AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 433     Entry time: Sat Aug 12 11:57:51 2023
Author: JM 
Subject: Updated thermocouple positions and heater channel layouts 

Heater channel layouts for the interaction chamber and carme in attached documents. 

Updated thermocouple positions; (front section is closest to gas-target, rear section is moving detector end)

  • 1-1 Internal TC 1
  • 1-2 Internal TC 2
  • 1-3 Internal TC 3
  • 1-4 CARME - top of the front section
  • 1-5 CARME - bottom of the front section
  • 1-6 CARME - top of the mid section
  • 1-7 CARME - middle of the mid section
  • 1-8 CARME - bottom of the mid section
  • 2-1 Float - bottom of mid section 
  • 2-2 CARME - middle of rear section 
  • 2-3 Float - middle of the front section
  • 2-4 CARME - bottom VAT valve
  • 2-5 Float - middle of the rear section 
  • 2-6 CARME - Top elbow
  • 2-7 Float - top of the mid section
  • 2-8 CARME - rear beam pipe

Thermocouple posiitons have been updated in the monitoring code, including the averages for the CARME chamber. 

Attachment 1: Cryring-YR09-CARME-Layout.pdf  659 kB  | Hide | Hide all
Cryring-YR09-CARME-Layout.pdf
Attachment 2: Cryring-YR09-CARME-Layout2.pdf  534 kB  | Hide | Hide all
Cryring-YR09-CARME-Layout2.pdf
Attachment 3: Cryring-YR09-CARME-Layout3.pdf  526 kB  | Hide | Hide all
Cryring-YR09-CARME-Layout3.pdf
Attachment 4: Cryring-YR09-eTarget-Layout1.pdf  845 kB  Uploaded Mon Aug 14 14:11:52 2023  | Hide | Hide all
Cryring-YR09-eTarget-Layout1.pdf
Attachment 5: Cryring-YR09-eTarget-Layout2.pdf  543 kB  Uploaded Mon Aug 14 14:12:06 2023  | Hide | Hide all
Cryring-YR09-eTarget-Layout2.pdf
Attachment 6: Cryring-YR09-eTarget-Layout3.pdf  544 kB  Uploaded Mon Aug 14 14:12:18 2023  | Hide | Hide all
Cryring-YR09-eTarget-Layout3.pdf
ELOG V3.1.4-unknown