ID Date Author Subject Text Attachments
  9   Thu Mar 2 13:00:06 2017 DK26Al ground state beamAttachment 1 shows a comparison of the zero-degree
telescope from the decay measurement with
the 26gAl beam produced today (left side)
 beta-spectrum-exp-v-sim.png 
  8   Wed Feb 22 14:06:47 2017 HSNaI preparationToday we took datas of NaI detectors one
by one for calibration. The gamma ray source
was put on the NaI surfaces so that peaks
 NaICalibration_Cs137.pdfNaICalibration.pdf 
  7   Wed Feb 22 05:31:42 2017 DKFacility NotesHere I make a running log for CRIB general
notes that may be useful for future experiments.
  
  6   Tue Feb 21 16:28:19 2017 HSNaI adjustmentYesterday we improved NaI spectra by checking
them one by one with lead blocks stacked
as a housing. Though the threshold levels
  
  5   Tue Feb 21 12:46:24 2017 DKF2, beta tests of SSDsStatus of today's work to follow...

===F0===
  
  4   Mon Feb 20 10:01:06 2017 DKF0, PPAC, and DSSD signal checksToday the following was performed:

===F0===
  
  3   Sat Feb 18 11:10:49 2017 DKDSSD mappingToday we set up and labelled the amplifiers
and feedthroughs from E7 to J1.  Unrelated
to that, when we arrived at 13:45 the F3
  
  2   Fri Feb 17 11:33:45 2017 DKMeeting Memo and Prep StatusIn today's meeting, the following points were
discussed / revised / added considering the
Inventory and Status eLog.
  
  1   Thu Feb 16 10:05:04 2017 DKStatus and InventoryToday I surveyed the lab and associated rooms
to determine open questions and the required
preparation work.
  