 13:57:52 2020, JM, Neg Activation Photos.zip20201019_154921.jpg
Entry  Mon Oct 12 10:49:36 2020, JM, First Bakeout of CARME with pumps (cont) temp6.png
Entry  Mon Oct 5 08:21:40 2020, CB (remotely), JM, First bake of CARME with pumps (cont.) 6x
Entry  Wed Sep 30 08:10:36 2020, CB (remotely), First bake of CARME with pumps 19x
Entry  Mon Sep 28 13:04:27 2020, JM, Baking 20200928_081831.jpg20200928_130239.jpg
Entry  Sat Sep 26 09:31:46 2020, JM, CB (both remotely), Baking over weekend temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png
Entry  Fri Sep 25 12:58:33 2020, JM, Friday 25/09/20 Photos.zip
Entry  Thu Sep 24 10:04:58 2020, JM, TD, Thursday 24 September 20200924_152852.jpgPhotos.zip
Entry  Wed Sep 23 13:34:32 2020, JM, TD, Wednesday 23 September 20200923_170441.jpg20200923_170455.jpg20200923_170415.jpg20200923_161415.jpg20200923_161402.jpg
Entry  Wed Sep 23 13:34:04 2020, JM, Tuesday 22 September 
Entry  Mon Sep 21 09:51:57 2020, JM, CARME Status Graphs.zip
Entry  Fri Sep 18 10:28:57 2020, JM, CB(remotely), Baking status 20200918_1029_temps.png
Entry  Thu Sep 17 10:13:43 2020, JM, CB(remotely), Bakeout cooling and pumping of chamber Photos.zip20200917_1428_temp_last.png
Entry  Wed Sep 16 17:46:36 2020, JM, Pumping of Chamber Photos.zip
Entry  Wed Sep 16 08:52:03 2020, CB (remotely), Baking status 16-17 September 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png
Entry  Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status  20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png
Entry  Mon Sep 14 12:07:40 2020, JM, CB (remotely), Baking status 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png
Entry  Sun Sep 13 08:06:25 2020, CB (remotely), Baking over the weekend -2 20201309_0806_ctrl.png20201309_0806_plot.png
Entry  Sat Sep 12 08:38:52 2020, CB (remotely), Baking over the weekend 20200912_0839_ctrl.png20200912_0839_plot.png
Entry  Thu Sep 10 11:34:30 2020, TD, JM, Thursday 10 September  20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip
Entry  Wed Sep 9 21:01:48 2020, JM, Neg Feedthroughs Photos.zip
Entry  Fri Sep 4 15:48:25 2020, JM, Bakeout test completed 191214004923_temperatures.txtBakeout1.png
Entry  Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation Photos.zip
Entry  Wed Aug 19 16:44:39 2020, JM, Neg Installs Photos_(1).zip
Entry  Tue Aug 18 17:35:20 2020, TD, SAES UHV1400 pin assignment NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf
Entry  Tue Aug 18 11:26:26 2020, JM, Week ending Friday 14/08/20 Photo.zip
Entry  Mon Aug 17 08:16:16 2020, TD, CARME Elog 
ELOG V3.1.4-unknown