AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 76     Entry time: Thu Sep 23 13:31:12 2021
Author: JM RSS ML 
Subject: IE514 Gauge and Bakeout 

CARME setup checked by vaccum group this morning. 

Both IE514 gauges de-gassed. To de-gas on the CM52 controller select the channel and hold the right arrow for two seconds. The reading will flash indicating the de-gassing procedure, this lasts for 2 minutes before completing. Flashing automatically stops once procedure finishes. Attached for convinience is the wire colour-pin assignment for the gauge head again.

Baking jacket fully assembled around CARME and baking code updated. Temperature and rate limits updated to match thermocouples around the chamber.

                        Max Temperature                Max Rate

Chamber                155C                               10C

Floating                  175C                              150C

Octagon (outside tent)  50C                           10C 

 Automatic baking started at 13:50, pressure was 1.69e-7 mbar

Attachment 1: 20210923_113239.jpg  612 kB  Uploaded Thu Sep 23 14:40:50 2021  | Hide | Hide all
20210923_113239.jpg
Attachment 2: 20210923_134339.jpg  1.523 MB  Uploaded Thu Sep 23 14:41:37 2021  | Hide | Hide all
20210923_134339.jpg
Attachment 3: 20210923_134355.jpg  1.501 MB  Uploaded Thu Sep 23 14:42:36 2021  | Hide | Hide all
20210923_134355.jpg
Attachment 4: 20210923_135954.jpg  1.849 MB  Uploaded Thu Sep 23 14:43:00 2021  | Hide | Hide all
20210923_135954.jpg
ELOG V3.1.4-unknown