ID |
Date |
Author |
Subject |
Text |
 |
9
|
Thu Mar 2 13:00:06 2017 |
DK | 26Al ground state beam | Attachment 1 shows a comparison of the zero-degree
telescope from the decay measurement with
the 26gAl beam produced today (left side) |
|
8
|
Wed Feb 22 14:06:47 2017 |
HS | NaI preparation | Today we took datas of NaI detectors one
by one for calibration. The gamma ray source
was put on the NaI surfaces so that peaks |
 |
7
|
Wed Feb 22 05:31:42 2017 |
DK | Facility Notes | Here I make a running log for CRIB general
notes that may be useful for future experiments.
|
|
6
|
Tue Feb 21 16:28:19 2017 |
HS | NaI adjustment | Yesterday we improved NaI spectra by checking
them one by one with lead blocks stacked
as a housing. Though the threshold levels |
|
5
|
Tue Feb 21 12:46:24 2017 |
DK | F2, beta tests of SSDs | Status of today's work to follow...
===F0===
|
|
4
|
Mon Feb 20 10:01:06 2017 |
DK | F0, PPAC, and DSSD signal checks | Today the following was performed:
===F0===
|
|
3
|
Sat Feb 18 11:10:49 2017 |
DK | DSSD mapping | Today we set up and labelled the amplifiers
and feedthroughs from E7 to J1. Unrelated
to that, when we arrived at 13:45 the F3 |
|
2
|
Fri Feb 17 11:33:45 2017 |
DK | Meeting Memo and Prep Status | In today's meeting, the following points were
discussed / revised / added considering the
Inventory and Status eLog.
|
|
1
|
Thu Feb 16 10:05:04 2017 |
DK | Status and Inventory | Today I surveyed the lab and associated rooms
to determine open questions and the required
preparation work.
|
|