AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 70     Entry time: Mon Dec 3 18:30:53 2018
Author: Thomas Chillery, Raffaele Buompane 
Subject: Calibration with alpha source - 12um mylar on Far S2 

On 28/11/2018:

Mounted 12um mylar in front of far S2 - see attached pictures 1 and 2

In air: Far S2 biased to -130.0V, leak I = 1.61uA. Diode biased to -70.1V, leak I = 0.01uA -> 0.00uA. Rate meter ~ 4500Hz.

Detectors switched off

17:50 started Ecodry 1 and 2, started opening manual valve.

18:00 Manual valve fully opened, T1600 backing valve opened, Turbos switched on.

Once pressures ~ 1e-5mBar, far S2 bias = -130.0V, leak I = 1.59uA. Diode bias = -70.1V, leak I = 0.00uA.

18:08 Pressures (mBar):

  • TPU1 = 3.0e-5
  • TPU2 = 6.0e-5
  • TPD1 = 5.2e-6
  • TPD2 = 8.7e-6
  • CHUP = Sensor Off
  • CHDW = No Sensor

Run # 181128181421

  • Run time: 1799s
  • Pulser ON, as before
  • Alpha source
  • S2 mylar: 12um
  • DT ~ 12%

Started overnight run:

Run # 181128184505

  • Run time: 51706s
  • Pulser ON, as before
  • Alpha source
  • S2 mylar: 12um
  • DT ~ 8%
  • See attached picture 3 for sample far S2 front strip spectrum

18:50 End of day check:

Far S2 bias = -130.0V, leak I = 1.60uA.

Diode bias = -70.1V, leak I = 0.00uA.

Pressures (mBar):

  • TPU1 = 3.8e-6
  • TPU2 = 1.2e-6
  • TPD1 = 1.4e-6
  • TPD2 = 1.6e-6
  • CHUP = Sensor Off
  • CHDW = No Sensor

On 29/11/2018: Alpha run stopped

9:05: Far S2 bias = -130.0V, leak I = 1.70uA. Diode bias = -70.1V, leak I = 0.00uA.

Detector biases and preamps off.

Pressures (mBar):

  • TPU1 = 7.6e-7
  • TPU2 = 3.5e-7
  • TPD1 = 7.7e-7
  • TPD2 = 7.3e-7
  • CHUP = Sensor Off
  • CHDW = No Sensor

Closed manual and T1600 backing valves. Stopped turbos. Stopped Ecodry 1 and 2.

Switched off Nim bin, RAL crate, and CAMAC crate

9:45 Opened venting valve

Attachment 1: IMG_3356.JPG  2.633 MB  | Hide | Hide all
IMG_3356.JPG
Attachment 2: IMG_3363.JPG  2.752 MB  | Hide | Hide all
IMG_3363.JPG
Attachment 3: 181128184505_ADC1_Ch9.png  37 kB  | Hide | Hide all
181128184505_ADC1_Ch9.png
ELOG V3.1.4-unknown