Date: 07/04/2018
Began dismounting detectors:
- All detectors powered off
- Closed line and quadrupole valves
- Preamp power off
- Stopped turbos
- Closed manual gate valve and T1600 Backing valve
- Stopped Ecodry 1 and 2 roughing pumps
- Switched off CAMAC and RAL electronic crates
- FC - 0 suppression voltage switched off (was set to -360V for beam measurements)
- Switched off both NIM crates
After venting the chamber I dismounted both S2 detectors and the 12um mylar in front of each detector
I also dismounted the diode from the chamber, but left the 0.9um mylar glued onto the 4mm diameter metal collimator
I left the target ladder in the chamber
I remounted the central and downstream lids onto the chamber, the diode mount with mylar was left mounted on the central lid
We performed a general cleanup around the lab of the tools used during this shift
At 19:30 we left the lab ^_^ |