AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 75     Entry time: Wed Sep 22 14:44:51 2021
Author: JM RSS ML 
Subject: CARME leak test + bakeout tent 

On 21/9/21 CARME was connected to the leak tester. Leak testing showed no apparent leaks, extra time required to reach <1e-4 mbar during initial turbo pumpdown might be due to outgassing from additional installed components on the chamber. Turbo pump restarted 

21/9/21 16:28    9.73e-7 mbar

21/9/21 16:48     8.92e-7 mbar

21/9/21  17:28    7.88e-7 mbar

elog 74 contains the pressure taken every hour after this point from the webcam. 

 

NEG and NEG-ion cables for controller modules connected to feedthroughs on the CARME chamber. Feedthroughs have been electrically checked and are OK.

CARME baking jacket constructed around chamber. Thermocouples in place around the chamber. Vacuum group are coming tomorrow morning to inspect and de-gas installed gauge, after they are finished we mount final pieces of baking jacket and begin baking.  

 

Attachment 1: 20210922_145646.jpg  1.238 MB  Uploaded Wed Sep 22 16:06:22 2021  | Hide | Hide all
20210922_145646.jpg
Attachment 2: 20210922_145933.jpg  1.607 MB  Uploaded Wed Sep 22 16:06:54 2021  | Hide | Hide all
20210922_145933.jpg
Attachment 3: 20210922_151728.jpg  2.423 MB  Uploaded Wed Sep 22 16:07:31 2021  | Hide | Hide all
20210922_151728.jpg
Attachment 4: 20210922_152052.jpg  1.686 MB  Uploaded Wed Sep 22 16:08:20 2021  | Hide | Hide all
20210922_152052.jpg
Attachment 5: 20210922_152113.jpg  1.431 MB  Uploaded Wed Sep 22 16:08:45 2021  | Hide | Hide all
20210922_152113.jpg
ELOG V3.1.4-unknown