Subject: Issues foreseeable splitting CARME 
In order to install the detector supports 
and eventually install the detectors 
themselves CARME must be split and 
separated via rails.

However it does not look like we have 
sufficient clearance on either side. See 
pictures attached.

I suggest we mount the strain relievers 
wires and motors, not split CARME, and 
pump down + bake to give us time to figure 
out what is different from the models and 
how to fix it. Outgassing from detector 
supports should be negligible wrt wires.

One possibility would be to install rail 
extension on the back side of the Al frame 
where the cross was meant to be supported, 
temporarily remove the tube connecting 
CARME to the YR09 valve and slide CARME 
back. Will need to discuss with Peter.
Attachment 1: 20210903_085801.jpg  2.326 MB  Uploaded Fri Sep 3 09:31:54 2021  | Hide | Hide all
20210903_085801.jpg
Attachment 2: 20210903_085805.jpg  2.970 MB  Uploaded Fri Sep 3 09:32:33 2021  | Hide | Hide all
20210903_085805.jpg
Attachment 3: 20210903_085811.jpg  1.809 MB  Uploaded Fri Sep 3 09:33:02 2021  | Hide | Hide all
20210903_085811.jpg
Attachment 4: 20210903_085822.jpg  1.998 MB  Uploaded Fri Sep 3 09:33:57 2021  | Hide | Hide all
20210903_085822.jpg
Attachment 5: 20210903_085958.jpg  2.085 MB  Uploaded Fri Sep 3 09:34:35 2021  | Hide | Hide all
20210903_085958.jpg
Attachment 6: 20210903_090003.jpg  2.969 MB  Uploaded Fri Sep 3 09:37:06 2021  | Hide | Hide all
20210903_090003.jpg
Attachment 7: 20210903_090024.jpg  2.929 MB  Uploaded Fri Sep 3 09:39:05 2021  | Hide | Hide all
20210903_090024.jpg
ELOG V3.1.4-unknown