AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 37     Entry time: Fri Apr 13 14:42:31 2018
Author: Thomas Chillery, Lucio Gialanella 
Subject: 7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7  

Date: 07/04/2018

To run the measurement we:

  • Opened the central iris (actuator setting = 14.0mm)
  • Opened the downstream iris (actuator setting = 1.5mm)
  • Set the target ladder to position IV (50.015mm)- CH2 Target III

At 14:40 we started the DAQ for 5.0MeV 7Be in the 2+ charge state on CH2 Target III

  • DT = 0%
  • Trigger rate ~ 10Hz
  • Event mult = 71.2
  • Save name: 180407134535

At 15:04 we stopped the DAQ

  • The proton spectrum seems very thin
  • Decided to change to fresh CH2 target IV

 

ELOG V3.1.4-unknown