AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 51     Entry time: Wed Sep 1 17:14:16 2021
Author: CB RSS + DR ML 
Subject: CARME mounted on the CRYRING 
Lifted CARME with Al support on the 
CRYRING. No issues during transportation. 

Drilled new holes in the Al feet to fit 
elephant feet. Unclear if the issue is 
with the model, the frame or the feet 
themselves. In any case this issue is 
sorted.

CARME was designed to interface with the 
CRYRING via the cross section with pumps 
and sensors that we decided dismount. To 
replace this section a length of xhv 
tubing and a bellow will be employed. 
Prepared today, to be mounted tomorrow.

Aligned CARME height with beam height. 
This posed issues due to difficulty to 
adjust bolts under the cross members used 
to support the motors. See previous log 
entry.

Bolts under those cross members are now 
only finger tight. Unclear whether the 
CARME section will drop slightly if 
disconnected from main body. It's the 
section housing the moving Dssds. May be 
an issue for tightening it back. Will 
investigate.

Gate valves and supports to be installed 
tomorrow morning.
Attachment 1: 20210901_162435.jpg  3.254 MB  Uploaded Wed Sep 1 18:22:51 2021  | Hide | Hide all
20210901_162435.jpg
Attachment 2: 20210901_173059.jpg  1.994 MB  Uploaded Wed Sep 1 18:23:32 2021  | Hide | Hide all
20210901_173059.jpg
Attachment 3: 20210901_174157.jpg  2.162 MB  Uploaded Wed Sep 1 18:24:00 2021  | Hide | Hide all
20210901_174157.jpg
Attachment 4: 20210901_134635.jpg  3.525 MB  Uploaded Wed Sep 1 18:24:38 2021  | Hide | Hide all
20210901_134635.jpg
Attachment 5: 20210901_173059.jpg  1.994 MB  Uploaded Wed Sep 1 18:25:34 2021  | Hide | Hide all
20210901_173059.jpg
ELOG V3.1.4-unknown