Message ID: 55
Entry time: Fri Sep 3 08:14:51 2021
|
Author: |
CB RSS |
Subject: |
Issues foreseeable splitting CARME |
|
|
In order to install the detector supports
and eventually install the detectors
themselves CARME must be split and
separated via rails.
However it does not look like we have
sufficient clearance on either side. See
pictures attached.
I suggest we mount the strain relievers
wires and motors, not split CARME, and
pump down + bake to give us time to figure
out what is different from the models and
how to fix it. Outgassing from detector
supports should be negligible wrt wires.
One possibility would be to install rail
extension on the back side of the Al frame
where the cross was meant to be supported,
temporarily remove the tube connecting
CARME to the YR09 valve and slide CARME
back. Will need to discuss with Peter. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|