AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 234     Entry time: Tue Feb 22 10:30:00 2022
Author: RSS, OF, ML 
Subject: Beam OFF, Target ON Run 54  

11:30

Beam optimisation. No beam since 09:25.

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

Beam optimization will be done until 3 pm and will be then give for the experiment.

Attachment 1: 11-ex-2022-02-22_11-30-44.png  158 kB  | Hide | Hide all
11-ex-2022-02-22_11-30-44.png
Attachment 2: 11-ey-2022-02-22_11-30-12.png  158 kB  | Hide | Hide all
11-ey-2022-02-22_11-30-12.png
Attachment 3: 11-xy-2022-02-22_11-31-13.png  209 kB  | Hide | Hide all
11-xy-2022-02-22_11-31-13.png
Attachment 4: 11-adc-2022-02-22_11-27-37.png  102 kB  | Hide | Hide all
11-adc-2022-02-22_11-27-37.png
Attachment 5: 11-good-2022-02-22_11-28-00.png  103 kB  | Hide | Hide all
11-good-2022-02-22_11-28-00.png
Attachment 6: 11-temp-2022-02-22_11-26-26.png  112 kB  | Hide | Hide all
11-temp-2022-02-22_11-26-26.png
Attachment 7: 11-merger-2022-02-22_11-28-52.png  127 kB  | Hide | Hide all
11-merger-2022-02-22_11-28-52.png
Attachment 8: 11-leakage-2022-02-22_11-29-09.png  21 kB  | Hide | Hide all
11-leakage-2022-02-22_11-29-09.png
Attachment 9: 11-spectrum-2022-02-22_11-27-12.png  176 kB  | Hide | Hide all
11-spectrum-2022-02-22_11-27-12.png
Attachment 10: 11-correlation-2022-02-22_11-28-26.png  102 kB  | Hide | Hide all
11-correlation-2022-02-22_11-28-26.png
ELOG V3.1.4-unknown