Heater channel layouts for the interaction chamber and carme in attached documents.
Updated thermocouple positions; (front section is closest to gas-target, rear section is moving detector end)
- 1-1 Internal TC 1
- 1-2 Internal TC 2
- 1-3 Internal TC 3
- 1-4 CARME - top of the front section
- 1-5 CARME - bottom of the front section
- 1-6 CARME - top of the mid section
- 1-7 CARME - middle of the mid section
- 1-8 CARME - bottom of the mid section
- 2-1 Float - bottom of mid section
- 2-2 CARME - middle of rear section
- 2-3 Float - middle of the front section
- 2-4 CARME - bottom VAT valve
- 2-5 Float - middle of the rear section
- 2-6 CARME - Top elbow
- 2-7 Float - top of the mid section
- 2-8 CARME - rear beam pipe
Thermocouple posiitons have been updated in the monitoring code, including the averages for the CARME chamber. |