AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 63     Entry time: Mon Dec 3 16:47:40 2018
Author: Thomas Chillery, Carlo Bruno, Lizeth Morales 
Subject: Finishing 3.0MeV 7Be measurements with CH2 XIX and natC III 

On 27/11/2018:

At 8:40 Far S2 bias = -130.0V, leak I = 1.74uA. Diode bias = -70.1V, leak I = 0.00uA.

Pressures (mBar):

  • TPU1 = 8.3e-7
  • TPU2 = 3.4e-7
  • TPD1 = 6.5e-7
  • TPD2 = 6.5e-7
  • CHUP = Sensor Off
  • CHDW = No Sensor

Preamps still drawing necessary currents.

Stopped overnight run of 3.0MeV 7Be 2+ on CH2 XIX

Checked beam current: FC4 = 2pA.

Moved ladder to position #5 - natC III

Run # 181127085408

  • Run time: 627s
  • Pulser ON, as before
  • Target: natC III
  • Beam: 3.0MeV 7Be 2+
  • DT ~ 23%
  • See attached picture 1 for sample S2 front strip spectrum. See attached picture 2 for diode spectrum.

Moved ladder to position #2 - 10mm aperture

Run # 181127090808

  • Run time: 601s
  • Pulser ON, as before
  • Target: Blank 10mm aperture
  • Beam: 3.0MeV 7Be 2+
  • DT ~ 10%
  • See attached picture 3 for Far S2 innermost strip spectrum.

Moved ladder to position #7 - CH2 XIX

Run # 181127092128

  • Run time: 663s
  • Pulser ON, as before
  • Target: CH2 XIX
  • Beam: 3.0MeV 7Be 2+
  • DT ~ 10%
  • See attached picture 4 for sample S2 front strip spectrum. See attached picture 5 for diode spectrum.

* End of 7Be beam *

Attachment 1: 181127085408_ADC1_Ch9.png  33 kB  | Hide | Hide all
181127085408_ADC1_Ch9.png
Attachment 2: 181127085408_ADC3_Ch16.png  26 kB  | Hide | Hide all
181127085408_ADC3_Ch16.png
Attachment 3: 181127090808_ADC1_24.png  32 kB  | Hide | Hide all
181127090808_ADC1_24.png
Attachment 4: 181127092128_ADC1_Ch9.png  27 kB  | Hide | Hide all
181127092128_ADC1_Ch9.png
Attachment 5: 181127092128_ADC3_Ch16.png  28 kB  | Hide | Hide all
181127092128_ADC3_Ch16.png
ELOG V3.1.4-unknown