|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME |
 |
|
Message ID: 126
Entry time: Sun Oct 17 11:48:48 2021
|
Author: |
TD RSS |
Subject: |
Sunday 17 October |
|
|
Looking downstream the RHS motor assembly has loose green/yellow (gnd?) see attachment 1
Install blank base plate to trial install in downstream CARME chamber. The rod is just through all of the mounting holes - see attachments 2 & 3
The rod, plate and block are close fitting.
The current position of the TC feedthrough is incompatible wit detector movement- the TC feedthrough should be moved.
Detector baseplate with 1x DSSSD installed - attachments 4 - 6, Cabling length looks OK.
Should move NEG power and TCs to top & bottom DN40 flanges to avoid conflicts with DSSSDs and cabling. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|