Message ID: 39     Entry time: Fri Apr 13 15:08:04 2018
Author: Thomas Chillery, Lucio Gialanella 
Subject: End of shift - lab cleanup 

Date: 07/04/2018

Began dismounting detectors:

  • All detectors powered off
  • Closed line and quadrupole valves
  • Preamp power off
  • Stopped turbos
  • Closed manual gate valve and T1600 Backing valve
  • Stopped Ecodry 1 and 2 roughing pumps
  • Switched off CAMAC and RAL electronic crates
  • FC - 0 suppression voltage switched off (was set to -360V for beam measurements)
  • Switched off both NIM crates

After venting the chamber I dismounted both S2 detectors and the 12um mylar in front of each detector

I also dismounted the diode from the chamber, but left the 0.9um mylar glued onto the 4mm diameter metal collimator

I left the target ladder in the chamber

I remounted the central and downstream lids onto the chamber, the diode mount with mylar was left mounted on the central lid

We performed a general cleanup around the lab of the tools used during this shift

At 19:30 we left the lab ^_^