AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CRIB, Page 1 of 1  ELOG logo
Entry  Thu Mar 2 13:00:06 2017, DK, 26Al ground state beam beta-spectrum-exp-v-sim.png
Attachment 1 shows a comparison of the zero-degree telescope from the decay measurement with the 26gAl beam produced today (left side) and a GEANT4 simulation
by Shimizu kun 
some months ago.  
Entry  Wed Feb 22 14:06:47 2017, HS, NaI preparation NaICalibration_Cs137.pdfNaICalibration.pdf
Today we took datas of NaI detectors one by one for calibration. The gamma ray source was put on the NaI surfaces so that peaks could clealy appear where
we expected.

We fitted them with gaussian and exponential, and integrate the peaks to calculate yields. The results were pretty good. 
Entry  Wed Feb 22 05:31:42 2017, DK, Facility Notes 
Here I make a running log for CRIB general notes that may be useful for future experiments.

1) The camac initialization scripts stored on analys2 PC should also be made into experiment-by-experiment directories.  Particularly settings for the
Entry  Tue Feb 21 16:28:19 2017, HS, NaI adjustment 
Yesterday we improved NaI spectra by checking them one by one with lead blocks stacked as a housing. Though the threshold levels of CFDs were few mV
or less than 20mV and a bias of NaI7 might be high (~1500V), the shapes of spectra looked OK. Now 511keV peaks are around 1500ch in every sprctra.

## To-do list for NaI detectors ##
Entry  Tue Feb 21 12:46:24 2017, DK, F2, beta tests of SSDs 
Status of today's work to follow...

===F0===
Entry  Mon Feb 20 10:01:06 2017, DK, F0, PPAC, and DSSD signal checks 
Today the following was performed:

===F0===
Entry  Sat Feb 18 11:10:49 2017, DK, DSSD mapping 
Today we set up and labelled the amplifiers and feedthroughs from E7 to J1.  Unrelated to that, when we arrived at 13:45 the F3 pressure was 1 x 10^-3 Pa,
and at 19:45 
departure it had dropped to 9 x 10^-4 Pa.
Entry  Fri Feb 17 11:33:45 2017, DK, Meeting Memo and Prep Status 
In today's meeting, the following points were discussed / revised / added considering the Inventory and Status eLog.

Simultaneously I discuss today's work where applicable.
Entry  Thu Feb 16 10:05:04 2017, DK, Status and Inventory 
Today I surveyed the lab and associated rooms to determine open questions and the required preparation work.

=== F0 ===
ELOG V3.1.4-unknown