08:57 Doing morning check. Checked the leakage currents, all ok. Attachment 1
Tempritures of, attchment 2
System wide check, all correct.
Statistics ok, aida 4 was a little high, carlo oked it attachment 3 and 4 (hist)
Spectrum brozer, ok, attachment 5 and 6
Waveforem atachment 7 and 8
Checked merger, spinner spinning...
Attached screenshot of merger 9
11:15 Beam current is around 2.5E7 and the target dencity is 5.3E11 cm2, there was small isntability (dips) from the beam, reason unknown, all detectors stable.
Check leakage current, is stable, attachment 1
Tempreture ok, attachment 2
System wide check, all pass
Statistics checked, attachment 3, aida 4 is still high, histograms attachment 4
Spectrum browser ok, attachment 5 and 6
Waveforms attachment 7 and 8
Checked merger, ok, spinner is spinning,
Attachment 9 is the merger info
12:21 Targer intencity started dropping quite dramatically. The beam position X value was adjusted to -11000, we got back above 4E11 /cm2
13:08 Beam current is around 2.5E7 pretty stable, target is working, 61E11 /cm2, stable
Checked leakage current, stable, attachment 1
Temp. stable, atatchment 2
System wide chack, all pass
Statistics checked, attachemnt 3, aida 4 should be checked, histogram of rates 4 attached
Spectrum browser, attached 5 and 6
Waveform attached 7 and 8
Merger ok, spinner is pinning,
Attached 9 merger info
|