AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 63     Entry time: Wed Sep 8 10:52:54 2021
Author: CB RSS + OG 
Subject: First feedthrough flange mounted 
Assembled feedthrough flange with re-cut 
SS support bracket. M3 vented on the 
sides, M3x30 partly threaded on top. Top 
screws don't touch the 
Macor (by design? See first attachment). 
Macor affixed but has 
some play - good for thermal dilation.

Mounted long wire harness (side flange) on 
top. Unable to get one of the two 
connectors fully in. Unable to get it out 
as well. See last attach, it's a small gap. 
Tested few pins with multimeter - all ok. 
Decided to mount.

No issues mounting. Slowly and carefully 
threaded wires harness in CARME taking 
care not to hit negs.

Slightly concerned about weight of Macor 
connector on wires, but no obvious 
alternative.

Please have a look at attachments and 
comment. Will keep mounting in the 
afternoon.
Attachment 1: 20210908_101743.jpg  1.621 MB  Uploaded Wed Sep 8 12:00:36 2021  | Hide | Hide all
20210908_101743.jpg
Attachment 2: 20210908_111958.jpg  2.437 MB  Uploaded Wed Sep 8 12:01:54 2021  | Hide | Hide all
20210908_111958.jpg
Attachment 3: 20210908_112002.jpg  1.995 MB  Uploaded Wed Sep 8 12:02:15 2021  | Hide | Hide all
20210908_112002.jpg
Attachment 4: 20210908_112006.jpg  2.607 MB  Uploaded Wed Sep 8 12:02:38 2021  | Hide | Hide all
20210908_112006.jpg
Attachment 5: 20210908_112010.jpg  2.413 MB  Uploaded Wed Sep 8 12:03:04 2021  | Hide | Hide all
20210908_112010.jpg
ELOG V3.1.4-unknown